|
| 23.207 | 0093 | 1 | F | 10.0.0 | Rel-11 | Reference list correction to align with the corrected TS 29.212 title |
| | | - |
SP-120627
| approved | SA#57 | Allot Communica... | 11.0.0 | TEI11 |
|
|
| 23.207 | 0093 | - | F | 10.0.0 | Rel-11 | Reference list correction to align with the corrected TS 29.212 title |
| | | - |
SP-120474
| revised | SA#57 | Allot Communica... | | TEI11 |
|
|
| 23.207 | 0092 | 5 | B | 6.6.0 | Rel-7 | Rel-7 version of TS 23.207 main body |
S2-072280
| agreed | SA2#57 | Ericsson |
SP-070392
| approved | SA#36 | S2 | 7.0.0 | PCC |
|
|
| 23.207 | 0092 | 4 | B | 6.6.0 | Rel-7 | Rel-7 version of TS 23.207 main body |
S2-072080
| revised | SA2#57 | |
| | | - | | PCC |
|
|
| 23.207 | 0092 | 3 | B | 6.6.0 | Rel-7 | Rel-7 version of TS 23.207 main body |
S2-071903
| revised | SA2#57 | |
| | | - | | PCC |
|
|
| 23.207 | 0092 | 2 | B | 6.6.0 | Rel-7 | Rel-7 version of TS 23.207 main body |
S2-071494
| revised | SA2-R8 | |
| | | - | | PCC |
|
|
| 23.207 | 0092 | 1 | B | 6.6.0 | Rel-7 | Rel-7 version of TS 23.207 main body |
S2-071344
| revised | SA2-R8 | |
| | | - | | PCC |
|
|
| 23.207 | 0092 | - | B | 6.6.0 | Rel-7 | Rel-7 version of TS 23.207 main body |
S2-070181
| rejected | SA2#56 | |
| | | Ericsson | | PCC |
|
|
| 23.207 | 0091 | - | A | 6.6.0 | Rel-6 | Correction of reference to “End-to-end Quality of Service (QoS) concept and architecture” TS |
S2-052507
| rejected | SA2#49 | |
| | | OKI Electric In... | | SRSES |
|
|
| 23.207 | 0090 | - | F | 5.10.0 | Rel-5 | Correction of reference to “End-to-end Quality of Service (QoS) concept and architecture” TS |
S2-052506
| rejected | SA2#49 | |
| | | OKI Electric In... | | SRSES |
|
|
| 23.207 | 0089 | - | F | 5.9.0 | Rel-5 | Correction of reference to non-existent/obsolete document |
S2-052352
| agreed | SA2#48 | |
SP-050474
| approved | SA#29 | Motorola | 5.10.0 | |
|
|
| 23.207 | 0088 | 1 | A | 6.5.0 | Rel-6 | Correction of reference to non-existent/obsolete document |
S2-052351
| agreed | SA2#48 | |
SP-050474
| approved | SA#29 | Motorola | 6.6.0 | |
|
|
| 23.207 | 0088 | - | F | 6.5.0 | Rel-6 | Correction of reference to non-existent/obsolete document |
S2-051948
| revised | SA2#48 | |
| | | Motorola | | TEI6 |
|
|
| 23.207 | 0087 | - | F | 6.4.0 | Rel-6 | Update of binding information handling |
S2-051275
| agreed | SA2#46 | |
SP-050337
| approved | SA#28 | Siemens | 6.5.0 | |
|
|
| 23.207 | 0086 | - | B | 6.4.0 | Rel-6 | Add a definition of SLA |
S2-043528
| rejected | SA2#43 | |
| | | ZTE | | |
|
|
| 23.207 | 0085 | - | F | 6.3.0 | Rel-6 | Generation of multiple tokens |
S2-042708
| agreed | SA2#41 | |
SP-040521
| approved | SA#25 | S2 | 6.4.0 | QoS1 |
|
|
| 23.207 | 0084 | 1 | F | 6.3.0 | Rel-6 | SBLP and non-realtime PDP Contexts |
S2-042844
| agreed | SA2#41 | |
SP-040521
| approved | SA#25 | S2 | 6.4.0 | IMS2, QoS1 |
|
|
| 23.207 | 0084 | - | F | 6.3.0 | Rel-6 | SBLP and non-realtime PDP Contexts |
S2-042706
| revised | SA2#41 | |
| | | S2 | | IMS2, QoS1 |
|
|
| 23.207 | 0083 | - | B | 6.2.0 | Rel-6 | Condition for update authorization procedure |
S2-042120
| agreed | SA2#40 | |
SP-040317
| approved | SA#24 | S2 | 6.3.0 | QoS1 |
|
|
| 23.207 | 0082 | - | B | 6.2.0 | Rel-6 | for enhancement to PDF and GGSN for e2e Qos |
S2-042066
| rejected | SA2#40 | |
| | | | | QoS1 |
|
|
| 23.207 | 0081 | 1 | F | 6.2.0 | Rel-6 | Intra-domain Gq for IMS |
S2-041489
