• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 34 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 23.07900861C Rel-10Enhanced Optimal Routeing for Late Call Forwarding Details C4-103149 withdrawnCT4#51ZTE, China Mobile   C4 TEI10
See details 23.0790086-C Rel-10Enhanced Optimal Routeing for Late Call Forwarding Details C4-102991 revisedCT4#51ZTE, China Mobile   C4 TEI10
See details 23.0790085-B6.1.0Rel-7Mobile Termination whilst the MS is moving to another MSC Details C4-070389 agreedCT4#34-bis Details CP-070328 approvedCT#36Alcatel-Lucent7.0.0MTmovMS
See details 23.07900842F6.1.0Rel-7MT to MS moving to another MSC Details C4-070333 postponedCT4#34   C4 TEI7
See details 23.07900841F6.1.0Rel-7MT to MS moving to another MSC Details C4-070213 revisedCT4#34   C4 TEI7
See details 23.0790084-F6.1.0Rel-7MT to MS moving to another MSC Details C4-070104 revisedCT4#34   C4 TEI7
See details 23.07900832A6.0.0Rel-6Clarification of the relationship between SOR and CAMEL Details C4-051735 agreedCT4#29 Details CP-050606 approvedCT#30C46.1.0TEI5
See details 23.07900822F5.5.0Rel-5Clarification of the relationship between SOR and CAMEL Details C4-051734 agreedCT4#29 Details CP-050606 approvedCT#30C45.6.0TEI5
See details 23.0790080-F5.4.0Rel-5Enhancement to Route_Permitted procedure to handle Short/ Long FTNs Details N4-040588 agreedCN4#23 Details NP-040217 approvedCN#24N45.5.0CAMEL4
See details 23.0790027-F5.3.0Rel-5Correction to MAP RCH – GMSC shall check Offered CAMEL4 CSIs Details N4-031306 agreedCN4#21 Details NP-030503 approvedCN#22N45.4.0CAMEL4
See details 23.07900261F5.2.0Rel-5Notification of the 2nd BSG in case of Late CF with OR Details N4-031055 agreedCN4#20 Details NP-030387 approvedCN#21N45.3.0SCUDIF
See details 23.07900254F5.2.0Rel-5Correction to interaction between ORLCF and forwarding Details N4-030978 agreedCN4#20 Details NP-030385 approvedCN#21N45.3.0CAMEL4
See details 23.07900251F5.2.0Rel-5Correction to interaction between ORLCF and forwarding notification Details NP-030261  CN#20 Details NP-030061 rejectedCN#19Ericsson L CAMEL4
See details 23.07900241A5.1.0Rel-5Correction to figrue 7a (handling of RCH in GMSC) Details N4-021293 agreedCN4-#16 Details NP-020575 approved N45.2.0CAMEL3
See details 23.07900231A4.1.0Rel-4Correction to figrue 7a (handling of RCH in GMSC) Details N4-021292 agreedCN4-#16 Details NP-020575 approved N44.2.0CAMEL3
See details 23.07900221F3.7.0R1999Correction to figrue 7a (handling of RCH in GMSC) Details N4-021291 agreedCN4-#16 Details NP-020575 approved N43.8.0CAMEL3
See details 23.07900201F5.1.0Rel-5Optimal routeing and CAMEL discrepancy Details N4-021297 agreedCN4-#16 Details NP-020596 approved N45.2.0TEI5
See details 23.0790019-A5.0.0Rel-5Clarifications to Resume Call Handling Details N4-020660 agreedCN4-#14 Details NP-020258 approved N45.1.0TEI
See details 23.0790018-A4.0.0Rel-4Clarifications to Resume Call Handling Details N4-020659 agreedCN4-#14 Details NP-020258 approved N44.1.0TEI
See details 23.0790017-F3.6.0R1999Clarifications to Resume Call Handling Details N4-020658 agreedCN4-#14 Details NP-020258 approved N43.7.0TEI
See details 23.07900162B3.6.0Rel-4Introduction of CAMEL support for OR Details N4-001109 agreedCN4-#5 Details NP-000648 postponed N4 CAMEL4 2G
See details 23.0790016-B4.0.0Rel-5Introduction of CAMEL Phase 4 Details N4-020008 agreed  Details NP-020063 approved N45.0.0CAMEL4
See details 23.0790015-F3.5.0R1999Sheet 1 of Procedure OR_HLR_CF Details N4-000568 agreedCN4-#4 Details NP-000499 approved N43.6.0TEI
See details 23.0790014-F3.4.0R1999Indication in PRN of support of Long FTNs Details N4-000040    Details NP-000291 approved N43.5.0CF_enhancements
See details 23.0790012-A3.0.0R1999Notification of call forwarding to the gsmSCF agreed  Details N2-99591 approvedCN2-#4 + SMG3 WPCN2A3.1.0 2G
See details 23.0790011-F3.3.0R1999Indication of OR capability of the GMSC to the destination MSC/VLR Details N2B000173    Details NP-000079 approved N23.4.0TEI
See details 23.07900101D3.3.0R1999Updating references to point to 3G specifications Details N2B000359    Details NP-000079 approved N23.4.0TEI
See details 23.0790009-A3.3.0R1999Correction of CF notification Details N2B000169    Details NP-000065 approved N23.4.0CAMEL3
See details 23.0790008-C3.2.0R1999Introduction of CAMEL Phase 3 Details N2-99L05    Details NP-99490 approved N23.3.0CAMEL3
See details 23.0790007-A3.1.0R1999Handling of Release during forwarding interrogation of the Details N2-99D37 agreed Details NP-99303 approved N23.2.0
See details 23.0790006-A3.1.0R1999Notification of CF to gsmSCF before activation of CF process Forwarding process Details N2-99D03 agreed Details NP-99298 approved N23.2.0
See details 23.07900051A3.1.0R1999Separation of success & failure cases for OR of late call forwarding Details N2-99C60 agreed Details NP-99308 approved N23.2.0
See details 23.0790003-A3.1.0R1999Removal of TDP-Criteria from RCH Details N2-99B30 agreed Details NP-99298 approved N23.2.0
See details 23.0790001-A3.1.0R1999OR Capability IE in PRN Details N2-99950 agreed Details NP-99307 approved N23.2.0TEI