• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 128 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
03.78A173-7.7.0R1998Corrections to Connect To Resource ProceduresN2-020556rejected-  
03.78A172-6.10.0R1997Corrections to Connect To Resource ProceduresN2-020555rejected-  
03.78A17117.7.0R1998Clarification in the case multiple RRBs are sent for a DPN2-020451agreedNP-020202approved7.8.0
03.78A171-7.7.0R1998Clarification in the case multiple RRBs are sent for a DPN2-020378revised-  
03.78A17026.10.0R1997Clarification in the case multiple RRBs are sent for a DPN2-020441agreedNP-020202approved6.11.0
03.78A17016.10.0R1997Clarification in the case multiple RRBs are sent for a DPN2-020431revised-  
03.78A170-6.10.0R1997Clarification in the case multiple RRBs are sent for a DPN2-020377revised-  
03.78A169-7.6.1R1998Guidance to the SCI operation if the subscriber or the VPLMN do not support AoC serviceN2-010800agreedNP-010581approved7.7.0
03.78A168-7.6.1R1998Correction to implementation of 03.78-A141r1N2-010797agreedNP-010581approved7.7.0
03.78A16716.9.1R1997Guidance to the SCI operation if the subscriber or the VPLMN do not support AoC serviceN2-010799agreedNP-010581approved6.10.0
03.78A166-6.9.1R1997Correction to implementation of 03.78-A141r1N2-010748agreedNP-010581approved6.10.0
03.78A165-7.6.1R1998Re-insertion of missing CLI box into CAMEL Release 1998N2-010726agreedNP-010580approved7.7.0
03.78A16217.5.0R1998Mapping of Call Forwarding parameters from CAP-Connect to ISUP-IAM and CAP-InitialDPN2-010380agreedNP-010309approved7.6.0
03.78A16116.8.0R1997Mapping of Call Forwarding parameters from CAP-Connect to ISUP-IAM and CAP-InitialDPN2-010379agreedNP-010309approved6.9.0
03.78A16057.4.0R1998Correction on CF notificationN2-000684agreedNP-000614approved7.5.0
03.78A15956.7.0R1997Correction on CF notificationN2-000683agreedNP-000614approved6.8.0
03.78A15827.3.0R1998Usage of Announcement Suppression IndicatorN2-000248agreedNP-000240approved7.4.0
03.78A15726.6.0R1997Usage of Announcement Suppression IndicatorN2-000247agreedNP-000240approved6.7.0
03.78A15627.3.0R1998gsmSSF DP handling in CFN2-000196agreedNP-000241approved7.4.0
03.78A15526.6.0R1997gsmSSF DP handling in CFN2-000195agreedNP-000241approved6.7.0
03.78A15417.2.0R1998Correction on gsmSSF SDL; return to idle after ACRN2A000230agreedNP-000033approved7.3.0
03.78A15316.5.0R1997Correction on gsmSSF SDL; return to idle after ACRN2A000229agreedNP-000033approved6.6.0
03.78A15217.2.0R1998Correction of CF notificationN2B000284agreedNP-000033approved7.3.0
03.78A15116.5.0R1997Correction of CF notificationN2B000283agreedNP-000033approved6.6.0
03.78A145-7.1.0R1998Alignment of CAMEL2 FCI & Handling of CIRN2-99C99agreedNP-99298approved7.2.0
03.78A144-7.1.0R1998Corrections of process gsmSSF SDLN2-99C61agreedNP-99298approved7.2.0
03.78A143-7.1.0R1998Value of Call Active parameter in Aoperation - clarifications in the SDLN2-99D15agreedNP-99298approved7.2.0
03.78A142-7.1.0R1998Clarification on handling of Call Reference Number and GMSC addressN2-99986agreedNP-99298approved7.2.0
03.78A14116.4.0R1997Corrections of process gsmSSF SDLN2-99C59agreedNP-99298approved6.5.0
