• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 5 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 25.22401192A5.3.0Rel-5Corrections to the Lpower control procedure Details R1-030301 agreedRAN1#31 Details RP-030133 approvedRAN#19R15.4.0LCRTDD-Phys
See details 25.22401172F5.3.0Rel-5Clarification of downlink closed loop power control procedures for 3.84 Mcps TDD Details R1-030296 agreedRAN1#31 Details RP-030141 approvedRAN#19R15.4.0TEI5
See details 25.22401152F5.3.0Rel-5Minimum timing requirement for CQI transmission on HS-SICH in UTRA TDD Details R1-030295 agreedRAN1#31 Details RP-030141 approvedRAN#19R15.4.0HSDPA-Phys
See details 25.22401141F5.3.0Rel-5Corrections to link adaptation procedure for UTRA TDD (3.84 Mcps Option) Details R1-030257 agreedRAN1#31 Details RP-030141 approvedRAN#19R15.4.0HSDPA-Phys
See details 25.22401091F5.3.0Rel-5Corrections to TPC Procedures During a DL Transmission Pause Details R1-030203 agreedRAN1#31 Details RP-030141 approvedRAN#19R15.4.0TEI5