• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 36 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 11.10-1A227-F4.18.0Ph2Section 26.11.3.1.1 - Location updating / accepted - delete expected sequence step 8) Details 134    Details 97-332 approved SMG74.19.0
See details 11.10-1A226-F4.18.0Ph2Section 20.3 - wait time in step i) Details 133    Details 97-334 approved SMG74.19.0
See details 11.10-1A225-F4.18.0Ph2Sections 32.11.5 and 32.12.5 - time difference Dt in requirement 2) Details 132    Details 97-334 approved SMG74.19.0
See details 11.10-1A224-F4.18.0Ph2Timing requirement in section 26.7.4.3.2.3 step 88 Details 130    Details 97-330 approved SMG74.19.0
See details 11.10-1A223-F4.18.0Ph2Section 21.3 - Superfluous steps g) and h), and editorials Details 127    Details 97-334 approved SMG74.19.0
See details 11.10-1A222-F4.18.0Ph2Section 13.4 Table 13-7, DCS1800 values for offests >= 6000 kHz Details 126    Details 97-334 approved SMG74.19.0
See details 11.10-1A221-F4.18.0Ph2Section 13.4 - Bandwidth of reference measurements Details 125    Details 97-334 approved SMG74.19.0
See details 11.10-1A220-F4.18.0Ph2Errors in the Multiband default message contents Details 277    Details 97-332 approved SMG74.19.0
See details 11.10-1A219-F4.18.0Ph2Section 26.6.11.1 Classmark Change Procedure Details 275    Details 97-332 approved SMG74.19.0
See details 11.10-1A218-F4.18.0Ph2Channel Mode IE needed to assign an appropriate channel Details 276    Details 97-331 approved SMG74.19.0
See details 11.10-1A215-F4.18.0Ph2SIM simulator functional requirements - voltage measurement uncertainty in connection with current spikes Details 264    Details 97-333 approved SMG74.19.0
See details 11.10-1A214-C4.18.0Ph2SIM/ME Interface: 3V/5V Switching Details 263    Details 97-333 approved SMG74.19.0
See details 11.10-1A213-F4.18.0Ph226.6.4.1 - Timing requirements after ASSIGNMENT COMMAND Details 261    Details 97-331 approved SMG74.19.0
See details 11.10-1A212-F4.18.0Ph2DISC / UA exchange in test 26.5.5.2.3 Details 257    Details 97-332 approved SMG74.19.0
See details 11.10-1A211-B4.18.0Ph2EFR for section 26.6 Details 256    Details 97-329 approved SMG74.19.0
See details 11.10-1A210-B4.18.0Ph2EFR phase 2 to 26.10 Details 255    Details 97-329 approved SMG74.19.0
See details 11.10-1A209-B4.18.0Ph2EFR to 26.9 Details 254    Details 97-329 approved SMG74.19.0
See details 11.10-1A208-B4.18.0Ph2EFR for sections 0 to 10 Details 253    Details 97-329 approved SMG74.19.0
See details 11.10-1A206-B4.18.0Ph2EFR tests for phase 2 Details 246    Details 97-328 approved SMG74.19.0
See details 11.10-1A205-F4.18.0Ph2Attempt counter reset Details 244    Details 97-330 approved SMG74.19.0
See details 11.10-1A204-F4.18.0Ph2Clarification of action on expiry of T3210 in 26.7.4.3.2 and 26.7.4.3.3 Details 243    Details 97-330 approved SMG74.19.0
See details 11.10-1A202-F4.18.0Ph226.7.4.3.1 - Clarification, and correction to make old cell available in due time Details 232    Details 97-330 approved SMG74.19.0
See details 11.10-1A201-F4.18.0Ph2Introduction of section 34.2.9 „Multiple SMS mobile originated“ Details 221    Details 97-334 approved SMG74.19.0
See details 11.10-1A200-F4.18.0Ph2Section 26.11.5.1 - expected sequence shows late rather than early assignment Details 220    Details 97-332 approved SMG74.19.0
See details 11.10-1A199-F4.18.0Ph2Timing requirements in 20.10 and 20.15 Details 217    Details 97-334 approved SMG74.19.0
See details 11.10-1A198-F4.18.0Ph2Accidental possible expiry of T3240: especially in 26.6.8.4 and 26.6.4. Details 212    Details 97-331 approved SMG74.19.0
See details 11.10-1A197-F4.18.0Ph2Correction on tests with Modem Type V.21 Details 212    Details 97-334 approved SMG74.19.0
See details 11.10-1A196-F4.18.0Ph2Incorrect delays in 26.2.4 procedure 6 Details 212    Details 97-332 approved SMG74.19.0
See details 11.10-1A195-F4.18.0Ph2Progress indicator in 26.5.7.3 Details 212    Details 97-332 approved SMG74.19.0
See details 11.10-1A194-F4.18.0Ph2DISC/UA exchange in Test 26.7.4.3.3 Details 212    Details 97-330 approved SMG74.19.0
See details 11.10-1A193-F4.18.0Ph2Tolerances of timing advance Details 161    Details 97-331 approved SMG74.19.0
See details 11.10-1A191-D4.18.0Ph2MS residual output power between active bursts Details 159    Details 97-334 approved SMG74.19.0
See details 11.10-1A190-B4.18.0Ph2Coding of the bearer capability IE when Enhanced Full rate is supported Details 154    Details 97-328 approved SMG74.19.0
See details 11.10-1A189-B4.18.0Ph2Enhanced Full rate Signalling/ structured procedures/MS originated call/ late assignment Details 153    Details 97-328 approved SMG74.19.0
See details 11.10-1A188-B4.18.0Ph2Enhanced Full rate Signalling/ structured procedures/MS terminated call/ early assignment Details 152    Details 97-328 approved SMG74.19.0
See details 11.10-1A187-B4.18.0Ph2Enhanced Full rate Signalling/ emergency call Details 151    Details 97-328 approved SMG74.19.0