| 04.06 | A016 | 1 | F | 8.3.0 | R1999 | L2 Fill Bits randomisation for Fill frames |
GP-081546
| agreed | GERAN#40 | 2008-10-02 09:14:21 |
GP-081546
| approved | GERAN#40 | G2 | 8.4.0 | TEI |
|
|
| 04.06 | A016 | - | F | 8.3.0 | R1999 | L2 Fill Bits randomisation for Fill frames |
G2-080569
| revised | GERAN2#39-bis | 2008-09-30 09:28:55 |
| | | | | TEI |
|
|
| 04.06 | A015 | 4 | F | 8.2.1 | R1999 | Randomising fill bits in L2 message |
GP-081281
| agreed | GERAN#39 | Vodafone Group Plc |
GP-081281
| approved | GERAN#39 | G2 | 8.3.0 | TEI |
|
|
| 04.06 | A015 | 3 | F | 8.2.1 | R1999 | Randomising fill bits in L2 message |
GP-081060
| revised | GERAN#39 | Vodafone Group Plc |
| | | | | TEI |
|
|
| 04.06 | A015 | 3 | F | 8.2.1 | R1999 | Randomising fill bits in L2 message |
G2-080464
| withdrawn | | Vodafone Group Plc |
| | | | | TEI |
|
|
| 04.06 | A015 | 2 | F | 8.2.1 | R1999 | Randomising fill bits in L2 message |
GP-080810
| postponed | GERAN#38 | 2008-05-13 10:03:19 |
| | | | | TEI |
|
|
| 04.06 | A015 | 2 | F | 8.2.1 | R1999 | Randomising fill bits in L2 message |
G2-080425
| postponed | GERAN2#38-bis | Vodafone Group Plc |
| | | | | TEI |
|
|
| 04.06 | A015 | 1 | F | 8.2.1 | R1999 | Randomising fill bits in L2 message |
GP-080761
| revised | GERAN#38 | 2008-05-13 09:46:47 |
| | | | | TEI |
|
|
| 04.06 | A015 | 1 | F | 8.2.1 | R1999 | Randomising fill bits in L2 message |
G2-080346
| revised | GERAN2#38-bis | Vodafone Group Plc |
| | | | | TEI |
|
|
| 04.06 | A015 | - | F | 8.2.1 | R1999 | Randomising fill bits in L2 message |
GP-080544
| revised | GERAN#38 | 2008-05-05 11:04:27 |
| | | | | TEI |
|
|
| 04.06 | A014 | 1 | F | 8.1.1 | R1999 | Correction of LAPDm performance parameters for E-FACCH/F |
GP-020413
| agreed | GERAN-#8 | |
GP-020413
| approved | GERAN-#8 | G2 | 8.2.0 | EDGE |
|
|
| 04.06 | A014 | - | F | 8.1.1 | R1999 | Correction of LAPDm performance parameters for E-FACCH/F |
GP-020224
| revised | GERAN-#8 | |
| | | Ericsson | | EDGE |
|
|
| 04.06 | A013 | - | A | 8.1.1 | R1999 | Remove preemption |
| | | |
GP-011129
| withdrawn | GERAN-#5 | WG2 | | LCS |
|
|
| 04.06 | A012 | - | F | 7.2.1 | R1998 | Remove preemption |
| | | |
GP-011128
| withdrawn | GERAN-#5 | WG2 | | LCS |
|
|
| 04.06 | A011 | 3 | A | 8.0.0 | R1999 | Segmentation/Preemption |
GP-010399
| agreed | GERAN-#3 | Ericsson |
GP-010399
| approved | GERAN-#3 | G2 | 8.1.0 | LCS |
|
|
| 04.06 | A011 | 2 | A | 8.0.0 | R1999 | Segmentation/Preemption |
GP-010373
| revised | GERAN-#3 | Ericsson |
| | | G2 | | LCS |
|
|
| 04.06 | A011 | 1 | A | 8.0.0 | R1999 | Segmentation/Preemption |
GP-010328
| revised | GERAN-#3 | Ericsson |
| | | G2 | | LCS |
|
|
| 04.06 | A011 | - | A | 8.0.0 | R1999 | Segmentation/Preemption |
GP-010151
| revised | GERAN-#3 | Ericsson |
| | | G2 | | LCS |
|
|
| 04.06 | A010 | 3 | F | 7.1.1 | R1998 | Segmentation/Preemption for LCS |
GP-010397
| agreed | GERAN-#3 | Ericsson |
GP-010397
| approved | GERAN-#3 | G2 | 7.2.0 | LCS |
|
|
| 04.06 | A010 | 2 | F | 7.1.1 | R1998 | Segmentation/Preemption for LCS |
GP-010371
| revised | GERAN-#3 | Ericsson |