| agreed | SA2#39 | |
SP-040317
| approved | SA#24 | S2 | 6.3.0 | QoS1 |
|
|
| 23.207 | 0081 | - | F | 6.2.0 | Rel-6 | Intra-domain Gq for IMS |
S2-041374
| revised | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0080 | 2 | B | 6.2.0 | Rel-6 | General corrections |
S2-042119
| agreed | SA2#40 | |
SP-040317
| approved | SA#24 | S2 | 6.3.0 | QoS1 |
|
|
| 23.207 | 0080 | 1 | F | 6.2.0 | Rel-6 | General Corrections |
S2-041493
| revised | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0080 | - | F | 6.2.0 | Rel-6 | General Corrections |
S2-041439
| revised | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0079 | 1 | F | 6.2.0 | Rel-6 | AF capabilities |
S2-041492
| agreed | SA2#39 | |
SP-040317
| approved | SA#24 | S2 | 6.3.0 | QoS1 |
|
|
| 23.207 | 0079 | - | F | 6.2.0 | Rel-6 | AF capabilities |
S2-041438
| revised | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0078 | 2 | B | 6.2.0 | Rel-6 | New Session Verification Procedure on Gq |
S2-041491
| rejected | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0078 | 1 | B | 6.2.0 | Rel-6 | New Session Verification Procedure on Gq |
S2-041476
| revised | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0078 | - | B | 6.2.0 | Rel-6 | New Session Verification Procedure on Gq |
S2-041423
| revised | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0077 | 3 | B | 6.2.0 | Rel-6 | Authorisation Reject Procedure by the PDF |
S2-041625
| agreed | SA2#39 | |
SP-040317
| approved | SA#24 | S2 | 6.3.0 | QoS1 |
|
|
| 23.207 | 0077 | 2 | B | 6.2.0 | Rel-6 | Authorisation Reject Procedure by the PDF |
S2-041490
| revised | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0077 | 1 | B | 6.2.0 | Rel-6 | Authorisation Reject Procedure by the PDF |
S2-041475
| revised | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0077 | - | B | 6.2.0 | Rel-6 | Authorisation Reject Procedure by the PDF |
S2-041422
| revised | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0076 | - | B | 6.2.0 | Rel-6 | for introduction of an Enhancement for E2E QoS |
S2-041334
| rejected | SA2#39 | |
| | | | | QoS1 |
|
|
| 23.207 | 0075 | 1 | B | 6.1.1 | Rel-6 | Service information |
S2-040997
| agreed | SA2#38 | |
SP-040035
| approved | SA#23 | S2 | 6.2.0 | QoS1 |
|
|
| 23.207 | 0075 | - | B | 6.1.1 | Rel-6 | Service information |
S2-040801
| revised | SA2#38 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0074 | 1 | B | 6.1.1 | Rel-6 | Update of Authorization on Gq |
S2-040996
| agreed | SA2#38 | |
SP-040035
| approved | SA#23 | S2 | 6.2.0 | QoS1 |
|
|
| 23.207 | 0074 | - | B | 6.1.1 | Rel-6 | Update of Authorization on Gq |
S2-040800
| revised | SA2#38 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0073 | 1 | B | 6.1.1 | Rel-6 | SBLP implications of bundling different IMS sessions to the same PDP Context |
S2-040951
| agreed | SA2#38 | |
SP-040035
| approved | SA#23 | S2 | 6.2.0 | QoS1, IMS2 |
|
|
| 23.207 | 0073 | - | B | 6.1.1 | Rel-6 | SBLP implications of bundling different IMS sessions to the same PDP Context |
S2-040795
| revised | SA2#38 | |
| | | S2 | | QoS1, IMS2 |
|
|
| 23.207 | 0072 | 1 | F | 5.8.0 | Rel-5 | Update Authorization Procedure |
S2-040999
| agreed | SA2#38 | |
SP-040035
| approved | SA#23 | S2 | 5.9.0 | E2EQoS99 |
|
|
| 23.207 | 0072 | - | F | 5.8.0 | Rel-5 | Update Authorization Procedure |
S2-040786
