• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 109 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 05.10A084-F R1999MS reaction time upon reception of assignment message on CCCH Details GP-032044 rejectedGERAN#16Nortel Networks...   MELCO, Nortel 
See details 05.10A083-F R1998MS reaction time upon reception of assignment message on CCCH Details GP-032043 rejectedGERAN#16Nortel Networks...   MELCO, Nortel 
See details 05.10A082-F R1997MS reaction time upon reception of assignment message on CCCH Details GP-032042 rejectedGERAN#16Nortel Networks...   Melco, Nortel 
See details 05.10A0812F8.11.0R1999Correction of definition of ready to transmit for inter-RAT handover Details GP-032281 agreedGERAN#16Siemens Details GP-032281 approvedGERAN#16G18.12.02G3Ginterworking
See details 05.10A0811F R1999Correction of definition of ready to transmit for inter-RAT handover Details GP-032188 revisedGERAN#16Siemens    
See details 05.10A081-F R1999Correction of definition of ready to transmit for inter-RAT handover Details GP-031979 revisedGERAN#16Siemens    
See details 05.10A080-F R1999Correction of definition of ready to transmit for inter-RAT handover Details GP-031384 rejectedGERAN#15Siemens   Siemens 
See details 05.10A079-F R1999Clarification on continuous TA procedure Details GP-030881 rejectedGERAN#14Siemens AG   Siemens 
See details 05.10A078-F R1999Correction of interruption times for GSM to UTRAN TDD handover Details GP-030257 withdrawnGERAN-#12Siemens   Siemens 
See details 05.10A0772F8.10.0R1999Correction of interruption times for GSM to UTRAN FDD handover Details GP-030437 agreedGERAN-#12Siemens Details GP-030437 approvedGERAN-#12G18.11.02G3Ginterworking
See details 05.10A0771F R1999Correction of interruption times for GSM to UTRAN FDD handover Details GP-030374 revisedGERAN-#12Siemens    
See details 05.10A077-F R1999Correction of interruption times for GSM to UTRAN FDD handover Details GP-030254 revisedGERAN-#12Siemens    
See details 05.10A076-F8.10.0R1999Timing of DTM assignment Details GP-030213 agreedGERAN-#12Ericsson Details GP-030213 approvedGERAN-#12G18.11.0TEI
See details 05.10A0751F8.9.0R1999Correction to inter system handover interruption times Details GP-021929 agreedGERAN-#10Siemens, Samsung Details GP-021929 approvedGERAN-#10G18.10.02G3Ginterworking
See details 05.10A075-F R1999Correction to inter system handover interruption times Details GP-021759 revisedGERAN-#10Siemens, Samsung    
See details 05.10A0741F8.8.0R1999Clarification to Requirements for Synchronization at DTM operation Details GP-020452 agreedGERAN-#8 Details GP-020452 approvedGERAN-#8G18.9.0Class_A_Dual_Tr...
See details 05.10A074-F8.8.0R1999Clarification to Requirements for Synchronization at DTM operation Details GP-020087 revisedGERAN-#8   Ericsson Class_A_Dual_Tr...