03.78A13816.4.0R1997Value of Call Active parameter in Aoperation - clarifications in the SDLN2-99C55agreedNP-99298approved6.5.0
03.78A13717.1.0R1998GMSC CAMEL Phases in PRNN2-99D11agreedNP-99298approved7.2.0
03.78A13616.4.0R1997GMSC CAMEL Phases in PRNN2-99C53agreedNP-99298approved6.5.0
03.78A135-7.1.0R1998Removal of TDP-Criteria from RCHN2-99B26agreedNP-99298approved7.2.0
03.78A134-6.4.0R1997Removal of TDP-Criteria from RCHN2-99B25agreedNP-99298approved6.5.0
03.78A13317.1.0R1998Call Reference NumberN2-99C47agreedNP-99298approved7.2.0
03.78A13216.4.0R1997Call Reference NumberN2-99C45agreedNP-99298approved6.5.0
03.78A13026.4.0R1997Alignment of CAMEL2 FCI & Handling of CIRN2-99C85agreedNP-99298approved6.5.0
03.78A12716.4.0R1997Clarification on handling of Call Reference Number and GMSC addressN2-99925agreedNP-99298approved6.5.0
03.78A12527.0.0R1998Notification of call forwarding to the gsmSCFN2-99638 P-99-551approved7.1.0
03.78A124-7.0.0R1998Correction of gsmSDL; return to idle after ACRN2-99630 P-99-551approved7.1.0
03.78A12337.0.0R1998MSC address in Initial DPN2-99646 P-99-551approved7.1.0
03.78A122-7.0.0R1998Introduction of MSISDN Parameters in Process UnstructuredN2-99576 P-99-551approved7.1.0
03.78A121-7.0.0R1998Refining trigger criteria at DP2, due to the introduction of North American Equal AccessN2-99458 P-99-551approved7.1.0
03.78A12017.0.0R1998Clarification on the scope of CAMEL Capability Handling parameterN2-99338 P-99-551approved7.1.0
03.78A119-7.0.0R1998Reporting of O/T_Abandon DP when caller clears during O/T_Busy, O/T_No_Answer or Route_Select_Failure EDP-R.N2-99310 P-99-551approved7.1.0
03.78A118-7.0.0R1998Renaming of Call Active VariableN2-99255 P-99-551approved7.1.0
03.78A117-7.0.0R1998Correction of CAMEL Phase interworking with Call ForwardingN2-99223 P-99-551approved7.1.0
03.78A11627.0.0R1998Various correctionsN2-99343 P-99-551approved7.1.0
03.78A11517.0.0R1998Correction of USSD Information flowsN2-99238 P-99-551approved7.1.0
03.78A114-7.0.0R1998Inclusion of Activity Test IF between gsmSCF & gsmSRF and gsmSCF and assistSSF3C99-480 P-99-551approved7.1.0
03.78A11327.0.0R1998Handling of AC/Ain DP Busy, DP No Answer and DP Route SelectN2-99244 P-99-551approved7.1.0
03.78A11217.0.0R1998Dialled Number String FormatN2-99225 P-99-551approved7.1.0
03.78A111-7.0.0R1998Inclusion of Alerting Pattern in Provide Roaming Number (PRN) Information Flow..3C99-275 P-99-551approved7.1.0
03.78A11017.0.0R1998Inclusion of Subscriber Activity Information FlowN2-99217 P-99-551approved7.1.0
03.78A10927.1.0R1998Inclusion of the SS Invocation Notification ProcedureN2-99937agreedNP-99298approved7.2.0
03.78A10826.4.0R1997Inclusion of the SS Invocation Notification ProcedureN2-99939agreedNP-99298approved6.5.0
03.78A107-5.7.0R1996Health warning on MSC address in Initial DPNP-99244 P-99-453approved5.8.0
03.78A10626.3.0R1997Notification of call forwarding to the gsmSCFN2-99638 P-99-454approved6.4.0
03.78A105-6.3.0R1997Correction of gsmSDL; return to idle after ACRN2-99630 P-99-454approved6.4.0
03.78A10436.3.0R1997MSC address in Initial DPN2-99646 P-99-454approved6.4.0
03.78A103-6.3.0R1997Introduction of MSISDN Parameters in Process UnstructuredN2-99576 P-99-454approved6.4.0