| revised | SA2#38 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0071 | - | B | 6.1.0 | Rel-6 | Session description on Gq upon Authorization of QoS resources. |
S2-040308
| withdrawn | | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0070 | 1 | B | 6.1.0 | Rel-6 | Service information update in Gq |
S2-040395
| postponed | SA2#37 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0070 | - | B | 6.1.0 | Rel-6 | Service information update in Gq |
S2-040278
| revised | SA2#37 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0069 | 2 | B | 6.1.1 | Rel-6 | Mapping amendment to AF procedures |
S2-040803
| agreed | SA2#38 | |
SP-040035
| approved | SA#23 | S2 | 6.2.0 | QoS1 |
|
|
| 23.207 | 0069 | 1 | B | 6.1.0 | Rel-6 | Mapping amendment to AF procedures |
S2-040394
| revised | SA2#37 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0069 | - | B | 6.1.0 | Rel-6 | Mapping amendment to AF procedures |
S2-040277
| revised | SA2#37 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0068 | 1 | B | 6.1.1 | Rel-6 | Mapping amendment to PDF procedures |
S2-040802
| agreed | SA2#38 | |
SP-040035
| approved | SA#23 | S2 | 6.2.0 | QoS1 |
|
|
| 23.207 | 0068 | - | B | 6.1.0 | Rel-6 | Mapping amendment to PDF procedures |
S2-040276
| postponed | SA2#37 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0067 | - | F | 6.0.0 | Rel-6 | Defintion of the Application Function |
S2-034261
| agreed | SA2#36 | |
SP-030656
| approved | SA#22 | S2 | 6.1.0 | QoS1 |
|
|
| 23.207 | 0066 | 3 | B | 6.0.0 | Rel-6 | Requirements for IM CN Subsystem signalling flag |
S2-034380
| agreed | SA2#36 | |
SP-030656
| approved | SA#22 | S2 | 6.1.0 | IMS2 |
|
|
| 23.207 | 0066 | 2 | B | 6.0.0 | Rel-6 | Requirements for IM CN Subsystem signalling flag |
S2-034331
| revised | SA2#36 | |
| | | S2 | | IMS2 |
|
|
| 23.207 | 0066 | 1 | B | 6.0.0 | Rel-6 | Requirements for IM CN Subsystem signalling flag |
S2-034304
| revised | SA2#36 | |
| | | S2 | | IMS2 |
|
|
| 23.207 | 0066 | - | C | 6.0.0 | Rel-6 | Requirements for IM CN Subsystem signalling flag |
S2-034192
| revised | SA2#36 | |
| | | S2 | | IMS2 |
|
|
| 23.207 | 0065 | 2 | B | 6.0.0 | Rel-6 | Gq-related updates to the signaling flows |
S2-034339
| agreed | SA2#36 | |
SP-030656
| approved | SA#22 | S2 | 6.1.0 | QoS1 |
|
|
| 23.207 | 0065 | 1 | B | 6.0.0 | Rel-6 | Gq-related updates to the signaling flows |
S2-034263
| revised | SA2#36 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0065 | - | B | 6.0.0 | Rel-6 | Gq-related updates to the signaling flows |
S2-034084
| revised | SA2#36 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0064 | - | D | 6.0.0 | Rel-6 | Editorial corrections to 23.207 |
S2-033522
| agreed | SA2#35 | |
SP-030656
| approved | SA#22 | S2 | 6.1.0 | QoS1 |
|
|
| 23.207 | 0063 | 1 | B | 6.0.0 | Rel-6 | Procedures in the PDF |
S2-033728
| agreed | SA2#35 | |
SP-030656
| approved | SA#22 | S2 | 6.1.0 | QoS1 |
|
|
| 23.207 | 0063 | - | B | 6.0.0 | Rel-6 | Procedures in the PDF |
S2-033519
| revised | SA2#35 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0062 | 1 | B | 6.0.0 | Rel-6 | Information exchanged via Gq interface |
S2-033727
| agreed | SA2#35 | |
SP-030656
| approved | SA#22 | S2 | 6.1.0 | QoS1 |
|
|
| 23.207 | 0062 | - | B | 6.0.0 | Rel-6 | Information exchanged via Gq interface |
S2-033518
| revised | SA2#35 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0061 | 3 | B | 6.0.0 | Rel-6 | Procedures in the AF |
S2-033781
| agreed | SA2#35 | |