| | | G2 | | LCS |
|
|
| 04.06 | A010 | 1 | F | 7.1.1 | R1998 | Segmentation/Preemption |
GP-010325
| revised | GERAN-#3 | Ericsson |
| | | G2 | | LCS |
|
|
| 04.06 | A010 | - | F | 7.1.1 | R1998 | Segmentation/Preemption |
GP-010148
| revised | GERAN-#3 | Ericsson |
| | | G2 | | LCS |
|
|
| 04.06 | A009 | 1 | C | 7.0.1 | R1998 | Addition of Preemption capability for SAPI 0 in LAPDm |
399/00
| | | |
P-00-107
| approved | | SMG2 | 7.1.0 | LCS |
|
|
| 04.06 | A008 | 1 | A | 6.1.1 | R1997 | New frame format for UI frames on SACCH |
| | | |
P-00-112
| approved | | SMG2 | 6.2.0 | TEI |
|
|
| 04.06 | A008 | - | A | 6.0.0 | R1997 | New frame format for UI frames on SACCH |
750/99
| agreed | | |
P-99-394
| approved | | SMG2 | 6.1.0 | TEI |
|
|
| 04.06 | A008 | - | A | 6.0.0 | R1997 | New frame format for UI frames on SACCH |
750/99
| agreed | | |
P-99-394
| withdrawn | | SMG2 | | TEI |
|
|
| 04.06 | A007 | 1 | F | 5.3.1 | R1996 | New frame format for UI frames on SACCH |
| | | |
P-00-112
| approved | | SMG2 | 5.4.0 | TEI |
|
|
| 04.06 | A007 | - | F | 5.2.1 | R1996 | New frame format for UI frames on SACCH |
749/99
| agreed | | |
P-99-394
| approved | | SMG2 | 5.3.0 | TEI |
|
|
| 04.06 | A007 | - | F | 5.2.1 | R1996 | New frame format for UI frames on SACCH |
749/99
| agreed | | |
P-99-394
| withdrawn | | SMG2 | | TEI |
|
|
| 04.06 | A006 | 3 | A | 7.0.1 | R1998 | New frame format for UI frames on SACCH |
| | | |
P-00-112
| approved | | SMG2 | 7.1.0 | TEI |
|
|
| 04.06 | A006 | 2 | F | | R1998 | New frame format for UI frames on SACCH |
822/99
| agreed | | |
P-99-394
| approved | | SMG2 | 7.0.0 | TEI |
|
|
| 04.06 | A006 | 2 | F | | R1998 | New frame format for UI frames on SACCH |
822/99
| agreed | | |
P-99-394
| withdrawn | | SMG2 | | TEI |
|
|
| 04.06 | A005 | - | B | 5.1.0 | R1996 | Introduction of NCH |
22/98
| agreed | | |
98-0107
| approved | | SMG2 WPA | 5.2.0 | |
|
|
| 04.06 | A004 | 1 | B | | R1996 | for 04.06 on short L2 header |
97P066
| agreed | | |
136/97
| approved | | SMG3 WPA | 5.1.0 | ASCI, HSCSD |
|
|
| 04.06 | 0081 | 1 | F | | Ph2 | Value of N200 for FACCH/H |
423/94
| agreed | | |
402/94
| approved | | Ericsson | 4.4.0 | |
|
|
| 04.06 | 0081 | - | F | | Ph2 | Value of N200 for FACCH/H |
368/94
| revised | | |
| | | Ericsson | | |
|
|
| 04.06 | 0080 | - | D | | Ph2 | Correction of retransmission EPOCH rules |
547/93
| agreed | | |
610/93
| approved | | Matra | | |
|
|
| 04.06 | 0079 | - | C | | Ph2 | Response and Repetion requirements for FACCH on TCH/H |
409/93
| agreed | | |
434/93
| approved | | PT12 | | |
|
|
| 04.06 | 0078 | - | B | | Ph2 | Use of the SACCH |
316/93
| agreed | | |
434/93
| approved | | Matra | | |
|
|
| 04.06 | 0077 | - | C | | Ph2 | Weaker Requirements on response Delay |
301/93
| rejected | | |
| | | PKI | | |
|
|
| 04.06 | 0076 | 2 | C | | Ph2 | Cross phase Compatibility Problems Regarding Performance |
456/93
| agreed | | |
434/93
| approved | | PKI | | |
|
|
| 04.06 | 0076 | 1 | C | | Ph2 | Cross phase Compatibility Problems Regarding Performance |
266/93
| revised | | |
| | | PKI | | |
