• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 34 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
23.07900861 Rel-10Enhanced Optimal Routeing for Late Call ForwardingC4-103149withdrawn-  
23.0790086- Rel-10Enhanced Optimal Routeing for Late Call ForwardingC4-102991revised-  
23.0790085-6.1.0Rel-7Mobile Termination whilst the MS is moving to another MSCC4-070389agreedCP-070328approved7.0.0
23.079008426.1.0Rel-7MT to MS moving to another MSCC4-070333postponed-  
23.079008416.1.0Rel-7MT to MS moving to another MSCC4-070213revised-  
23.0790084-6.1.0Rel-7MT to MS moving to another MSCC4-070104revised-  
23.079008326.0.0Rel-6Clarification of the relationship between SOR and CAMELC4-051735agreedCP-050606approved6.1.0
23.079008225.5.0Rel-5Clarification of the relationship between SOR and CAMELC4-051734agreedCP-050606approved5.6.0
23.0790080-5.4.0Rel-5Enhancement to Route_Permitted procedure to handle Short/ Long FTNsN4-040588agreedNP-040217approved5.5.0
23.0790027-5.3.0Rel-5Correction to MAP RCH – GMSC shall check Offered CAMEL4 CSIsN4-031306agreedNP-030503approved5.4.0
23.079002615.2.0Rel-5Notification of the 2nd BSG in case of Late CF with ORN4-031055agreedNP-030387approved5.3.0
23.079002545.2.0Rel-5Correction to interaction between ORLCF and forwardingN4-030978agreedNP-030385approved5.3.0
23.079002515.2.0Rel-5Correction to interaction between ORLCF and forwarding notificationNP-030261 NP-030061rejected 
23.079002415.1.0Rel-5Correction to figrue 7a (handling of RCH in GMSC)N4-021293agreedNP-020575approved5.2.0
23.079002314.1.0Rel-4Correction to figrue 7a (handling of RCH in GMSC)N4-021292agreedNP-020575approved4.2.0
23.079002213.7.0R1999Correction to figrue 7a (handling of RCH in GMSC)N4-021291agreedNP-020575approved3.8.0
23.079002015.1.0Rel-5Optimal routeing and CAMEL discrepancyN4-021297agreedNP-020596approved5.2.0
23.0790019-5.0.0Rel-5Clarifications to Resume Call HandlingN4-020660agreedNP-020258approved5.1.0
23.0790018-4.0.0Rel-4Clarifications to Resume Call HandlingN4-020659agreedNP-020258approved4.1.0
23.0790017-3.6.0R1999Clarifications to Resume Call HandlingN4-020658agreedNP-020258approved3.7.0
23.079001623.6.0Rel-4Introduction of CAMEL support for ORN4-001109agreedNP-000648postponed 
23.0790016-4.0.0Rel-5Introduction of CAMEL Phase 4N4-020008agreedNP-020063approved5.0.0
23.0790015-3.5.0R1999Sheet 1 of Procedure OR_HLR_CFN4-000568agreedNP-000499approved3.6.0
23.0790014-3.4.0R1999Indication in PRN of support of Long FTNsN4-000040 NP-000291approved3.5.0
23.0790012-3.0.0R1999Notification of call forwarding to the gsmSCF-agreedN2-99591approved3.1.0
23.0790011-3.3.0R1999Indication of OR capability of the GMSC to the destination MSC/VLRN2B000173 NP-000079approved3.4.0
23.079001013.3.0R1999Updating references to point to 3G specificationsN2B000359 NP-000079approved3.4.0
23.0790009-3.3.0R1999Correction of CF notificationN2B000169 NP-000065approved3.4.0
23.0790008-3.2.0R1999Introduction of CAMEL Phase 3N2-99L05 NP-99490approved3.3.0
23.0790007-3.1.0R1999Handling of Release during forwarding interrogation of theN2-99D37agreedNP-99303approved3.2.0
23.0790006-3.1.0R1999Notification of CF to gsmSCF before activation of CF process Forwarding processN2-99D03agreedNP-99298approved3.2.0
23.079000513.1.0R1999Separation of success & failure cases for OR of late call forwardingN2-99C60agreedNP-99308approved3.2.0
23.0790003-3.1.0R1999Removal of TDP-Criteria from RCHN2-99B30agreedNP-99298approved3.2.0
23.0790001-3.1.0R1999OR Capability IE in PRNN2-99950agreedNP-99307approved3.2.0