SP-030656
| approved | SA#22 | S2 | 6.1.0 | QoS1 |
|
|
| 23.207 | 0061 | 2 | B | 6.0.0 | Rel-6 | Procedures in the AF |
S2-033762
| revised | SA2#35 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0061 | 1 | B | 6.0.0 | Rel-6 | Procedures in the AF |
S2-033527
| revised | SA2#35 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0061 | - | B | 6.0.0 | Rel-6 | Procedures in the AF |
S2-033517
| revised | SA2#35 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0060 | 1 | B | 5.8.0 | Rel-6 | Functional additions for the Gq interface |
S2-033214
| agreed | SA2#34 | |
SP-030378
| approved | SA#21 | S2 | 6.0.0 | QoS1 |
|
|
| 23.207 | 0060 | - | B | 5.8.0 | Rel-6 | Functional additions for the Gq interface |
S2-033040
| revised | SA2#34 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0059 | - | B | 5.8.0 | Rel-6 | Updates to signaling flows for the Gq interface |
S2-032533
| rejected | SA2#33 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0058 | 1 | B | 5.8.0 | Rel-6 | Functional additions for the Gq interface |
S2-032693
| rejected | SA2#33 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0058 | - | B | 5.8.0 | Rel-6 | Functional additions for the Gq interface |
S2-032532
| revised | SA2#33 | |
| | | S2 | | QoS1 |
|
|
| 23.207 | 0057 | 1 | F | 5.7.0 | Rel-5 | Handling of IMS signalling information in QoS and PCO IEs at GGSN |
S2-031482
| agreed | SA2#31 | |
SP-030302
| approved | SA#20 | S2 | 5.8.0 | IMS-CCR |
|
|
| 23.207 | 0057 | - | F | 5.6.0 | Rel-5 | Handling of IMS signalling information in QoS and PCO IEs at GGSN |
S2-031444
| revised | SA2#31 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0056 | 1 | F | 5.6.0 | Rel-5 | Handling of IMS signalling information in QoS and PCO IEs at GGSN |
S2-030956
| rejected | SA2#30 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0056 | - | F | 5.6.0 | Rel-5 | Handling of IMS signalling information in QoS and PCO IEs at GGSN |
S2-030546
| revised | SA2#30 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0055 | - | F | 5.6.0 | Rel-5 | Removal of editors notes |
S2-030857
| agreed | SA2#30 | |
SP-030119
| approved | SA#19 | S2 | 5.7.0 | |
|
|
| 23.207 | 0054 | - | B | 5.6.0 | Rel-6 | Policy-based control of Diffserv |
S2-030261
| rejected | SA2#29 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0052 | 1 | F | 5.5.0 | Rel-5 | Definition of QoS Class |
S2-023535
| agreed | SA2-#28 | |
SP-020774
| withdrawn | SA-#18 | S2 | | |
|
|
| 23.207 | 0052 | - | F | 5.5.0 | Rel-5 | Definition of QoS Class |
S2-023307
| revised | SA2-#28 | |
| | | S2 | | |
|
|
| 23.207 | 0051 | - | F | 5.5.0 | Rel-5 | PCF to PDF Changes |
S2-023269
| agreed | SA2-#28 | |
SP-020774
| approved | SA-#18 | S2 | 5.6.0 | IMS-CCR |
|
|
| 23.207 | 0050 | - | F | 5.5.0 | Rel-5 | Clarification of Diffserv functions in 23.207 without Go control |
S2-023063
| agreed | SA2-#27 | |
SP-020774
| withdrawn | SA-#18 | S2 | | |
|
|
| 23.207 | 0049 | 1 | F | 5.5.0 | Rel-5 | Mobile IP and Service Based Local Policy interactions |
S2-023066
| rejected | SA2-#27 | |
| | | S2 | | |
|
|
| 23.207 | 0049 | - | F | 5.5.0 | Rel-5 | Mobile IP and Service Based Local Policy interactions |
S2-023538
| agreed | SA2-#28 | |
SP-020774
| approved | SA-#18 | S2 | 5.6.0 | |
|
|
| 23.207 | 0049 | - | F | 5.5.0 | Rel-5 | Mobile IP and Service Based Local Policy interactions |
S2-023285
| revised | SA2-#28 | |
| | | S2 | | |
|
