• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 22 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 24.30140131F18.5.0Rel-18Correction to EMM cause description    Details CP-240300 approvedCT#103Ericsson, Qualc...18.6.05GS_Ph1-CT, SAES18
See details 24.30140121B18.5.0Rel-18Addition of Unavailability configuration IE in TAU accept Details C1-241749 agreedCT1#147Qualcomm Incorp... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30140113F18.5.0Rel-18Abnormal case for SDNAEPC related to DN-specific identity Details C1-241775 agreedCT1#147Nokia, Nokia Sh... Details CP-240218 approvedCT#103CT118.6.0TEI18_SDNAEPC
See details 24.30140092B18.5.0Rel-18Updates for TAU needed after unavailability period duration Details C1-241768 agreedCT1#147Huawei, HiSilic... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30140081F18.5.0Rel-18Moving the NAS timer handling from the general section to Extended DC section Details C1-241335 agreedCT1#147Huawei, HiSilic... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30140071F18.5.0Rel-18URSP provisioning in EPS and PDU session transferred from 5GS Details C1-241313 agreedCT1#147Ericsson Details CP-240108 approvedCT#103CT118.6.0eUEPO
See details 24.3014006-F18.5.0Rel-18Correction that the TAU request is from the UE Details C1-241065 agreedCT1#147Huawei, HiSilicon Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30140051F18.5.0Rel-18Corrections to the UE requested bearer resource modification procedure for URSP provisioning in EPS Details C1-241312 agreedCT1#147Intel Details CP-240108 approvedCT#103CT118.6.0eUEPO
See details 24.3014001-F18.5.0Rel-18Clariification that the NAS signalling connection is released only when start of UP is not provided Details C1-241036 agreedCT1#147Huawei, HiSilic... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30140001F18.5.0Rel-18URSP provisioning in EPS - additional PDN connections Details C1-241311 agreedCT1#147Ericsson Details CP-240108 approvedCT#103CT118.6.0eUEPO
See details 24.30139991F18.5.0Rel-18UE policy container with the length of two octets purpose Details C1-241309 agreedCT1#147Ericsson Details CP-240108 approvedCT#103CT118.6.0eUEPO
See details 24.30139981F18.5.0Rel-18Correction to the name of the IE and some editorial corrections Details C1-241332 agreedCT1#147Huawei, HiSilic... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30139971F18.5.0Rel-18Clarification that the MME adjusts different timers based on UP duration and start time. Details C1-241333 agreedCT1#147Huawei, HiSilicon Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.3013996-F18.5.0Rel-18Correction to determination of periodic timer, mobile reachable timer based on UP and start of UP Details C1-240987 agreedCT1#147Huawei, HiSilicon Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30139952B18.5.0Rel-18Addition of start of unavailability period to Unavailability configuration IE. Details C1-241830 agreedCT1#147Huawei, HiSilic... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.3013993-F18.5.0Rel-18Consideration of discontinuous coverage maximum time offset while leaving coverage Details C1-240928 agreedCT1#147Samsung Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30139911F18.5.0Rel-18Network behaviour upon N1 to S1 transition with only Emergency session active Details C1-241356 agreedCT1#147Apple Details CP-240121 approvedCT#103CT118.6.0SAES18
See details 24.30139901F18.5.0Rel-18Correction of the conditions for initiating a detach in EMM-REGISTERED.ATTEMPTING-TO-UPDATE and EMM-REGISTERED.UPDATE-NEEDED Details C1-241760 agreedCT1#147Apple Details CP-240125 approvedCT#103CT118.6.0TEI18
See details 24.30139861F18.5.0Rel-18Reset of UE implementation specific attempt counter for CustomLLFailureRetry Details C1-241355 agreedCT1#147Apple Details CP-240121 approvedCT#103CT118.6.0SAES18
See details 24.30139843C18.5.0Rel-18Handling of unavailability period in the attach procedure Details C1-241832 agreedCT1#147Qualcomm Incorp... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30139831F18.5.0Rel-18Correction to the term "Current TAI" Details C1-241354 agreedCT1#147Huawei, HiSilicon Details CP-240129 approvedCT#103CT118.6.0IoT_SAT_ARCH_EP...
See details 24.30139822F18.5.0Rel-18Addition of Unavailability information IE in TAU request Details C1-241748 agreedCT1#147Ericsson, Qualc... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2