See details 05.10A0731F8.7.0R1999Updates to GSM UTRAN Handover Interruption Times Details GP-010835 agreedGERAN-#4Siemens Details GP-010835 approvedGERAN-#4Siemens8.8.02G3Ghandover
See details 05.10A073-F8.7.0R1999Updates to GSM UTRAN Handover Interruption Times Details GP-010742  GERAN-#4Siemens Details GP-010742 revisedGERAN-#4Siemens 
See details 05.10A072-F8.7.0R1999Handover to UTRAN delay Details GP-010582  GERAN-#4Ericsson Details GP-010582 withdrawnGERAN-#4Ericsson 
See details 05.10A0711F8.7.0R1999Initial Assignment reaction time Details GP-010972  GERAN-#4Siemens AG Details GP-010972 postponedGERAN-#4Siemens 
See details 05.10A071-F8.7.0R1999Initial Assignment reaction time Details GP-010501  GERAN-#4Siemens AG Details GP-010501 revisedGERAN-#4Siemens 
See details 05.10A0691F8.6.1R1999Timing requirements for blind handover 2G->2G    Details GP-010440 approvedGERAN-#3Nortel Networks8.7.02G3Ginterworking
See details 05.10A069-F R1999Timing requirements for blind handover 2G->2G    Details GP-010382 revisedGERAN-#3Nortel Networks 
See details 05.10A068-F Rel-4Uplink and downlink assignment reaction time    Details GP-010141 rejectedGERAN-#3Motorola 
See details 05.10A0671F8.6.1R1999Delay requirements for blind handover to UTRAN    Details GP-010297 approvedGERAN-#3Ericsson8.7.02G3Ghandover
See details 05.10A067-F R1999Delay requirements for blind handover to UTRAN    Details GP-010099 revisedGERAN-#3Ericsson 
See details 05.10A0662F8.5.0R1999Reaction time at packet assignment with polling request Details GP-000903 agreedGERAN#2 Details GP-000903 approvedGERAN#2G18.6.0GPRS
See details 05.10A0661F8.5.0R1999Reaction time at packet assignment with polling request Details GP-000807 revisedGERAN#2 Details GP-000807  GERAN#2G1 GPRS
See details 05.10A066-F8.5.0R1999Reaction time at packet assignment with polling request Details GP-000613 revisedGERAN#2 Details GP-000613  GERAN#2G1 GPRS
See details 05.10A065-A8.5.0R1999Corrections to synchronized handover Details GP-000568 agreedGERAN#2Ericsson Details GP-000568 approvedGERAN#2G18.6.0TEI
See details 05.10A064-A7.3.0R1998Corrections to synchronized handover Details GP-000567 agreedGERAN#2Ericsson Details GP-000567 approvedGERAN#2G17.4.0TEI
See details 05.10A063-A6.6.0R1997Corrections to synchronized handover Details GP-000566 agreedGERAN#2Ericsson Details GP-000566 approvedGERAN#2G16.7.0TEI
See details 05.10A062-F5.3.0R1996Corrections to synchronized handover Details GP-000565 agreedGERAN#2Ericsson Details GP-000565 approvedGERAN#2G15.4.0TEI
See details 05.10A061-B8.4.0R199905.10-A061 Addition of the switching requirement for the GSM to UTRAN (R99) Details GP-000220 agreedGERAN#1Nokia Details GP-000220 approvedGERAN#1G18.5.02G3Ghandover
See details 05.10A060-F5.2.2R199605.10-A060 Removal of GPRS related text (R96) Details GP-000111 agreedGERAN#1Ericsson Details GP-000111 approvedGERAN#1G15.3.0TEI
See details 05.10A059-F8.4.0R199905.10-A059 Correction of assignment reaction time (R99) Details GP-000105 agreedGERAN#1Ericsson Details GP-000105 approvedGERAN#1G18.5.0GPRS
See details 05.10A0581B8.3.0R1999Class A Dual Transfer Mode (DTM) Details 2-001166 agreed  Details P-00-281 approved SMG28.4.0GPRS
See details 05.10A056-A8.2.0R1999BTS Synchronisation, Location Accuracy and LMU update rates Details 559/00 agreed  Details P-00-218 approved SMG28.3.0LCS
See details 05.10A055-C7.2.0R1998BTS Synchronisation, Location Accuracy and LMU update rates Details 558/00 agreed  Details P-00-218 approved SMG27.3.0LCS
See details 05.10A054-F8.2.0R1999EGPRS Classic to COMPACT BTS synchronisation Details 539/00 agreed  Details P-00-216 approved SMG28.3.0EDGE
See details 05.10A051-B8.1.0R1999Timegroup definition removal from 05.10 Details 2-00-144 agreed  Details P-00-095 approved SMG28.2.0EDGE-Compact
See details 05.10A050-B8.1.0R1999Modifications for 8-PSK Details 2-00-062 agreed  Details P-00-090 approved SMG28.2.0EDGE-Layer1