|
| 23.207 | 0048 | - | F | 5.5.0 | Rel-5 | Consistency of stage 2 - RSVP proxy |
S2-023065
| agreed | SA2-#27 | |
SP-020774
| approved | SA-#18 | S2 | 5.6.0 | |
|
|
| 23.207 | 0048 | - | F | 5.5.0 | Rel-5 | Consistency of stage 2 - RSVP proxy |
S2-022886
| revised | SA2-#27 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0047 | - | F | 5.5.0 | Rel-5 | Clarification on authorization token for SDPless session |
S2-022708
| rejected | SA2-#27 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0046 | 1 | F | 5.5.0 | Rel-5 | Clarifications on Go interface |
S2-023060
| agreed | SA2-#27 | |
SP-020774
| approved | SA-#18 | S2 | 5.6.0 | IMS-CCR |
|
|
| 23.207 | 0046 | - | F | 5.5.0 | Rel-5 | Clarifications on Go interface |
S2-022707
| revised | SA2-#27 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0045 | - | F | 5.4.0 | Rel-5 | Alignment with stage 3- RSVP |
S2-022293
| agreed | SA2-#26 | |
SP-020532
| approved | SA-#17 | S2 | 5.5.0 | E2EQoS99 |
|
|
| 23.207 | 0044 | 4 | F | 5.5.0 | Rel-5 | Alignment with stage 3 - DS control over Go |
| | | |
SP-020819
| approved | SA-#18 | S2 | 5.6.0 | |
|
|
| 23.207 | 0044 | 3 | F | 5.5.0 | Rel-5 | Alignment with stage 3 - DS control over Go |
S2-023064
| agreed | SA2-#27 | |
SP-020774
| revised | SA-#18 | S2 | | |
|
|
| 23.207 | 0044 | 2 | F | 5.5.0 | Rel-5 | Alignment with stage 3 - DS control over Go |
S2-022873
| revised | SA2-#27 | |
| | | S2 | | |
|
|
| 23.207 | 0044 | 1 | F | 5.4.0 | Rel-5 | Alignment with stage 3 - DS control over Go |
S2-022576
| rejected | SA2-#26 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0044 | - | F | 5.4.0 | Rel-5 | Alignment with stage 3 - DS control over Go |
S2-022292
| revised | SA2-#26 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0043 | 1 | F | 5.4.0 | Rel-5 | Alignment with stage 3 |
S2-022504
| agreed | SA2-#26 | |
SP-020532
| approved | SA-#17 | S2 | 5.5.0 | E2EQoS99 |
|
|
| 23.207 | 0043 | - | F | 5.4.0 | Rel-5 | Alignment with stage 3 - editorial improvements |
S2-022291
| revised | SA2-#26 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0042 | - | D | 5.4.0 | Rel-5 | 23207 changes for Access Independence |
S2-022283
| rejected | SA2-#26 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0041 | 1 | F | 5.4.0 | Rel-5 | Revoke authorization of GPRS and IP resources |
S2-022503
| withdrawn | | |
| | | S2 | | |
|
|
| 23.207 | 0041 | - | F | 5.4.0 | Rel-5 | Revoke authorization of GPRS and IP resources |
S2-022111
| revised | SA2-#26 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0040 | 4 | F | 5.4.0 | Rel-5 | Source IP address filtering for Service Based Local Policy |
S2-022620
| agreed | SA2-#26 | |
SP-020532
| approved | SA-#17 | S2 | 5.5.0 | E2EQoS99 |
|
|
| 23.207 | 0040 | 3 | F | 5.4.0 | Rel-5 | Source IP address filtering for Service Based Local Policy |
S2-022579
| revised | SA2-#26 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0040 | 2 | F | 5.4.0 | Rel-5 | Source IP address filtering for Service Based Local Policy |
S2-022571
| revised | SA2-#26 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0040 | 1 | F | 5.4.0 | Rel-5 | Source IP address filtering for Service Based Local Policy |
S2-022007
| postponed | SA2-#25 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0040 | - | F | 5.4.0 | Rel-5 | Source IP address filtering for Service Based Local Policy |
S2-021959
