• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 5 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 32.2980020-F6.1.0Rel-6Correct datatype Service Change Cause and include of cause values from the failure handling procedure. Details S5-054997 agreedSA5#44 Details SP-050699 approvedSA#30S56.2.0CH-BC
See details 32.2980019-F6.1.0Rel-6Correct List of Downstream nodes at the SGSN for MBMS charging - Align with 23.246 (MBMS stage 2). Details S5-054996 agreedSA5#44 Details SP-050697 approvedSA#30S56.2.0MBMS-CH
See details 32.2980018-F6.1.0Rel-6Correct MMS CDR descriptions - Align with 22.140. Align ASN.1 definitions, include missing ASN.1 Details S5-054994 agreedSA5#44 Details SP-050699 approvedSA#30S56.2.0MMS6-CH
See details 32.2980017-F6.1.0Rel-6Add ASN.1 definition of Failure Handling parameters - Align with 32.251 Details S5-055011 agreedSA5#44 Details SP-050699 approvedSA#30S56.2.0CH-BC
See details 32.2980016-F6.1.0Rel-6Add missing FBC Parameter description - Align with 23.125 requirements Details S5-055008 agreedSA5#44 Details SP-050699 approvedSA#30S56.2.0CH-BC