|
|
| 04.06 | 0076 | - | C | | Ph2 | Cross phase Compatibility Problems Regarding Performance |
93A053
| revised | | |
| | | PKI | | |
|
|
| 04.06 | 0075 | - | B | | Ph2 | Maximum Layer 3 Length |
101/93
| postponed | | |
| | | Vodafone | | |
|
|
| 04.06 | 0074 | - | F | | Ph2 | Termination of Retransmission |
833/92
| withdrawn | | |
| | | PKI | | |
|
|
| 04.06 | 0073 | - | A | 3.9.0 | Ph1 | Section 5.5.7 Waiting Acknowledgement |
801/92
| rejected | | |
| | | Motorola DK | | |
|
|
| 04.06 | 0072 | 1 | A | | Ph1 | Unclear conformance requirements |
902/92
| rejected | | |
| | | Telecom Denmark | | |
|
|
| 04.06 | 0072 | - | A | | Ph1 | Unclear conformance requirements |
| rejected | | |
| | | Telecom Denmark | | |
|
|
| 04.06 | 0071 | - | A | | Ph1 | - |
| withdrawn | | |
| | | Telecom Denmark | | |
|
|
| 04.06 | 0070 | 2 | B | | Ph2 | BCCH/CCCH data transfer in L2 |
| agreed | | |
50/93
| approved | | SMG3-WPA | | |
|
|
| 04.06 | 0070 | 1 | B | | Ph2 | BCCH/CCCH data transfer in L2 |
845/92
| revised | | |
| | | Detecon | | |
|
|
| 04.06 | 0070 | - | B | | Ph2 | BCCH/CCCH data transfer in L2 |
| revised | | |
| | | Detecon | | |
|
|
| 04.06 | 0069 | 1 | B | | Ph2 | Error handling w.r.t. SABM |
| agreed | | |
59/93
| approved | | SMG3-WPA | | |
|
|
| 04.06 | 0069 | - | B | | Ph2 | Error handling w.r.t. SABM |
832/92
| revised | | |
| | | PKI | | |
|
|
| 04.06 | 0068 | - | F | | Ph2 | Deletion of some eror causes in para 9.3.22.... |
332/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0067 | - | F | | Ph2 | Deletion of the last item of the list of abnormal case of the message ERROR INDICATION.... |
333/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0066 | - | D | | Ph2 | Deletion of the message unit for the DL_ESTABLISHMENT_CONFIRM primitive in table 5 |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0066 | - | F | | Ph2 | Deletion of the message unit for the DL-ESTABLISH-CONFIRM... |
331/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0065 | - | B | | Ph2 | Error in Note 1 of section 5.5.3.1 |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0065 | - | F | | Ph2 | Error in note 1 in 5.5.3.1 |
330/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0064 | - | D | | Ph2 | In section 5.4.2.3 notes are wrong |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0064 | - | F | | Ph2 | In the para 5.4.2.3. notes are wrong |
329/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0063 | - | D | | Ph2 | Changes of a reference in section 5.5.2.2 |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0063 | - | F | | Ph2 | Change of reference in 5.5.2.2 |
328/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0062 | - | D | | Ph2 | Substitution of the word indication primitive with the word confirm primitive |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0062 | - | F | | Ph2 | Substitution of the word indication primitive..... |
327/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0061 | - | B | | Ph2 | Insertion of the MDL_ERROR_INDICATION in case of failure in the release procedure of the link |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0061 | - | F | | Ph2 | Insertion of the primitive MDL-ERROR-INDICATION in case of failure in the release procedure.... |