| revised | SA2-#25 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0039 | 1 | F | 5.4.0 | Rel-5 | Policy control procedures on PDP context modification |
S2-021948
| agreed | SA2-#25 | |
SP-020532
| approved | SA-#17 | S2 | 5.5.0 | E2EQoS99 |
|
|
| 23.207 | 0039 | - | F | 5.4.0 | Rel-5 | Policy control procedures on PDP context modification |
S2-021731
| revised | SA2-#25 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0038 | - | F | 5.4.0 | Rel-5 | Alignment with stage 3 |
S2-021711
| rejected | SA2-#25 | |
| | | S2 | | |
|
|
| 23.207 | 0037 | 2 | F | 5.4.0 | Rel-5 | SBLP Handling and TFT Processing |
S2-022001
| agreed | SA2-#25 | |
SP-020532
| approved | SA-#17 | S2 | 5.5.0 | |
|
|
| 23.207 | 0037 | 1 | F | 5.4.0 | Rel-5 | SBLP Handling and TFT Processing |
S2-021946
| revised | SA2-#25 | |
| | | S2 | | |
|
|
| 23.207 | 0037 | - | F | 5.4.0 | Rel-5 | SBLP Handling and TFT Processing |
S2-021710
| revised | SA2-#25 | |
| | | S2 | | |
|
|
| 23.207 | 0036 | 1 | F | 5.4.0 | Rel-5 | Modification of IMS Signalling PDP context |
S2-022542
| agreed | SA2-#26 | |
SP-020532
| approved | SA-#17 | S2 | 5.5.0 | IMS-CCR |
|
|
| 23.207 | 0036 | - | F | 5.4.0 | Rel-5 | Modification of IMS signalling PDP context |
S2-021682
| postponed | SA2-#25 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0035 | - | F | 5.4.0 | Rel-5 | IP address identification for SBLP use for Release 5 |
S2-021658
| revised | SA2-#25 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0034 | 3 | F | 5.3.0 | Rel-5 | Number of media components per PDP Context |
S2-0215163
| agreed | | |
SP-020315
| approved | SA-#16 | S2 | 5.4.0 | E2EQoS99 |
|
|
| 23.207 | 0034 | - | F | 5.3.0 | Rel-5 | Number of media components per PDP Context |
S2-021505
| revised | SA2-#24 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0033 | - | F | 5.3.0 | Rel-5 | Support of RTCP |
S2-021437
| rejected | SA2-#24 | |
| | | S2 | | IMS |
|
|
| 23.207 | 0032 | - | F | 5.3.0 | Rel-5 | Incorrect Place of the RAB Procedures in Fig. 7 of Section 6.3.2 |
S2-021256
| withdrawn | SA2-#24 | |
| | | S2 | | |
|
|
| 23.207 | 0031 | - | F | 5.3.0 | Rel-5 | Removal of an event for the indication of PDP context modification procedure |
S2-021255
| rejected | SA2-#24 | |
| | | S2 | | |
|
|
| 23.207 | 0030 | - | F | 5.3.0 | Rel-5 | Correct miss-match between figure and explanatory texts |
S2-021140
| agreed | SA2-#24 | |
SP-020315
| approved | SA-#16 | S2 | 5.4.0 | |
|
|
| 23.207 | 0029 | - | F | 5.3.0 | Rel-5 | Number of media components per PDP Context |
S2-021121
| rejected | SA2-#24 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0028 | 2 | F | 5.3.0 | Rel-5 | Alignment of TS 23.207 |
S2-0213691
| agreed | | |
SP-020315
| approved | SA-#16 | S2 | 5.4.0 | E2EQoS99 |
|
|
| 23.207 | 0028 | - | F | 5.3.0 | Rel-5 | Alignment of TS 23.207 |
S2-021118
| revised | SA2-#24 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0027 | 1 | F | 5.3.0 | Rel-5 | Clarifications to TS 23.207 |
S2-021368
| agreed | SA2-#24 | |
SP-020315
| approved | SA-#16 | S2 | 5.4.0 | E2EQoS99 |
|
|
| 23.207 | 0027 | - | D | 5.3.0 | Rel-5 | Clarifications to TS 23.207 |
S2-021117
| revised | SA2-#24 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0026 | - | B | 5.3.0 | Rel-5 | Speed up PDP context Activation procedure |
S2-021063
| rejected | SA2-#24 | |
| | | S2 | | TEI5 |
|
|
| 23.207 | 0025 | - | F | 5.2.0 | Rel-5 | Correction of references to obsolete SIP RFC 2543 IETF Specification |
