|
| 08.18 | A144 | 1 | F | 8.11.0 | R1999 | Length of ABQP IE in BSSGP |
GP-041093
| agreed | GERAN#19 | Motorola |
GP-041093
| approved | GERAN#19 | G2 | 8.12.0 | TEI |
|
|
| 08.18 | A144 | - | F | 8.11.0 | R1999 | Length of ABQP IE in BSSGP |
GP-040926
| revised | GERAN#19 | Motorola |
| | | G2 | | TEI |
|
|
| 08.18 | A143 | - | F | 8.10.0 | R1999 | Removal of PFC Transfer Result indication |
GP-040111
| agreed | GERAN#18 | Siemens |
GP-040111
| approved | GERAN#18 | G2 | 8.11.0 | TEI |
|
|
| 08.18 | A142 | 1 | F | 8.10.0 | R1999 | Correction to the handling of unsuccessful PFC transfer procedure upon cell change |
GP-032085
| withdrawn | GERAN#16 | Alcatel, T-Mobile |
| | | G2 | | TEI |
|
|
| 08.18 | A142 | - | F | 8.10.0 | R1999 | Correction to the handling of unsuccessful PFC transfer procedure upon cell change |
G2-030317
| revised | GERAN2#14 | Nokia, Alcatel |
| | | G2 | | TEI |
|
|
| 08.18 | A141 | - | F | 8.9.0 | R1999 | Usage of Allocation/Retention Priority |
G2-020714
| withdrawn | GERAN2-#11 | Siemens AG |
| | | G2 | | TEI |
|
|
| 08.18 | A140 | - | F | 8.10.0 | R1999 | Setting of RAI in Suspend and appropriate handling in SGSN |
GP-022555
| rejected | GERAN-#11 | Siemens AG |
| | | | | TEI |
|
|
| 08.18 | A139 | 1 | F | | R1999 | Removal of an inconsistency in LLC DISCARDED description |
GP-021885
| rejected | GERAN-#10 | Nortel Networks |
| | | | | GPRS |
|
|
| 08.18 | A139 | - | F | | R1999 | Removal of an inconsistency in LLC DISCARDED description |
GP-021688
| revised | GERAN-#10 | Nortel Networks |
| | | | | GPRS |
|
|
| 08.18 | A138 | 3 | F | 8.9.0 | R1999 | Correction to PFC transfer procedure upon cell change |
GP-021246
| agreed | GERAN-#9 | |
GP-021246
| approved | GERAN-#9 | G2 | 8.10.0 | GPRS |
|
|
| 08.18 | A138 | 2 | F | | R1999 | Correction to PFC transfer procedure upon cell change |
GP-021071
| revised | GERAN-#9 | |
| | | | | GPRS |
|
|
| 08.18 | A138 | 1 | F | | R1999 | Correction to PFC transfer procedure upon cell change |
GP-020970
| revised | GERAN-#9 | |
| | | | | GPRS |
|
|
| 08.18 | A138 | - | F | | R1999 | Correction to PFC transfer procedure upon cell change |
G2-020326
| revised | GERAN2-#8 | Alcatel |
| | | | | GPRS |
|
|
| 08.18 | A137 | - | F | 8.9.0 | R1999 | Correction of code points in IEI (R99) |
GP-012166
| rejected | GERAN-#7 | G2 secretary |
| | | G2 | | TEI |
|
|
| 08.18 | A136 | - | F | 8.9.0 | R1999 | Correction of code points in IEI (R99) |
GP-012163
| rejected | GERAN-#7 | G2 secretary |
| | | G2 | | TEI |
|
|
| 08.18 | A135 | - | F | 8.8.0 | R1999 | BVC-RESET in case of SGSN / Gb failures (R99) |
| rejected | | |
GP-011795
| | GERAN-#6 | G2 | | GPRS |
|
|
| 08.18 | A134 | - | B | 8.8.0 | R1999 | Introduction of DCCM-A (R99) |
| | | |
GP-011582
| withdrawn | GERAN-#6 | G2 | | |
|
|
| 08.18 | A133 | - | B | 7.5.0 | R1998 | Introduction of DCCM-A (R98) |