See details 05.10A049-B8.0.0R1999Defining the MS carrier frequency accuracy value for GSM 400 MS Details 2-99-G45 agreed  Details P-99-805 approved SMG28.1.0GSM_400
See details 05.10A0482C8.1.0R1999BTS Synchronisation, Location Accuracy and LMU update rates    Details P-00-062 postponed T1P1 LCS
See details 05.10A0481A8.0.0R1999LCS Location Measurement Unit Synchronization requirements, mirror to R'98 Details 2-99-J47 agreed  Details P-99-789 postponed SMG2 LCS
See details 05.10A0472C7.2.0R1998BTS Synchronisation, Location Accuracy and LMU update rates    Details P-00-061 postponed T1P1 LCS
See details 05.10A0471C7.2.0R1998LCS Location Measurement Unit Synchronization requirements Details 2-99-J46 agreed  Details P-99-789 postponed SMG2 LCS
See details 05.10A043-B8.0.0R1999Synchronization of 52-multiframes in EGPRS COMPACT Details 2-99-J55 agreed  Details P-99-802 approved SMG28.1.0EDGE-Compact
See details 05.10A042-A R1999Definition of other reaction times Details 2-99-E12 agreed  Details P-99-573 approved SMG28.0.0GPRS
See details 05.10A041-A7.1.0R1998Definition of other reaction times Details 2-99-E12 agreed  Details P-99-573 approved SMG27.2.0GPRS
See details 05.10A040-F6.5.0R1997Definition of other reaction times Details 2-99-E12 agreed  Details P-99-573 approved SMG26.6.0GPRS
See details 05.10A0391C8.0.0R1999Extended range TA information added in 05.10 Details 2-99-G43 agreed  Details P-99-805 approved SMG28.1.0GSM_400
See details 05.10A0381B R1999EDGE Compact logical channels Details 2-99-D93 agreed  Details P-99-589 approved SMG28.0.0EDGE-Compact 2G
See details 05.10A0361F7.0.0R1998Reaction time after contention resolution during one phase access Details 2-99-752 agreed  Details P-99-493 approved SMG27.1.0GPRS
See details 05.10A0351F6.4.0R1997Reaction time after contention resolution during one phase access Details 2-99-751 agreed  Details P-99-493 approved SMG26.5.0GPRS
See details 05.10A033-F7.0.0R1998Timing advance for access bursts on PTCCH/U Details 2-99-459 agreed  Details P-99-493 approved SMG27.1.0GPRS
See details 05.10A0291F6.4.0R1997Timing advance for access bursts on PTCCH/U Details 2-99-459 agreed  Details P-99-493 approved SMG26.5.0GPRS
See details 05.10A027-F7.0.0R1998Correction of CTS-FP frequency source correction slope Details 2-99-205 agreed  Details P-99-489 approved SMG27.1.0
See details 05.10A026-C6.3.0R1997Continuous timing advance procedure failure Details 2P99-123 agreed  Details P-99-170 approved SMG26.4.0GPRS
See details 05.10A025-B R1998Synchronisation requirements for the control of the CTS-FP service range Details 2P99-104 agreed  Details P-99-167 approved SMG27.0.0
See details 05.10A0232F6.3.0R1997Definition of additional GPRS related reaction times Details 2P99-078 agreed  Details P-99-170 approved SMG26.4.0GPRS
See details 05.10A0211F6.3.0R1997Correction of Timing Advance Procedure Details 2P99-054 agreed  Details P-99-170 approved SMG26.4.0GPRS
See details 05.10A020-F6.3.0R1997GPRS MS timing requirements Details S298-459 agreed  Details P-99-170 approved SMG26.4.0GPRS
See details 05.10A0193B R1998Synchronisation requirements for CTS Details 2P99-050 agreed  Details P-99-167 approved SMG27.0.0
See details 05.10A018-B R1998Harmonization between GSM and PCS 1900 standard Details S298-464 agreed  Details P-99-162 approved T1P1.57.0.0
See details 05.10A0172F6.2.0R1997Clarification of packet polling procedure for calculating new TA Details 393/98 agreed  Details 98-0712 approved SMG26.3.0GPRS
See details 05.10A016-F6.1.0R1997Correction to timing advance for GPRS Details 133/98 agreed  Details 98-0388 approved SMG26.2.0GPRS
See details 05.10A015-C6.0.0R1997GPRS, Missing Timing Advance Updates on PTCCH Details 56/98 agreed  Details 98-0182 approved SMG26.1.0GPRS
See details 05.10A014-C6.0.0R1997Renaming of GPRS RR states Details 40/98 agreed  Details 98-0182 approved SMG26.1.0GPRS
