• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 109 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
05.10A084- R1999MS reaction time upon reception of assignment message on CCCHGP-032044rejected-  
05.10A083- R1998MS reaction time upon reception of assignment message on CCCHGP-032043rejected-  
05.10A082- R1997MS reaction time upon reception of assignment message on CCCHGP-032042rejected-  
05.10A08128.11.0R1999Correction of definition of ready to transmit for inter-RAT handoverGP-032281agreedGP-032281approved8.12.0
05.10A0811 R1999Correction of definition of ready to transmit for inter-RAT handoverGP-032188revised-  
05.10A081- R1999Correction of definition of ready to transmit for inter-RAT handoverGP-031979revised-  
05.10A080- R1999Correction of definition of ready to transmit for inter-RAT handoverGP-031384rejected-  
05.10A079- R1999Clarification on continuous TA procedureGP-030881rejected-  
05.10A078- R1999Correction of interruption times for GSM to UTRAN TDD handoverGP-030257withdrawn-  
05.10A07728.10.0R1999Correction of interruption times for GSM to UTRAN FDD handoverGP-030437agreedGP-030437approved8.11.0
05.10A0771 R1999Correction of interruption times for GSM to UTRAN FDD handoverGP-030374revised-  
05.10A077- R1999Correction of interruption times for GSM to UTRAN FDD handoverGP-030254revised-  
05.10A076-8.10.0R1999Timing of DTM assignmentGP-030213agreedGP-030213approved8.11.0
05.10A07518.9.0R1999Correction to inter system handover interruption timesGP-021929agreedGP-021929approved8.10.0
05.10A075- R1999Correction to inter system handover interruption timesGP-021759revised-  
05.10A07418.8.0R1999Clarification to Requirements for Synchronization at DTM operationGP-020452agreedGP-020452approved8.9.0
05.10A074-8.8.0R1999Clarification to Requirements for Synchronization at DTM operationGP-020087revised-  
05.10A07318.7.0R1999Updates to GSM UTRAN Handover Interruption TimesGP-010835agreedGP-010835approved8.8.0
05.10A073-8.7.0R1999Updates to GSM UTRAN Handover Interruption TimesGP-010742 GP-010742revised 
05.10A072-8.7.0R1999Handover to UTRAN delayGP-010582 GP-010582withdrawn 
05.10A07118.7.0R1999Initial Assignment reaction timeGP-010972 GP-010972postponed 
05.10A071-8.7.0R1999Initial Assignment reaction timeGP-010501 GP-010501revised 
05.10A06918.6.1R1999Timing requirements for blind handover 2G->2G- GP-010440approved8.7.0
05.10A069- R1999Timing requirements for blind handover 2G->2G- GP-010382revised 
05.10A068- Rel-4Uplink and downlink assignment reaction time- GP-010141rejected 
05.10A06718.6.1R1999Delay requirements for blind handover to UTRAN- GP-010297approved8.7.0
05.10A067- R1999Delay requirements for blind handover to UTRAN- GP-010099revised 
05.10A06628.5.0R1999Reaction time at packet assignment with polling requestGP-000903agreedGP-000903approved8.6.0
05.10A06618.5.0R1999Reaction time at packet assignment with polling requestGP-000807revisedGP-000807  
05.10A066-8.5.0R1999Reaction time at packet assignment with polling requestGP-000613revisedGP-000613  
05.10A065-8.5.0R1999Corrections to synchronized handoverGP-000568agreedGP-000568approved8.6.0
05.10A064-7.3.0R1998Corrections to synchronized handoverGP-000567agreedGP-000567approved7.4.0
05.10A063-6.6.0R1997Corrections to synchronized handoverGP-000566agreedGP-000566approved6.7.0
