• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 51 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 09.78A0762A7.0.0R1998Clarification of encoding of CollectedDigits Details N2-000227 agreedCN2-3GPPCN4-#11 Details NP-000242 approved N27.1.0
See details 09.78A0752F6.4.0R1997Clarification of encoding of CollectedDigits Details N2-000226 agreedCN2-3GPPCN4-#11 Details NP-000242 approved N26.5.0
See details 09.78A073-F5.6.0R1996Interworking with Q.1218 and ETSI Core INAP Details N2-99640  CN2-#4 + SMG3 WPC Details P-99-453 approved SMG35.7.0
See details 09.78A0721F6.3.0R1997Interworking with Q.1218 and ETSI Core INAP Details N2-99639  CN2-#4 + SMG3 WPC Details P-99-454 approved SMG36.4.0
See details 09.78A0701F6.3.0R1997MSC address in the InitialDP operation Details N2-99647    Details P-99-454 approved SMG36.4.0
See details 09.78A0681F6.3.0R1997Notification of call forwarding to the gsmSCF Details N2-99593  CN2-#4 + SMG3 WPC Details P-99-454 approved SMG36.4.0
See details 09.78A066-F6.3.0R1997Imports from MAP Details N2-99521  CN2-#4 + SMG3 WPC Details P-99-463 approved SMG36.4.0
See details 09.78A065-D6.3.0R1997Removal of redundant reference Details N2-99334    Details P-99-454 approved SMG36.4.0
See details 09.78A0641C6.3.0R1997Support of ANSI MTP and ANSI SCCP for CAMEL phase 2 Details N2-99336    Details P-99-460 approved SMG36.4.0
See details 09.78A0583F6.3.0R1997Various corrections Details N2-99344    Details P-99-454 approved SMG36.4.0
See details 09.78A057-F6.3.0R1997Inclusion of Activity Test IF between gsmSCF & gsmSRF and gsmSCF and assistSSF Details 3C99-481    Details P-99-454 approved SMG36.4.0
See details 09.78A055-F6.3.0R1997Corrections Details 3C99-407    Details P-99-454 approved SMG36.4.0
See details 09.78A052-F R1997Syntactical and editorial corrections to 09.78 Details 3P99-023    Details P-99-192 approved SMG36.3.0
See details 09.78A0512D R1997CAMEL2 clarifications to a charging issue (FCI) Details 3P99-023    Details P-99-192 approved SMG36.3.0
See details 09.78A0491B6.2.0R1997Addition of North American Carrier related Information to CAMEL Phase 2    Details P-99-245 approved T1P16.3.0
See details 09.78A0472F R1997CAP message segmentation for CAMEL phase2 Details 3P99-023    Details P-99-192 approved SMG36.3.0
See details 09.78A0461F R1997Use of ‘DP-Busy’ for ‘Not Reachable’ in EventReportBCSM Details 3P99-023    Details P-99-192 approved SMG36.3.0
See details 09.78A0423F6.3.0R1997SCCP Details N2-99239  CN2-#2 + SMG3 WPC Details P-99-454 approved SMG36.4.0
See details 09.78A0391F R1997Clarification of CallInformationRequest/Report operation Details 3P99-023    Details P-99-192 approved SMG36.3.0
See details 09.78A0381F R1997Missing error on UnknownLegID in 09.78 Details 3P99-023    Details P-99-192 approved SMG36.3.0
See details 09.78A0331F6.1.0R1997Support of CAMEL Phase 2 Details 98p186    Details 98-0724 approved SMG36.2.0
See details 09.78A0312F6.1.0R1997Corrections on GSM 09.78 Details 98p206    Details 98-0724 approved SMG36.2.0
See details 09.78A0291C6.0.0R1997GSM Forwarding Pending Indication in IDP Operation Details 98P127 agreed  Details 98-0411 approved SMG36.1.0
See details 09.78A0281D6.0.0R1997AC negotiation on the gsmSSF - gsmSCF interface Details 98P135 agreed  Details 98-0411 approved SMG36.1.0
See details 09.78A0271D6.0.0R1997CAMEL Phase 2 Stage 3 Details 98P135 agreed  Details 98-0411 approved SMG36.1.0