325/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0060 | - | D | | Ph2 | Improvement of the description of the Contention resolution establishment procedure |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0060 | - | F | | Ph2 | Improvement of the description of the Contention resolution.... |
324/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0059 | - | B | | Ph2 | Deletion of the last error cause in section 4.1.3.5 |
575/92
| rejected | | |
| | | | | |
|
|
| 04.06 | 0059 | - | F | | Ph2 | Deletion of the last error cause in 4.1.3.5 |
323/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0058 | - | B | | Ph2 | Deletion of the second and the second last error cause in section 4.1.3.5 |
575/92
| rejected | | |
| | | | | |
|
|
| 04.06 | 0058 | - | F | | Ph2 | Deletion of the second and the second last error cause... |
316/92
| postponed | | |
| | | ITALTEL | | |
|
|
| 04.06 | 0057 | - | F | | Ph2 | Crossing of DISC and SABM |
89/92
| postponed | | |
| | | ALCATEL | | |
|
|
| 04.06 | 0057 | - | B | | Ph2 | Crossing of DISC and SABM |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0057 | - | C | | Ph2 | Crossing DISC and SABM |
350/92
| agreed | | |
| | | ALCATEL | | |
|
|
| 04.06 | 0056 | 2 | C | | Ph2 | T200 related performance problems |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0056 | 1 | F | | Ph2 | T200 related performance problems |
41/92
| agreed | | |
| | | Rapporteur | | |
|
|
| 04.06 | 0055 | 1 | F | | Ph2 | Reaction on N(S) sequence errors |
40/92
| rejected | | |
| | | Rapporteur | | |
|
|
| 04.06 | 0054 | 2 | D | | Ph2 | Update of Service primitive tables |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0054 | 1 | F | | Ph2 | Update of service primitive tables |
39/92
| agreed | | |
| | | Ad hoc group | | |
|
|
| 04.06 | 0053 | 2 | D | | Ph2 | Alignment of service primitives with TS GSM 04.05 |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0053 | 1 | F | | Ph2 | Alignment of service primitive with TS GSM 04.05 |
38/92
| revised | | |
| | | Ad hoc group | | |
|
|
| 04.06 | 0052 | 3 | B | | Ph2 | Redrafting of description of simplified protocol |
941/92
| agreed | | |
59/93
| approved | | Rapporteur | | |
|
|
| 04.06 | 0052 | 2 | B | | Ph2 | Redrafting of description of simplified protocol |
800/92
| revised | | |
| | | Rapporteur | | |
|
|
| 04.06 | 0052 | 1 | F | | Ph2 | Redrafting of description of simplified protocol |
37/92
| rejected | | |
| | | Rapporteur | | |
|
|
| 04.06 | 0051 | 2 | D | | Ph2 | Clarification of protocol operation on SAPI=0/3 |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0051 | 1 | F | | Ph2 | Clarification of protocol operation on SAPI=0/3 |
36/92
| revised | | |
| | | Ad hoc group | | |
|
|
| 04.06 | 0050 | 2 | C | | Ph2 | Reserved values & spare bits for LPD |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0050 | 1 | F | | Ph2 | Reserved Values & spare bits for LPD |
35/92