See details 05.10A013-C6.0.0R1997Clarification of the use of TAI Details 3/98 agreed  Details 98-0182 approved SMG26.1.0GPRS
See details 05.10A0111B R1997Introduction of the new Timing Advance Procedure for GPRS Details 276/97 agreed  Details 97-640 approved SMG2 GPRS
See details 05.10A0095B R1998Pico BTS (for information) Details 222/98 agreed  Details 98-0389 noted SMG2 
See details 05.10A008-B5.0.0R1996Introduction of high speed circuit switched data Details 188 agreed  Details 602/96 approved SMG25.1.0HSCSD
See details 05.10A007-F4.8.0Ph2Correction to synchronized handover Details 20/96 agreed  Details 202/96 approved SMG24.9.0
See details 05.10A006-F Ph2Correction and clarification of pseudo-synchronisation timing    Details 026/96 approved SMG24.8.0
See details 05.10A004-B R1996Addition of ASCI features Details 35/96 agreed  Details 336/96 approved SMG25.0.0ASCI
See details 05.100025-F Ph2Requirements on synchronisation Details 109/94 postponed    AEG 
See details 05.100024-F4.3.0Ph2Definition of ready to transmit    Details 38/94 approved SMG24.4.0
See details 05.100023-D Ph2Starting time Details 766/93      NMC 
See details 05.100023-D4.2.0Ph2Rewording of the reference to starting time    Details 604/93 approved SMG34.3.0
See details 05.100022-F Ph2Observed Time difference Details 829/93      WPA 
See details 05.100022-F4.2.0Ph2Observed time difference report    Details 605/93 approved SMG3 
See details 05.100021-F4.2.0Ph2Timing advance corrections    Details 582/93 approved PT12 
See details 05.100020-F4.2.0Ph2Mandatoriness of OTD reporting    Details 582/93 approved SMG2 
See details 05.100020-F Ph2Pseudo-synchronisation    Details 398/93 approved SMG24.2.0
See details 05.100019-F Ph2Clarification of the MS synchronisation requirements    Details 398/93 approved SMG2 
See details 05.100018-F Ph2Timing advance handling at the BS    Details 398/93 approved SMG2 
See details 05.100017-B Ph2MS synchronisation requirements      SMG2 
See details 05.100016-D Ph2Editorial changes to 05.10 v.4.1.1      PT12 
See details 05.1000151D Ph2Removal of { } in the text    Details 208/93 approved SMG24.4.0
See details 05.100015-D Ph2Removal of { } in the text      PT12 
See details 05.100014-C Ph2Pre-synchronised handover    Details 42/93 approved SMG24.4.0
See details 05.1000131D Ph1Clarification of Ready to transmit    Details 546/92r1 approved PT 123.5.1
See details 05.100013-D Ph1Clarification of Ready to transmit    Details 546/92 revised PT 12  2G
See details 05.1000121D Ph2Editorial changes to pseudo synchronization scheme    Details 199/92 approved PT 124.4.0
See details 05.100012-D Ph2Editorial changes to pseudo-synchronization scheme      PT 12 
See details 05.100011-C Ph2Addition of the definition of MS timing offset    Details 51/92 approved GSM24.4.0
See details 05.100010-D Ph2Editorial changes to 05.10.    Details 51/92 approved GSM2 
See details 05.100009-E Ph1Clarification of which BS and MS Synchronization requirements shall be met under which conditions    Details 58/91 approved GSM23.5.1
See details 05.100008-A Ph1Received signal timing jumps, reception gaps and handover timings    Details 75/90 approved GSM 2  2G
See details 05.100007-A Ph1Accuracy of Timing Information of Neighbouring BS's Stored in an MS    Details 442/89 approved UK 
See details 05.1000061F Ph2Pseudo synchronisation    Details 54/92 approved GSM2 
See details 05.100006-C Ph1Introduction of the Pseudo-Synchronization Scheme    approved GSM2 
See details 05.100005-A Ph1Handling of Timing Advance at Handover    Details 304/89 approved GSM2 
See details 05.100004-B Ph1Introduction of Dummy TA    Details 304/89 approved GSM2 
See details 05.100003-A Ph1Corrections of Omissions    Details 304/89 approved GSM2 
See details 05.100002-A Ph1Results of some outstanding actions on rec 05.10    approved WP2 
See details 05.100001- Ph1Radio Subsystem Synchronisation    approved WP2