| | | |
GP-011581
| withdrawn | GERAN-#6 | G2 | | |
|
|
| 08.18 | A132 | - | F | 8.8.0 | R1999 | Clarification of Packet Flow Timer (R99) |
| agreed | | |
GP-011539
| approved | GERAN-#6 | G2 | 8.9.0 | Packet_Flow_Man... |
|
|
| 08.18 | A131 | - | B | 6.8.0 | R1997 | Introduction of Dual Control Channel Mode (DCCM/B) |
G2-010030
| | GERAN2-#5 BIS | |
| withdrawn | | G2 | | |
|
|
| 08.18 | A130 | 1 | B | 6.8.0 | R1997 | Introduction of DCCM-A (R97) |
| | | |
GP-011580
| withdrawn | GERAN-#6 | G2 | | |
|
|
| 08.18 | A130 | - | B | 6.8.0 | R1997 | Introduction of Dual Control Channel Mode (DCCM/A) |
G2-010024
| | GERAN2-#5 BIS | |
| withdrawn | | G2 | | |
|
|
| 08.18 | A129 | - | A | | R1998 | Rate of transmission of flow control packets on Gb interface |
| | | |
GP-011293
| approved | GERAN-#5 | WG2 | 7.3.0 | GPRS |
|
|
| 08.18 | A128 | - | F | 6.5.0 | R1997 | Rate of transmission of flow control packets on Gb interface |
| | | |
GP-011292
| approved | GERAN-#5 | WG2 | 6.2.0 | GPRS |
|
|
| 08.18 | A127 | - | F | 8.7.0 | R1999 | Bucket indicator, bucket filled ratio |
| | | |
GP-011298
| approved | GERAN-#5 | WG2 | 8.8.0 | GPRS |
|
|
| 08.18 | A126 | - | F | 8.7.0 | R1999 | BVC unblocking and BVC reset procedures interleaving |
| | | |
GP-011183
| rejected | GERAN-#5 | WG2 | | GPRS |
|
|
| 08.18 | A125 | 1 | A | 8.7.0 | R1999 | Rate of transmission of flow control packets on Gb interface |
| | | |
GP-011294
| approved | GERAN-#5 | WG2 | 8.8.0 | GPRS |
|
|
| 08.18 | A125 | - | F | 8.7.0 | R1999 | Rate of transmission of flow control packets on Gb interface |
| | | |
GP-011106
| revised | GERAN-#5 | WG2 | | GPRS |
|
|
| 08.18 | A124 | 1 | F | 8.6.0 | R1999 | Introduction of the UTRAN CCO IE in the CREATE-BSS-PFC PDU |
GP-010897
| agreed | GERAN-#4 | Vodafone. |
GP-010897
| approved | GERAN-#4 | G2 | 8.7.0 | 2G3Ginterworking |
|
|
| 08.18 | A124 | - | F | 8.6.0 | R1999 | Introduction of the UTRAN CCO IE in the CREATE-BSS-PFC PDU |
GP-010778
| revised | GERAN-#4 | Vodafone. |
| | | G2 | | 2G3Ginterworking |
|
|
| 08.18 | A123 | 1 | F | 8.6.0 | R1999 | Removal of BVC Reset / BVC blocking procedure contradiction |
GP-010829
| agreed | GERAN-#4 | Siemens |
GP-010829
| approved | GERAN-#4 | G2 | 8.7.0 | GPRS |
|
|
| 08.18 | A123 | - | F | 8.6.0 | R1999 | Removal of BVC Reset / BVC blocking procedure contradiction |
GP-010747
| revised | GERAN-#4 | Siemens |
| | | G2 | | GPRS |
|
|
| 08.18 | A122 | 2 | F | 8.6.0 | R1999 | Rate of transmission of flow control packets on Gb interface |
GP-010949
| withdrawn | | |
| | | G2 | | GPRS |
|
|
| 08.18 | A122 | 1 | F | 8.6.0 | R1999 | Rate of transmission of flow control packets on Gb interface |
GP-010923
| revised | GERAN-#4 | Siemens |
| | | G2 | | GPRS |
|
|
| 08.18 | A122 | - | F | 8.6.0 | R1999 | Rate of transmission of flow control packets on Gb interface |
GP-010744