05.10A062-5.3.0R1996Corrections to synchronized handoverGP-000565agreedGP-000565approved5.4.0
05.10A061-8.4.0R199905.10-A061 Addition of the switching requirement for the GSM to UTRAN (R99)GP-000220agreedGP-000220approved8.5.0
05.10A060-5.2.2R199605.10-A060 Removal of GPRS related text (R96)GP-000111agreedGP-000111approved5.3.0
05.10A059-8.4.0R199905.10-A059 Correction of assignment reaction time (R99)GP-000105agreedGP-000105approved8.5.0
05.10A05818.3.0R1999Class A Dual Transfer Mode (DTM)2-001166agreedP-00-281approved8.4.0
05.10A056-8.2.0R1999BTS Synchronisation, Location Accuracy and LMU update rates559/00agreedP-00-218approved8.3.0
05.10A055-7.2.0R1998BTS Synchronisation, Location Accuracy and LMU update rates558/00agreedP-00-218approved7.3.0
05.10A054-8.2.0R1999EGPRS Classic to COMPACT BTS synchronisation539/00agreedP-00-216approved8.3.0
05.10A051-8.1.0R1999Timegroup definition removal from 05.102-00-144agreedP-00-095approved8.2.0
05.10A050-8.1.0R1999Modifications for 8-PSK2-00-062agreedP-00-090approved8.2.0
05.10A049-8.0.0R1999Defining the MS carrier frequency accuracy value for GSM 400 MS2-99-G45agreedP-99-805approved8.1.0
05.10A04828.1.0R1999BTS Synchronisation, Location Accuracy and LMU update rates- P-00-062postponed 
05.10A04818.0.0R1999LCS Location Measurement Unit Synchronization requirements, mirror to R'982-99-J47agreedP-99-789postponed 
05.10A04727.2.0R1998BTS Synchronisation, Location Accuracy and LMU update rates- P-00-061postponed 
05.10A04717.2.0R1998LCS Location Measurement Unit Synchronization requirements2-99-J46agreedP-99-789postponed 
05.10A043-8.0.0R1999Synchronization of 52-multiframes in EGPRS COMPACT2-99-J55agreedP-99-802approved8.1.0
05.10A042- R1999Definition of other reaction times2-99-E12agreedP-99-573approved8.0.0
05.10A041-7.1.0R1998Definition of other reaction times2-99-E12agreedP-99-573approved7.2.0
05.10A040-6.5.0R1997Definition of other reaction times2-99-E12agreedP-99-573approved6.6.0
05.10A03918.0.0R1999Extended range TA information added in 05.102-99-G43agreedP-99-805approved8.1.0
05.10A0381 R1999EDGE Compact logical channels2-99-D93agreedP-99-589approved8.0.0
05.10A03617.0.0R1998Reaction time after contention resolution during one phase access2-99-752agreedP-99-493approved7.1.0
05.10A03516.4.0R1997Reaction time after contention resolution during one phase access2-99-751agreedP-99-493approved6.5.0
05.10A033-7.0.0R1998Timing advance for access bursts on PTCCH/U2-99-459agreedP-99-493approved7.1.0
05.10A02916.4.0R1997Timing advance for access bursts on PTCCH/U2-99-459agreedP-99-493approved6.5.0
05.10A027-7.0.0R1998Correction of CTS-FP frequency source correction slope2-99-205agreedP-99-489approved7.1.0
05.10A026-6.3.0R1997Continuous timing advance procedure failure2P99-123agreedP-99-170approved6.4.0
05.10A025- R1998Synchronisation requirements for the control of the CTS-FP service range2P99-104agreedP-99-167approved7.0.0
05.10A02326.3.0R1997Definition of additional GPRS related reaction times2P99-078agreedP-99-170approved6.4.0
05.10A02116.3.0R1997Correction of Timing Advance Procedure2P99-054agreedP-99-170approved6.4.0
05.10A020-6.3.0R1997GPRS MS timing requirementsS298-459agreedP-99-170approved6.4.0
05.10A0193 R1998Synchronisation requirements for CTS2P99-050agreedP-99-167approved7.0.0