| revised | | |
| | | Ad hoc group | | |
|
|
| 04.06 | 0049 | 2 | D | | Ph2 | Use of segmentation and piggy backing |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0049 | 1 | D | | Ph2 | Use of segmentation and piggy backing |
34/92
| revised | | |
| | | Ad hoc group | | |
|
|
| 04.06 | 0048 | 2 | D | | Ph2 | Arithmetics on sequence numbers |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0048 | 2 | C | | Ph2 | Arithmetics on sequence numbers |
199/92
| agreed | | |
| | | SMG3 | | |
|
|
| 04.06 | 0048 | 1 | D | | Ph2 | Arithmethics on sequence numbers |
33/92
| revised | | |
| | | Ad hoc group | | |
|
|
| 04.06 | 0047 | 2 | D | | Ph2 | Basic editorial text changes for phase 2 |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0047 | 1 | F | | Ph2 | Basic editorial text changes for phase 2 version |
32/92
| agreed | | |
| | | Ad hoc group | | |
|
|
| 04.06 | 0046 | - | F | | Ph2 | Logical reordering of text |
571/91
| postponed | | |
| | | DETECON | | |
|
|
| 04.06 | 0046 | - | D | | Ph2 | Logical reordering of text |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0045 | - | F | | Ph2 | Radio allocation for SMS-PP |
566/91
| postponed | | |
| | | Matra Communication | | |
|
|
| 04.06 | 0043 | - | A | | Ph1 | Handling of Layer 3 messages.... |
263/91
| agreed | | |
239/91
| approved | | | | |
|
|
| 04.06 | 0042 | 1 | A | | Ph1 | Inconsistencies between section 5.5.3.1 and 5.5.7 |
271/91
| agreed | | |
238/91
| approved | | | | |
|
|
| 04.06 | 0042 | - | F | | Ph1 | Inconsistencies between sections 5.5.3.1 and 5.5.7 |
139/91
| revised | | |
| | | | | |
|
|
| 04.06 | 0041 | - | F | | Ph2 | Message Unit with DL resume request |
231/91
| revised | | |
| | | NEC UK | | |
|
|
| 04.06 | 0040 | - | F | | Ph1 | Layer 2 suspend/resume |
230/91
| rejected | | |
| | | NEC UK | | |
|
|
| 04.06 | 0039 | - | E | | Ph1 | Clarification of Polling Procedure |
218/91
| agreed | | |
238/91
| approved | | PKI | | |
|
|
| 04.06 | 0038 | - | D | | Ph2 | Suspension |
162/91
| rejected | | |
| | | DC-Development | | |
|
|
| 04.06 | 0037 | - | D | | Ph2 | Address field variables |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0037 | - | D | | Ph2 | Address field variables |
161/91
| | | |
| | | DC-Development | | |
|
|
| 04.06 | 0036 | - | D | | Ph2 | References to non existent annexes |
519/92
| agreed | | |
436/92
| approved | | | | |
|
|
| 04.06 | 0036 | - | D | | Ph2 | Reference to non existing annexes |
160/91
| | | |
| | | DC-Development | | |
|
|
| 04.06 | 0035 | 1 | A | | Ph1 | Abis fill frames |
| agreed | | |
131/91
| approved | | GSM3 | | |
|
|
| 04.06 | 0035 | - | A | | Ph1 | Abis fill frames |
69/91
| | | |
| | | ERICSSON | | |
|
|
| 04.06 | 0034 | - | E | | Ph1 | Clarification of the terms further study (result of Public Enquiry) |
| | | |
32/91
| approved | | PT12 | | |
|
|
| 04.06 | 0033 | - | D | | Ph2 | Error in reference figure of Address field format |
505/90
| agreed | | |
| | | GSM3 | | |
|
|
| 04.06 | 0032 | 1 | A | | Ph1 | Misleading sentence in paragraph 6 |
491/90
| agreed | | |
31/91
| approved | | GSM3 | | |
|