| revised | GERAN-#4 | Siemens |
| | | G2 | | GPRS |
|
|
| 08.18 | A121 | 1 | F | 8.6.0 | R1999 | Transmitted values in BSSGP: two clarifications |
GP-010696
| revised | GERAN-#4 | Vodafone. |
| | | G2 | | TEI |
|
|
| 08.18 | A121 | - | F | 8.6.0 | R1999 | Transmitted values in BSSGP: two clarifications |
GP-010826
| agreed | GERAN-#4 | Vodafone. |
GP-010826
| approved | GERAN-#4 | G2 | 8.7.0 | TEI |
|
|
| 08.18 | A119 | - | F | 8.6.0 | R1999 | Cause 'BVCI Unknown' allowed in STATUS PDU |
GP-010476
| agreed | GERAN-#4 | Nortel Networks |
GP-010476
| approved | GERAN-#4 | G2 | 8.7.0 | GPRS |
|
|
| 08.18 | A118 | 2 | F | 8.5.0 | R1999 | Service based' Network initiated Cell Change Order to UTRAN |
GP-010455
| agreed | GERAN-#3 | Vodafone, T-Mobil. |
GP-010455
| approved | GERAN-#3 | G2 | 8.6.0 | 2G3Ginterworking |
|
|
| 08.18 | A118 | 1 | F | 8.5.0 | R1999 | Service based' Network initiated Cell Change Order to UTRAN |
GP-010315
| revised | GERAN-#3 | Vodafone, T-Mobil. |
| | | G2 | | 2G3Ginterworking |
|
|
| 08.18 | A118 | - | F | 8.5.0 | R1999 | Service based' Network initiated Cell Change Order to UTRAN |
GP-010061
| revised | GERAN-#3 | Vodafone, T-Mobil. |
| | | G2 | | 2G3Ginterworking |
|
|
| 08.18 | A117 | - | F | 8.5.0 | R1999 | Correction to 08.18 |
GP-010313
| agreed | GERAN-#3 | Motorola |
GP-010313
| approved | GERAN-#3 | G2 | 8.6.0 | GPRS |
|
|
| 08.18 | A116 | 1 | F | 8.5.0 | R1999 | Rate of transmission of flow control packets on the Gb interface |
GP-010309
| withdrawn | GERAN-#3 | |
| | | G2 | | GPRS |
|
|
| 08.18 | A116 | - | F | 8.5.0 | R1999 | Rate of transmission of flow control packets on the Gb interface |
GP-010143
| revised | GERAN-#3 | Siemens |
| | | G2 | | TEI |
|
|
| 08.18 | A115 | 1 | A | 8.5.0 | R1999 | Alignment Octet/LLC-PDU re-union and spare values clarification |
GP-010402
| agreed | GERAN-#3 | Vodafone Group |
GP-010402
| approved | GERAN-#3 | G2 | 8.6.0 | TEI |
|
|
| 08.18 | A115 | - | A | 8.5.0 | R1999 | Alignment Octet/LLC-PDU re-union and spare values clarification |
GP-010065
| revised | GERAN-#3 | Vodafone Group. |
| | | G2 | | TEI |
|
|
| 08.18 | A114 | 1 | F | 7.3.1 | R1998 | Alignment Octet/LLC-PDU re-union and spare values clarification |
GP-010401
| agreed | GERAN-#3 | Vodafone Group |
GP-010401
| approved | GERAN-#3 | G2 | 7.4.0 | TEI |
|
|
| 08.18 | A114 | - | F | 7.3.1 | R1998 | Alignment Octet/LLC-PDU re-union and spare values clarification |
GP-010064
| revised | GERAN-#3 | Vodafone Group. |
| | | G2 | | TEI |
|
|
| 08.18 | A113 | - | F | | R1997 | Spare values clarification |
GP-010063
| withdrawn | GERAN-#3 | Vodafone Group. |
| | | G2 | | GPRS |
|
|
| 08.18 | A112 | - | A | 7.3.1 | R1998 | Flow control procedures |
GP-000820
| withdrawn | GERAN#2 | Nokia |
| | | G2 | | GPRS |
|
|
| 08.18 | A111 | - | F | 6.7.1 | R1997 | Flow control procedures |
GP-000819
| withdrawn | GERAN#2 | Nokia |