| | | |
SP-020153
| approved | SA-#15 | DynamicsSoft | 5.3.0 | IMS-CCR |
|
|
| 23.207 | 0024 | - | B | 5.2.0 | Rel-5 | UMTS QoS to Diffserv Mapping for Gi interface interworking |
S2-020788
| withdrawn | | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0023 | 1 | F | 5.2.0 | Rel-5 | Corrections in 6.3 Session Flow: QoS Interaction Procedures |
S2-020783
| agreed | SA2-#23 | |
SP-020134
| approved | SA-#15 | S2 | 5.3.0 | IMS-CCR |
|
|
| 23.207 | 0023 | - | F | 5.2.0 | Rel-5 | Corrections in 6.3 Session Flow: QoS Interaction Procedures |
S2-020588
| revised | SA2-#23 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0022 | 1 | F | 5.2.0 | Rel-5 | Corrections of the Indication of PDP Context Release Procedure |
S2-020782
| agreed | SA2-#23 | |
SP-020134
| approved | SA-#15 | S2 | 5.3.0 | IMS-CCR |
|
|
| 23.207 | 0022 | - | F | 5.2.0 | Rel-5 | Corrections of the Indication of PDP Context Release Procedure |
S2-020587
| revised | SA2-#23 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0021 | 1 | D | 5.2.0 | Rel-5 | Editorial Corrections of QoS Interaction Procedures Flows |
S2-020781
| agreed | SA2-#23 | |
SP-020134
| approved | SA-#15 | S2 | 5.3.0 | IMS-CCR |
|
|
| 23.207 | 0021 | - | E | 5.2.0 | Rel-5 | Editorial Corrections of QoS Interaction Procedures Flows |
S2-020586
| revised | SA2-#23 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0020 | - | F | 5.2.0 | Rel-5 | Incorrect Place of the RAB Procedures in Section 6.3.2 |
S2-020585
| agreed | SA2-#23 | |
SP-020134
| approved | SA-#15 | S2 | 5.3.0 | IMS-CCR |
|
|
| 23.207 | 0019 | 1 | B | 5.2.0 | Rel-5 | Number of media components per PDP Context |
S2-020797
| revised | SA2-#23 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0019 | - | B | 5.2.0 | Rel-5 | Number of media components per PDP Context |
S2-020852
| agreed | SA2-#23 | |
SP-020134
| approved | SA-#15 | S2 | 5.3.0 | E2EQoS99 |
|
|
| 23.207 | 0019 | - | B | 5.2.0 | Rel-5 | Number of media components per PDP Context |
S2-020491
| revised | SA2-#23 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0018 | - | B | 5.2.0 | Rel-5 | Requirement for feedback on binding information |
S2-020482
| revised | SA2-#23 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0017 | 1 | F | 5.2.0 | Rel-5 | Authorization of QoS Resources |
S2-020786
| agreed | SA2-#23 | |
SP-020134
| approved | SA-#15 | S2 | 5.3.0 | IMS-CCR |
|
|
| 23.207 | 0017 | - | F | 5.2.0 | Rel-5 | Authorization of QoS Resources |
S2-020443
| revised | SA2-#23 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0016 | - | F | 5.2.0 | Rel-5 | Deleting references to PDP Configuration Options |
S2-020117
| revised | SA2-#22 | |
| | | S2 | | TEI5 |
|
|
| 23.207 | 0015 | - | F | 5.2.0 | Rel-5 | IMS enhancements (Transfering Binding Information) |
S2-020057
| rejected | SA2-#22 | |
| | | S2 | | IMS |
|
|
| 23.207 | 0014 | 1 | F | 5.2.0 | Rel-5 | Removal of packet handling action from PCF decision |
S2-020265
| agreed | SA2-#22 | |
SP-020134
| approved | SA-#15 | S2 | 5.3.0 | E2EQoS99 |
|
|
| 23.207 | 0014 | - | F | 5.2.0 | Rel-5 | Removal of packet handling action from PCF decision |
S2-020017
| revised | SA2-#22 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0013 | 1 | C | 5.1.0 | Rel-5 | New event for P-CSCF notification of PDP context modification |
S2-013513
| agreed | SA2-#21 | |
SP-010711
| approved | SA-#14 | S2 | 5.2.0 | IMS-CCR |