03.78A102-6.3.0R1997Refining trigger criteria at DP2, due to the introduction of North American Equal AccessN2-99458 P-99-454approved6.4.0
03.78A10016.3.0R1997Clarification on the scope of CAMEL Capability Handling parameterN2-99338 P-99-454approved6.4.0
03.78A099-6.3.0R1997Reporting of O/T_Abandon DP when caller clears during O/T_Busy, O/T_No_Answer or Route_Select_Failure EDP-R.N2-99310 P-99-454approved6.4.0
03.78A093-6.3.0R1997Renaming of Call Active VariableN2-99255 P-99-454approved6.4.0
03.78A092-6.3.0R1997Correction of CAMEL Phase interworking with Call ForwardingN2-99223 P-99-454approved6.4.0
03.78A08526.3.0R1997Various correctionsN2-99343 P-99-454approved6.4.0
03.78A08416.3.0R1997Correction of USSD Information flowsN2-99238 P-99-454approved6.4.0
03.78A083-6.3.0R1997Inclusion of Activity Test IF between gsmSCF & gsmSRF and gsmSCF and assistSSF3C99-480 P-99-454approved6.4.0
03.78A07626.3.0R1997Handling of AC/Ain DP Busy, DP No Answer and DP Route SelectN2-99244 P-99-454approved6.4.0
03.78A07516.3.0R1997Dialled Number String FormatN2-99225 P-99-454approved6.4.0
03.78A074-6.3.0R1997Inclusion of Alerting Pattern in Provide Roaming Number (PRN) Information Flow..3C99-275 P-99-454approved6.4.0
03.78A072- R1998Introduction of WI CLI Enhancement3P99-049 P-99-196approved7.0.0
03.78A07016.3.0R1997Inclusion of Subscriber Activity Information FlowN2-99217 P-99-454approved6.4.0
03.78A069-6.2.0R1997Interactions of CAMEL with call forwarding & call barring3P99-023 P-99-192approved6.3.0
03.78A06716.2.0R1997CAMEL 2 clarifications to charging issues3P99-023 P-99-192approved6.3.0
03.78A06316.2.0R1997Addition of North American Carrier related Information to CAMEL Phase 2- P-99-245approved6.3.0
03.78A06136.2.0R1997Timer TNRy3P99-023 P-99-192approved6.3.0
03.78A06016.2.0R1997Insertion of the handling of the call duration and of E parameters at the reception of answer in case of temporary connection3P99-023 P-99-192approved6.3.0
03.78A059-6.2.0R1997Removal of ‘Send Calculation To SCP Indication’3P99-023 P-99-192approved6.3.0
03.78A058-6.2.0R1997Clarifying description of Implicit Disarming rules3P99-023 P-99-192approved6.3.0
03.78A057-6.2.0R1997Criteria for inhibiting triggering3P99-023 P-99-192approved6.3.0
03.78A056-6.2.0R1997Use of Facility message to transport the E parameters3P99-023 P-99-192approved6.3.0
03.78A055-6.2.0R1997P&C (Prompt & Collect) correction3P99-023 P-99-192approved6.3.0
03.78A052-6.2.0R1997USSD3P99-023 P-99-192approved6.3.0
03.78A05026.2.0R1997Corrections on CAMEL phase 2 stage 23P99-023 P-99-192approved6.3.0
03.78A049-6.2.0R1997Correction of the 03.78 SDLs for Reconnect in case for MTC3P99-023 P-99-192approved6.3.0
03.78A04826.2.0R1997Clarification of handling of call forwarding3P99-023 P-99-192approved6.3.0
03.78A04715.6.0R1996Clarification of handling of call forwarding3P99-023 P-99-192approved5.7.0
03.78A046-6.2.0R1997Correction of 03.78 SDLs3P99-023 P-99-192approved6.3.0
03.78A043-6.1.1R1997GSM Forwarding Pending Indication in IDP Operation98p191 98-0724approved6.2.0
03.78A042-6.2.0R1997Tariff Switch Handling Correction3P99-023 P-99-192approved6.3.0
03.78A04136.2.0R1997Implicit Disarming of Detection Points3P99-023 P-99-192approved6.3.0
03.78A04016.2.0R1997SCI handling in 03.783P99-023 P-99-192approved6.3.0