| | | G2 | | GPRS |
|
|
| 08.18 | A110 | 1 | A | 8.4.0 | R1999 | Flow control procedures |
GP-000818
| withdrawn | GERAN#2 | Nokia |
| | | G2 | | GPRS |
|
|
| 08.18 | A110 | - | F | 8.4.0 | R1999 | Flow control procedure |
GP-000746
| revised | GERAN#2 | Nokia |
| | | G2 | | GPRS |
|
|
| 08.18 | A109 | 1 | C | | Rel-4 | Blocking procedures |
GP-000817
| withdrawn | GERAN#2 | Nokia |
| | | G2 | | GPRS |
|
|
| 08.18 | A109 | - | F | 8.4.0 | R1999 | Blocking procedure |
GP-000745
| revised | GERAN#2 | Nokia |
| | | G2 | | GPRS |
|
|
| 08.18 | A108 | - | B | | Rel-4 | Support for Zero Length Unitdata |
GP-000561
| agreed | GERAN#2 | Alcatel, ATTWS,... |
GP-000561
| approved | GERAN#2 | G2 | | GbIP |
|
|
| 08.18 | A108 | - | F | 8.3.0 | R1999 | Leaky bucket synchronization in BSSGP |
GP-000398
| revised | GERAN#1 | |
| | | G2 | | GPRS |
|
|
| 08.18 | A107 | 3 | F | 8.4.0 | R1999 | Leaky bucket synchronization in BSSGP |
GP-000900
| agreed | GERAN#2 | Motorola |
GP-000900
| approved | GERAN#2 | G2 | 8.5.0 | GPRS |
|
|
| 08.18 | A107 | 2 | F | 8.4.0 | R1999 | Leaky bucket synchronization in BSSGP |
GP-000813
| revised | GERAN#2 | Motorola |
| | | G2 | | GPRS |
|
|
| 08.18 | A107 | 1 | F | 8.3.0 | R1999 | Leaky bucket synchronization in BSSGP |
GP-000420
| revised | GERAN#1 | Motorola |
| | | G2 | | GPRS |
|
|
| 08.18 | A107 | - | F | 8.3.0 | R1999 | Gb Interface: BSS Packet Flow Context Procedures |
GP-000309
| agreed | GERAN#1 | |
GP-000309
| approved | GERAN#1 | G2 | 8.4.0 | GPRS |
|
|
| 08.18 | A106 | - | F | 8.3.0 | R1999 | DTM: reuse of the GPRS Suspension procedure in cells with no DTM capabilities |
GP-000139
| agreed | GERAN#1 | Vodafone |
GP-000139
| approved | GERAN#1 | G2 | 8.4.0 | GPRS |
|
|
| 08.18 | A105 | - | F | 8.3.0 | R1999 | DTM: download of the IMSI from the SGSN to the BSC |
GP-000135
| agreed | GERAN#1 | Vodafone |
GP-000135
| approved | GERAN#1 | G2 | 8.4.0 | GPRS |
|
|
| 08.18 | A104 | - | F | 8.3.0 | R1999 | DTM: tunnelling of GPRS signalling on the main DCCH |
GP-000129
| agreed | GERAN#1 | Nokia, Vodafone |
GP-000129
| approved | GERAN#1 | G2 | 8.4.0 | GPRS |
|
|
| 08.18 | A103 | - | B | 8.1.0 | R1999 | EDGE Compact and support for EGPRS in ANSI-136 networks |
511/00
| | | |
P-00-165
| approved | | SMG2 | 8.2.0 | GPRS |
|
|
| 08.18 | A102 | 2 | B | 8.3.0 | R1999 | Gb Interface: BSSGP feature negotiation |
827/00
| agreed | | |
P-00-196
| approved | | SMG2 | 8.4.0 | GPRS |
|
|
| 08.18 | A098 | - | A | 8.1.0 | R1999 | DL-UNITDATA PDU without DRX parameters IE |
175/00
| | | |
P-00-110
| approved | | SMG2 | 8.2.0 | GPRS |
|
|
| 08.18 | A097 | - | A | | R1998 | DL-UNITDATA PDU without DRX parameters IE |
174/00
| | | |
P-00-110
| approved | | SMG2 | 7.3.0 | GPRS |
|
|
| 08.18 | A096 | - | F | | R1997 | DL-UNITDATA PDU without DRX parameters IE |
173/00
| | | |
P-00-110
