• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 11 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 32.4050019-B7.1.0Rel-7Add HSDPA setup related measurements Details S5-061193 agreedSA5#49-Bis IRP Methodology Details SP-060550 approvedSA#33S57.2.0OAM7-PM
See details 32.4050018-B7.1.0Rel-7Add measurements about the HSDPA mobility management Details S5-061169 agreedSA5#49-Bis IRP Methodology Details SP-060550 approvedSA#33S57.2.0OAM7-PM
See details 32.4050017-B7.1.0Rel-7Add measurements related to channel switches for HSDPA Details S5-061167 agreedSA5#49-Bis IRP Methodology Details SP-060550 approvedSA#33S57.2.0OAM7-PM
See details 32.4050016-B7.1.0Rel-7Add measurements about call duration in utran cell for CS domain Details S5-061166 agreedSA5#49-Bis IRP Methodology Details SP-060550 approvedSA#33S57.2.0OAM7-PM
See details 32.4050015-C7.1.0Rel-7Constrain the applicability of performance measurements related to Iur interface Details S5-061163 agreedSA5#49-Bis IRP Methodology Details SP-060550 approvedSA#33S57.2.0OAM7-PM
See details 32.4050014-B7.1.0Rel-7Add measurements about the non-HS carrier power for TDD Details S5-061161 agreedSA5#49-Bis IRP Methodology Details SP-060550 approvedSA#33S57.2.0OAM7-PM
See details 32.4050013-B7.1.0Rel-7Add Uplink ISCP measurements in PM for TDD Details S5-060897 agreedSA5#49-Bis IRP Methodology Details SP-060550 approvedSA#33S57.2.0OAM7-PM
See details 32.4050012-B7.1.0Rel-7Add measurements about the non-HS carrier power - Align with RAN3's 25.433 Details S5-060710 agreedSA5#48 Details SP-060550 approvedSA#33S57.2.0OAM7-PM
See details 32.4050011-B7.1.0Rel-7Add measurements about RAB with different data rates of conversational service - Align with RAN2's 25.993 Details S5-060700 agreedSA5#48 Details SP-060550 approvedSA#33S57.2.0OAM7-PM
See details 32.40500101F7.1.0Rel-7Correction to TDD measurements for Received Total Wideband Power and Transmitted Carrier Power    Details SP-060663 approvedSA#33S57.2.0OAM7-PM
See details 32.40500091B7.1.0Rel-7Add RRC Connection Usage Measurements to fully gauge the usage of the UTRAN    Details SP-060663 approvedSA#33S57.2.0OAM7-PM