See details 09.78A026-A6.0.0R1997Encoding of TC User Information parameter Details 98P134 agreed  Details 98-0404 approved SMG36.1.0
See details 09.78A0251F5.4.0R1996Encoding of TC User Information parameter Details 98P134 agreed  Details 98-0404 approved SMG35.5.0
See details 09.78A0241C6.0.0R1997TCAP Basic End Details 98P135 agreed  Details 98-0411 approved SMG36.1.0
See details 09.78A0231F5.3.0R1996Definition of CAP SSN replaced by a reference to GSM 03.03 Details 98c137 agreed  Details 98-0087 approved SMG3 WPC5.4.0
See details 09.78A022-F5.2.0R1996Remove mapping of CalledPartyBCD number and order sequence in ASN.1 Details 97C733 agreed  Details 97-915 approved SMG3 WPC5.3.0
See details 09.78A021-F5.2.0R1996Update the SCCP class requirements in 09.78 Details 97C667 agreed  Details 97-915 approved SMG3 WPC5.3.0
See details 09.78A020-F5.2.0R1996Removal of the transparent mode monitoring Details 97C634 agreed  Details 97-915 approved SMG3 WPC5.3.0
See details 09.78A019-F5.2.0R1996Removal of CallingPartyNumber from Connect Details 97C638 agreed  Details 97-915 approved SMG3 WPC5.3.0
See details 09.78A018-F5.1.0R1996Alignment with stage 2 Details 97C304 agreed  Details 97-688 approved SMG3 WPC5.2.0
See details 09.78A016-D5.1.0R1996Removal of the informative Annex B Details 97C512 agreed  Details 97-688 approved SMG3 WPC5.2.0
See details 09.78A015-F5.1.0R1996Called Party BCD number with initial DP operation Details 97C478 agreed  Details 97-688 approved SMG3 WPC5.2.0
See details 09.78A0145B R1997CAMEL phase 2 Details 98c169 agreed  Details 98-0083 approved SMG3 WPC6.0.0
See details 09.78A0131D5.1.0R1996Modifications resulting from comments by SPS3 Details 97C490 agreed  Details 97-688 approved SMG3 WPC5.2.0
See details 09.78A011-C5.0.0R1996Change to CAMEL phase 1 regarding * and # in Called Party Number Details 97C271 agreed  Details 303/97 approved SMG3 WPC5.1.0
See details 09.78A010-D5.0.0R1996SCCP addressing for CAP Details 97C158 agreed  Details 374/97 approved SMG3 WPC5.1.0
See details 09.78A0091F5.0.0R1996Alignment of text in two sections Details 97C263 agreed  Details 374/97 approved SMG3 WPC5.1.0
See details 09.78A008-C5.0.0R1996Mapping of CAP Generic Number to ISUP. Details 97C190 agreed  Details 374/97 approved SMG3 WPC5.1.0
See details 09.78A007-F5.0.0R1996Range constants for address strings Details 97C228 agreed  Details 374/97 approved SMG3 WPC5.1.0
See details 09.78A006-F5.0.0R1996Correction of references Details 97C226 agreed  Details 374/97 approved SMG3 WPC5.1.0
See details 09.78A005-F5.0.0R1996Use of SSN for inter-plmn signalling Details 97C225 agreed  Details 374/97 approved SMG3 WPC5.1.0
See details 09.78A0041F5.0.0R1996Coding of ISUP_ACM message Details 97C236 agreed  Details 374/97 approved SMG3 WPC5.1.0
See details 09.78A003-C5.0.0R1996MSC Id for Call Reference Number Details 97C220 agreed  Details 374/97 approved SMG3 WPC5.1.0
See details 09.78A0021F5.0.0R1996Description of Connect message Details 97C140 agreed  Details 374/97 approved SMG3 WPC5.1.0
See details 09.78A0011C5.0.0R1996CallingPartyNumber in Connect Details 97C161 agreed  Details 374/97 approved SMG3 WPC5.1.0
See details 09.78A001-C5.0.0R1996Introduction of SSN prior used in MAP withdrawn    SMG3 WPC 
See details 09.780000-F R1996CAMEL Application Part phase1 (stage 3), Annex B only electronic format Details 97P125 agreed  Details 049/97 approved SMG3 WPC5.0.0