| approved | | SMG2 | 6.7.0 | GPRS |
|
|
| 08.18 | A094 | 1 | A | | R1998 | Length of V part of MS Radio Access Capability |
315/00
| | | |
P-00-110
| approved | | SMG2 | 7.3.0 | GPRS |
|
|
| 08.18 | A093 | 1 | F | | R1997 | Length of V part of MS Radio Access Capability |
314/00
| | | |
P-00-110
| approved | | SMG2 | 6.7.0 | GPRS |
|
|
| 08.18 | A089 | 2 | B | 8.3.0 | R1999 | Gb Interface: BSS Packet Flow Context Procedures |
828/00
| agreed | | |
P-00-196
| approved | | SMG2 | 8.4.0 | GPRS |
|
|
| 08.18 | A084 | 1 | A | 8.0.0 | R1999 | BSSGP error handling |
1897/99
| agreed | | |
P-99-782
| approved | | SMG2 | 8.1.0 | GPRS |
|
|
| 08.18 | A083 | 1 | A | 8.0.0 | R1999 | FLUSH-LL: Transfer of LLC-PDU(s) to new routing area |
1832/99
| agreed | | |
P-99-782
| approved | | SMG2 | 8.1.0 | GPRS |
|
|
| 08.18 | A082 | 1 | A | 7.1.0 | R1998 | FLUSH-LL: Transfer of LLC-PDU(s) to new routing area |
1831/99
| agreed | | |
P-99-782
| approved | | SMG2 | 7.3.0 | GPRS |
|
|
| 08.18 | A081 | 1 | F | 6.3.0 | R1997 | FLUSH-LL: Transfer of LLC-PDU(s) to new routing area |
1830/99
| agreed | | |
P-99-782
| approved | | SMG2 | 6.4.0 | GPRS |
|
|
| 08.18 | A078 | - | A | | R1999 | MS Radio Access Capability |
1282/99
| agreed | | |
P-99-611
| approved | | SMG2 | 8.0.0 | EDGE |
|
|
| 08.18 | A072 | - | A | 7.0.0 | R1998 | Downlink data transfer |
940/99
| agreed | | |
P-99-612
| approved | | SMG2 | 7.1.0 | GPRS |
|
|
| 08.18 | A071 | - | F | 6.4.0 | R1997 | Downlink data transfer |
939/99
| agreed | | |
P-99-612
| approved | | SMG2 | 6.5.0 | GPRS |
|
|
| 08.18 | A070 | 1 | A | 7.0.0 | R1998 | Corrections to BSSGP |
1360/99
| agreed | | |
P-99-612
| approved | | SMG2 | 7.1.0 | GPRS |
|
|
| 08.18 | A069 | 1 | F | 6.4.0 | R1997 | Corrections to BSSGP |
1359/99
| agreed | | |
P-99-612
| approved | | SMG2 | 6.5.0 | GPRS |
|
|
| 08.18 | A068 | 2 | A | 7.0.0 | R1998 | BSSGP error handling |
1896/99
| agreed | | |
P-99-782
| approved | | SMG2 | 7.1.0 | GPRS |
|
|
| 08.18 | A067 | 2 | F | 6.4.0 | R1997 | BSSGP error handling |
1895/99
| agreed | | |
P-99-782
| approved | | SMG2 | 6.5.0 | GPRS |
|
|
| 08.18 | A064 | - | F | 6.3.0 | R1997 | Length of MS Radio Access Capability IE |
| agreed | | |
P-99-524
| approved | | SMG2 | 6.4.0 | GPRS |
|
|
| 08.18 | A062 | - | F | 6.3.0 | R1997 | Correction of PAGING PS message |
469/99
| agreed | | |
P-99-389
| approved | | SMG2 | 6.4.0 | GPRS |
|
|
| 08.18 | A060 | 2 | F | 6.3.0 | R1997 | Clarification to Paging procedure |
2A99-385
| agreed | | |
P-99-389
| approved | | SMG2 | 6.4.0 | GPRS |
|
|
| 08.18 | A059 | - | F | 6.3.0 | R1997 | Correction of RA-CAPABILITY-UPDATE-ACK PDU at failed RA-CAPABILITY-UPDATE procedure |
2A99-297
| agreed | | |
P-99-389
| approved | | SMG2 | 6.4.0 | GPRS |
|
|
| 08.18 | A058 | - | F | 6.3.0 | R1997 | Encoding of the information elements IMSI, TLLI, TMSI and Mobile Id |
2A99-245
