• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 6 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 38.3060632-F15.14.0Rel-15Correction on fallback band combination for SUL Details R2-2108583 agreedRAN2#115-eHuawei, HiSilicon Details RP-212438 approvedRAN#93-eRAN215.15.0NR_newRAT-Core
See details 38.30606301B15.14.0Rel-15Support of newly introduced 100M bandwidth for band n40 Details R2-2109164 agreedRAN2#115-eHuawei, HiSilicon Details RP-212439 approvedRAN#93-eRAN215.15.0NR_newRAT-Core
See details 38.30606181F15.14.0Rel-15Definition of fallback per CC feature set Details R2-2109139 agreedRAN2#115-eEricsson, ZTE C... Details RP-212439 approvedRAN#93-eRAN215.15.0NR_newRAT-Core
See details 38.30606121F15.14.0Rel-15Correction to the description of additionalActiveTCI-StatePDCCH Details R2-2109048 agreedRAN2#115-eApple Inc Details RP-212438 approvedRAN#93-eRAN215.15.0NR_newRAT-Core
See details 38.30605613F15.14.0Rel-15Clarification on the simultaneousRxTxInterBandCA capability in NR-DC Details R2-2109166 agreedRAN2#115-eHuawei, HiSilic... Details RP-212439 approvedRAN#93-eRAN215.15.0NR_newRAT-Core
See details 38.30605174F15.14.0Rel-15CR on the Intra-band and Inter-band EN-DC Capabilities - R15 Details R2-2109063 agreedRAN2#115-eZTE Corporation... Details RP-212439 approvedRAN#93-eRAN215.15.0NR_newRAT-Core