|
| 04.06 | 0031 | 3 | A | | Ph1 | L2/3 fill frames |
530/90
| agreed | | |
32/91
| approved | | GSM3 | | |
|
|
| 04.06 | 0030 | 1 | A | | Ph1 | Specification of SAPI 3 |
| | | |
| approved | | GSM3 | | |
|
|
| 04.06 | 0029 | - | D | | Ph2 | Clarification of text |
84/90
| agreed | | |
| approved | | GSM3 | | |
|
|
| 04.06 | 0028 | 1 | A | | Ph1 | Link establishment procedure for SAPI 0 |
86/90
| agreed | | |
| approved | | GSM3 | | |
|
|
| 04.06 | 0027 | - | D | | Ph2 | Removal of error cause from list |
66/90
| agreed | | |
| approved | | Motorola | | |
|
|
| 04.06 | 0026 | 1 | A | | Ph1 | Correction of mistakes |
68/90
| agreed | | |
| approved | | GSM3 | | |
|
|
| 04.06 | 0025 | 1 | A | | Ph1 | Simplified protocol |
26/90
| agreed | | |
| approved | | GSM3 | | |
|
|
| 04.06 | 0024 | 1 | A | | Ph1 | Order of bit transmission |
79/90
| agreed | | |
| approved | | GSM3 | | |
|
|
| 04.06 | 0023 | - | D | | Ph1 | Layer 2 procedure in the case of assignment failure |
| agreed | | |
47/90
| approved | | GSM3 | | |
|
|
| 04.06 | 0022 | 2 | A | | Ph1 | Cell broadcast |
| agreed | | |
33/90
| approved | | GSM3 | | |
|
|
| 04.06 | 0021 | 1 | A | | Ph1 | Timer recovery problem |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0020 | 1 | A | | Ph1 | Maximum message length |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0019 | 1 | A | | Ph1 | maximum message length |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0018 | 2 | A | | Ph1 | Contention resolution procedure |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0015 | - | D | | Ph1 | SABM without layer 3 message-unit |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0014 | 1 | D | | Ph1 | MS returns to old channels |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0013 | - | D | | Ph1 | missing input in the state AWAITING-NORMAL-RELEASE |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0012 | - | D | | Ph1 | DISCARD-I-QUEUE |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0011 | - | D | | Ph1 | DL-SUSPEND-REQUEST in BS |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0010 | 1 | D | | Ph1 | simplified protocol |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0009 | - | D | | Ph1 | Fill Frames |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0008 | 1 | D | | Ph1 | Relational operateur |
| agreed | | |
344/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0006 | 1 | D | | Ph1 | Setting of timer T200 |
| agreed | | |
340/89
| approved | | GSM3 | | |
|
|
| 04.06 | 0005 | - | D | | Ph1 | Priority indicator |
207/89
| agreed | | |
| approved | | WP3 | | |
|
|
| 04.06 | 0004 | - | | | Ph1 | Fill frames |
125/89
| agreed | | |
| approved | | France | | |
|
|
| 04.06 | 0003 | - | | | Ph1 | Compatibility with Rec. GSM 04.08 |
17/89
| agreed | | |
| approved | | UK | | |
|
|
| 04.06 | 0002 | - | | | Ph1 | Maximum number of octets in information fields |
97/89
| agreed | | |
| approved | | France | | |
|
|
| 04.06 | 0001 | - | | | Ph1 | alignment of SDL with the main body of the rec. and cleaning up. |
99/89
| agreed | | |
| approved | | FRG | | |
|