| agreed | | |
P-99-389
| approved | | SMG2 | 6.4.0 | GPRS |
|
|
| 08.18 | A056 | 1 | F | 6.2.0 | R1997 | Correction of QoS profile in UL-UNITDATA PDU |
2A99-188
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A052 | - | F | 6.2.0 | R1997 | LLC PDU Type in Downlink UNITDATA |
2A99-086
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A051 | 1 | F | 6.2.0 | R1997 | Correction and clarification of BVC (Un)block procedures for sig BVC |
2A99-182
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A050 | 1 | F | 6.2.0 | R1997 | Correction and clarification of BVC reset procedure for sig BVC |
2A99-183
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A049 | - | D | 6.2.0 | R1997 | LLC_SDU replaced by LLC-PDU |
298A816
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A047 | 1 | F | 6.2.0 | R1997 | MS radio access capabilities conditional in DL_UNIDATA PDU |
298A815
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A045 | - | F | 6.2.0 | R1997 | 08.18 A045 Flow Control Parameter C |
298A758
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A044 | - | F | 6.2.0 | R1997 | Improvement of Flush procedure |
S298A701
| agreed | | |
P-99-170
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A042 | 2 | D | 6.3.0 | R1997 | Clarification on mapping of BVCIs to functional entities |
2A99-351
| agreed | | |
P-99-389
| approved | | SMG2 | 6.4.0 | GPRS |
|
|
| 08.18 | A041 | 5 | B | | R1998 | Addition of SoLSA functionality |
745/99
| agreed | | |
P-99-393
| approved | | SMG2 | 7.0.0 | SoLSA |
|
|
| 08.18 | A039 | - | F | 6.2.0 | R1997 | Signalling functional entity |
298A718
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A038 | 1 | F | 6.2.0 | R1997 | Fuctional changes to GSM 08.18 |
298A813
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A037 | 1 | F | 6.2.0 | R1997 | Alignment of service primitives with GSM 04.64 v 6.1.0 |
298A820
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A036 | - | F | 6.2.0 | R1997 | Transmission of STATUS when the BVC is blocked |
298A649
| agreed | | |
P-99-069
| approved | | SMG2 | 6.3.0 | GPRS |
|
|
| 08.18 | A031 | - | F | 6.1.0 | R1997 | Incorrect DRX parameter IE size |
298A498
| agreed | | |
98-0663
| approved | | SMG2-WPA | 6.2.0 | GPRS |
|
|
| 08.18 | A030 | 1 | F | 6.1.0 | R1997 | Mapping of BVCI and cell identifier |
298A606
| agreed | | |
98-0663
| approved | | SMG2-WPA | 6.2.0 | GPRS |
|
|
| 08.18 | A026 | - | F | 6.1.0 | R1997 | Clarification of BVC measurements |
298A568
| agreed | | |
98-0663
| approved | | SMG2-WPA | 6.2.0 | GPRS |
|
|
| 08.18 | A025 | 2 | F | 6.1.0 | R1997 | Add a new IE in FLUSH-LL-ACK-PDU and LLS-DISCARD PDU |
298A622
| agreed | | |
98-0663
| approved | | SMG2-WPA | 6.2.0 | GPRS |
|
|
| 08.18 | A024 | - | F | 6.1.0 | R1997 | Correction of the leaky bucket algorithm |
298A524
| agreed | | |
98-0663
| approved | | SMG2-WPA | 6.2.0 | GPRS |