03.78A03916.2.0R1997Progress Indicator3P99-023 P-99-192approved6.3.0
03.78A03716.1.1R1997Removal of O_Not_Reachable and T_Not_Reachable detection points98p186 98-0724postponed 
03.78A03426.1.1R1997Interworking CAMEL with general Bearer Service98p206 98-0724approved6.2.0
03.78A033-5.5.0R1996Corrections to any Time Interrogation98p206 98-0723approved5.6.0
03.78A03266.2.0R1997Correction to handling of Call Information Report3P99-023 P-99-192approved6.3.0
03.78A02916.1.1R1997Corrections98p206 98-0724approved6.2.0
03.78A028-6.0.0R1997GSM Forwarding Pending Indication in IDP Operation98P126agreed98-0411approved6.1.0
03.78A027-6.0.0R1997Release by A party for forwarded calls and CAMEL98P125agreed98-0404approved6.1.0
03.78A02616.0.0R1997Supported CAMEL Phase indication98P127agreed98-0411approved6.1.0
03.78A02526.1.1R1997CAMEL Phase 2 stage 298p186 98-0724approved6.2.0
03.78A02416.0.0R1997Progress is to be sent on CONNECT reception98P125agreed98-0404approved6.1.0
03.78A02315.4.0R1996Progress is to be sent on CONNECT reception98P125agreed98-0404approved5.5.0
03.78A022-5.4.0R1996Release by A party for forwarded calls and CAMEL98P125agreed98-0404approved5.5.0
03.78A02116.0.0R1997Error handling in GSM 03.78 paragraph 8.698P125agreed98-0404approved6.1.0
03.78A02015.4.0R1996Error handling in GSM 03.78 paragraph 8.698P115agreed98-0404approved5.5.0
03.78A01926.0.0R1997Combination clean up on CAMEL Phase 298P126agreed98-0410approved6.1.0
03.78A017-5.3.1R1996Correction to CAMEL phase 1 for forwarded calls98c005agreed98-0086approved5.4.0
03.78A016-5.3.1R1996Corrections to CAMEL relationship description98c165agreed98-0086approved5.4.0
03.78A015-5.3.1R1996Redundant definition of Location Information elements98c090agreed98-0086approved5.4.0
03.78A01415.2.0R1996Use of the CallReference Number & GMSC address in SRI97C735agreed97-915approved5.3.0
03.78A013-5.2.0R1996Removal of the CalledPartyNumber for MO calls from IDP97C652agreed97-915approved5.3.0
03.78A011-5.2.0R1996Removal of CallingPartyNumber from Connect97C637agreed97-915approved5.3.0
03.78A010-5.1.0R1996Alignment subscriber status in CAMEL with MAP97C514agreed97-688approved5.2.0
03.78A00945.2.0R1996Concentration of description of core call handling functions in 03.18, Changes to ease the documentation of new services97C734agreed97-913approved5.3.0
03.78A0088 R1997Support of CAMEL phase 2 (stage2)97C711 97-909noted 
03.78A008- R1997CAMEL phase 298c174agreed98-0084approved6.0.0
03.78A007-5.0.0R1996Change to CAMEL phase 1 regarding * and # in Called Party Number97C271agreed303/97approved5.1.0
03.78A00615.0.0R1996Clarification on handling of Connect and Continue operations97C238agreed377/97approved5.1.0
03.78A00515.0.0R1996Setting of Location Number97C274agreed377/97approved5.1.0
03.78A00415.0.0R1996Introduction of value 'not Provided from VLR in subscriber state97C237agreed377/97approved5.1.0
03.78A00335.1.0R1996Alignment with stage 3 specifications (09.78 and 09.02) and clarifications97C397agreed97-688approved5.2.0
03.78A00215.0.0R1996MSC Id for Call Reference Number97C219agreed377/97approved5.1.0
03.78A00115.0.0R1996CallingPartyNumber in Connect97C160agreed377/97approved5.1.0
03.780000- R1996CAMEL phase 1 (stage 2)97P120agreed048/97approved5.0.0