05.10A018- R1998Harmonization between GSM and PCS 1900 standardS298-464agreedP-99-162approved7.0.0
05.10A01726.2.0R1997Clarification of packet polling procedure for calculating new TA393/98agreed98-0712approved6.3.0
05.10A016-6.1.0R1997Correction to timing advance for GPRS133/98agreed98-0388approved6.2.0
05.10A015-6.0.0R1997GPRS, Missing Timing Advance Updates on PTCCH56/98agreed98-0182approved6.1.0
05.10A014-6.0.0R1997Renaming of GPRS RR states40/98agreed98-0182approved6.1.0
05.10A013-6.0.0R1997Clarification of the use of TAI3/98agreed98-0182approved6.1.0
05.10A0111 R1997Introduction of the new Timing Advance Procedure for GPRS276/97agreed97-640approved 
05.10A0095 R1998Pico BTS (for information)222/98agreed98-0389noted 
05.10A008-5.0.0R1996Introduction of high speed circuit switched data188agreed602/96approved5.1.0
05.10A007-4.8.0Ph2Correction to synchronized handover20/96agreed202/96approved4.9.0
05.10A006- Ph2Correction and clarification of pseudo-synchronisation timing- 026/96approved4.8.0
05.10A004- R1996Addition of ASCI features35/96agreed336/96approved5.0.0
05.100025- Ph2Requirements on synchronisation109/94postponed-  
05.100024-4.3.0Ph2Definition of ready to transmit- 38/94approved4.4.0
05.100023- Ph2Starting time766/93 -  
05.100023-4.2.0Ph2Rewording of the reference to starting time- 604/93approved4.3.0
05.100022- Ph2Observed Time difference829/93 -  
05.100022-4.2.0Ph2Observed time difference report- 605/93approved 
05.100021-4.2.0Ph2Timing advance corrections- 582/93approved 
05.100020-4.2.0Ph2Mandatoriness of OTD reporting- 582/93approved 
05.100020- Ph2Pseudo-synchronisation- 398/93approved4.2.0
05.100019- Ph2Clarification of the MS synchronisation requirements- 398/93approved 
05.100018- Ph2Timing advance handling at the BS- 398/93approved 
05.100017- Ph2MS synchronisation requirements- -  
05.100016- Ph2Editorial changes to 05.10 v.4.1.1- -  
05.1000151 Ph2Removal of { } in the text- 208/93approved4.4.0
05.100015- Ph2Removal of { } in the text- -  
05.100014- Ph2Pre-synchronised handover- 42/93approved4.4.0
05.1000131 Ph1Clarification of Ready to transmit- 546/92r1approved3.5.1
05.100013- Ph1Clarification of Ready to transmit- 546/92revised 
05.1000121 Ph2Editorial changes to pseudo synchronization scheme- 199/92approved4.4.0
05.100012- Ph2Editorial changes to pseudo-synchronization scheme- -  
05.100011- Ph2Addition of the definition of MS timing offset- 51/92approved4.4.0
05.100010- Ph2Editorial changes to 05.10.- 51/92approved 
05.100009- Ph1Clarification of which BS and MS Synchronization requirements shall be met under which conditions- 58/91approved3.5.1
05.100008- Ph1Received signal timing jumps, reception gaps and handover timings- 75/90approved 
05.100007- Ph1Accuracy of Timing Information of Neighbouring BS's Stored in an MS- 442/89approved 
05.1000061 Ph2Pseudo synchronisation- 54/92approved 
05.100006- Ph1Introduction of the Pseudo-Synchronization Scheme- -approved 
05.100005- Ph1Handling of Timing Advance at Handover- 304/89approved 
05.100004- Ph1Introduction of Dummy TA- 304/89approved 
05.100003- Ph1Corrections of Omissions- 304/89approved 
05.100002- Ph1Results of some outstanding actions on rec 05.10- -approved 
05.100001- Ph1Radio Subsystem Synchronisation- -approved