|
|
| 08.18 | A023 | - | F | 6.1.0 | R1997 | Addition of IMSI to RA-CAPABILITY-UPDATE-ACK |
298A497
| agreed | | |
98-0663
| approved | | SMG2-WPA | 6.2.0 | GPRS |
|
|
| 08.18 | A022 | 1 | F | 6.1.0 | R1997 | Correction to scope of NSEI |
298A601
| agreed | | |
98-0663
| approved | | SMG2-WPA | 6.2.0 | GPRS |
|
|
| 08.18 | A020 | 2 | F | 6.0.0 | R1997 | GPRS radio Classmark |
231/98
| agreed | | |
98-0341
| approved | | SMG2 WPA | 6.1.0 | GPRS |
|
|
| 08.18 | A019 | - | F | 6.0.0 | R1997 | RAC is added to Cell Identity IE |
165/98
| agreed | | |
98-0310
| approved | | SMG2 WPA | 6.1.0 | GPRS |
|
|
| 08.18 | A018 | - | F | 6.0.0 | R1997 | Suppression of not used cause |
165/98
| agreed | | |
98-0310
| approved | | SMG2 WPA | 6.1.0 | GPRS |
|
|
| 08.18 | A012 | 3 | F | 6.0.0 | R1997 | BSSGP Flow Control on the Gb Interface |
165/98
| agreed | | |
98-0310
| approved | | SMG2 WPA | 6.1.0 | GPRS |
|
|
| 08.18 | A012 | 2 | F | 6.0.0 | R1997 | BSSGP Flow Control on the Gb Interface |
159/98
| agreed | | |
98-0310
| | | SMG2 WPA | | GPRS |
|
|
| 08.18 | A011 | 2 | F | 6.0.0 | R1997 | Alignment w/ GSM 03.60 (A051r3) on the Suspend/Resume functionality. |
165/98
| agreed | | |
98-0310
| approved | | SMG2 WPA | 6.1.0 | GPRS |
|
|
| 08.18 | A010 | - | F | 6.0.0 | R1997 | Modification of PAGING PS and PAGING CS messages |
159/98
| agreed | | |
98-0310
| approved | | SMG2 WPA | 6.1.0 | GPRS |
|
|
| 08.18 | A009 | 2 | F | 6.0.0 | R1997 | General clean-up of GSM 08.18 |
165/98
| agreed | | |
98-0310
| approved | | SMG2 WPA | 6.1.0 | GPRS |
|
|
| 08.18 | A008 | 3 | B | | R1997 | Flow Control on BSSGP Interface |
24/98
| agreed | | |
98-0110
| approved | | SMG2 WPA | 6.0.0 | GPRS |
|
|
| 08.18 | A007 | 5 | B | 6.0.0 | R1997 | Flush Procedure |
159/98
| agreed | | |
98-0310
| approved | | SMG2 WPA | 6.1.0 | GPRS |
|
|
| 08.18 | A006 | - | C | | R1997 | DRX Parameters IE in downlink PDU |
24/98
| agreed | | |
98-0110
| approved | | SMG2 WPA | 6.0.0 | GPRS |
|
|
| 08.18 | A005 | 2 | C | | R1997 | GPRS Paging with P-TMSI instead of TLLI |
24/98
| agreed | | |
98-0110
| approved | | SMG2 WPA | 6.0.0 | GPRS |
|
|
| 08.18 | A004 | - | F | | R1997 | Alignment Octet IE |
24/98
| agreed | | |
98-0110
| approved | | SMG2 WPA | 6.0.0 | GPRS |
|
|
| 08.18 | A003 | - | F | | R1997 | Inclusion of a PDU In Error IE in the STATUS PDU |
24/98
| agreed | | |
98-0110
| approved | | SMG2 WPA | 6.0.0 | GPRS |
|
|
| 08.18 | A002 | - | F | | R1997 | QoS Profile IE in RADIO STATUS PDU |
24/98
| agreed | | |
98-0110
| approved | | SMG2 WPA | 6.0.0 | GPRS |
|
|
| 08.18 | A001 | 3 | B | 6.0.0 | R1997 | Independent configuration of NS’VCs and BVCIs |
159/98
| agreed | | |
98-0310
| approved | | SMG2 WPA | 6.1.0 | GPRS |
|
|
| 08.18 | 0000 | - | F | | R1997 | BSS GPRS Protocol (BSSGP) |
395/97
| agreed | | |
97-945
| approved | | SMG2 WPA | | GPRS |
|