|
|
| 23.207 | 0013 | - | C | | Rel-5 | New event for P-CSCF notification of PDP context modification |
S2-013423
| revised | SA2-#21 | |
| | | S2 | | IMS-CCR |
|
|
| 23.207 | 0012 | - | F | 5.1.0 | Rel-5 | Mapping IP flow based policy information into PDP context based policy information in the GGSN |
S2-013511
| agreed | SA2-#21 | |
SP-010711
| approved | SA-#14 | S2 | 5.2.0 | E2EQoS99 |
|
|
| 23.207 | 0012 | - | F | 5.1.0 | Rel-5 | Mapping IP flow based policy information into PDP context based policy information in the GGSN |
S2-013340
| revised | SA2-#21 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0011 | 1 | C | | Rel-5 | PCF decision regarding Authorize QoS |
S2-013588
| rejected | SA2-#21 | |
| | | S2 | | |
|
|
| 23.207 | 0011 | - | F | | Rel-5 | PCF decision regarding Authorize QoS |
S2-013339
| rejected | SA2-#21 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0010 | - | B | 5.1.0 | Rel-5 | COPS Usage for Go Interface |
S2-012883
| agreed | SA2-#20 | |
SP-010711
| approved | SA-#14 | S2 | 5.2.0 | E2EQoS99 |
|
|
| 23.207 | 0009 | 1 | B | 5.1.0 | Rel-5 | Session Flow: QoS Interaction Procedures |
S2-013032
| agreed | SA2-#20 | |
SP-010711
| approved | SA-#14 | S2 | 5.2.0 | IMS-CCR |
|
|
| 23.207 | 0009 | - | B | | Rel-5 | Session Flow: QoS Interaction Procedures |
S2-012882
| revised | SA2-#20 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0008 | 3 | F | 5.1.0 | Rel-5 | QoS Scenarios Considerations |
S2-0129681
| agreed | | |
SP-010711
| approved | SA-#14 | S2 | 5.2.0 | |
|
|
| 23.207 | 0008 | - | F | | Rel-5 | QoS Scenario Considerations |
S2-012858
| revised | SA2-#20 | |
| | | S2 | | E2EQoS99 |
|
|
| 23.207 | 0007 | 1 | F | | Rel-5 | PCF Location Clarification |
S2-013031
| rejected | SA2-#20 | |
| | | S2 | | QoS |
|
|
| 23.207 | 0007 | - | F | | Rel-5 | Go Reference Point Clarifications |
S2-012770
| revised | SA2-#20 | |
| | | S2 | | QoS |
|
|
| 23.207 | 0006 | 2 | C | 5.1.0 | Rel-5 | P-CSCF notification of PDP context modification |
S2-013029
| agreed | SA2-#20 | |
SP-010711
| approved | SA-#14 | S2 | 5.2.0 | IMS |
|
|
| 23.207 | 0006 | 1 | C | | Rel-5 | P-CSCF notification of PDP context modification |
S2-012602
| revised | SA2-#20 | |
| | | S2 | | IMS |
|
|
| 23.207 | 0005 | 1 | F | 5.0.0 | Rel-5 | P-CSCF and PCF Clarifications |
S2-012334
| agreed | SA2-#19 | |
SP-010513
| approved | SA-#13 | S2 | 5.1.0 | IMS-CCR |
|
|
| 23.207 | 0004 | 1 | F | 5.0.0 | Rel-5 | COPS Usage for Go Interface |
S2-012445
| agreed | SA2-#19 | |
SP-010513
| approved | SA-#13 | S2 | 5.1.0 | IMS-CCR |
|
|
| 23.207 | 0003 | 1 | F | 5.0.0 | Rel-5 | Session Flow: QoS Interaction Procedures |
S2-012444
| agreed | SA2-#19 | |
SP-010513
| approved | SA-#13 | S2 | 5.1.0 | IMS-CCR |
|
|
| 23.207 | 0003 | - | C | 5.3.0 | Rel-5 | IP Policy Control Framework and Policy - A practical approach to per-PDP policing at the GGSN |
S2-021034
| withdrawn | | |
| | | S2 | | |
|
|
| 23.207 | 0002 | - | F | 5.0.0 | Rel-5 | Token generation at the PCF |
S2-012104
| agreed | SA2-#19 | |
SP-010513
| approved | SA-#13 | S2 | 5.1.0 | QoS |
|
|
| 23.207 | 0001 | 3 | B | 5.1.0 | Rel-5 | PDP Context Used for Application Level Signalling |
S2-012600
| agreed | | |
SP-010711
| approved | SA-#14 | S2 | 5.2.0 | E2EQoS99 |
|
|
| 23.207 | 0000 | - | F | 5.3.0 | Rel-5 | Support of RTCP in IMS sessions |
S2-021171
| revised | SA2-#24 | |
| | | S2 | | |
|