• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 77 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
23.2780052110.0.0Rel-11Mapping of SIP Responses code and Camel Detection PointsC4-121663agreedCP-120467approved11.0.0
23.2780052-10.0.0Rel-11Mapping of SIP Responses code and Camel Detection PointsC4-121490revised-  
23.2780051- Rel-11MSISDN as Subscriber Identity in MAP ATSI RequestC4-112374withdrawn-  
23.2780050-7.0.0Rel-7Specification of gsmSCF Address format in AnyTime request messagesC4-060130agreedCP-060082approved7.1.0
23.2780049-6.1.0Rel-6Incorrect ReferencesC4-051465 CP-050665approved6.2.0
23.2780049-6.1.0Rel-6Incorrect ReferencesC4-051465agreedCP-050621withdrawn 
23.278004816.0.0Rel-6Removal of references to HLR for CAMEL control of IMSC4-050788agreedCP-050097approved6.1.0
23.2780047-5.5.0Rel-5Correction of Check_Criteria Procedure names referenced in Process imcnSSFN4-040939agreedNP-040397approved5.6.0
23.278004615.4.0Rel-5Correction to the definition of interfaces for the IM-SSFN2-030565agreedNP-030525approved5.5.0
23.2780046-5.4.0Rel-5Correction to the definition of interfaces for the IM-SSFN2-030534revised-  
23.278004515.3.0Rel-5Incorrect handling of failure SIP response for MON2-030443agreedNP-030374approved5.4.0
23.2780045-5.3.0Rel-5Incorrect handling of failure SIP response for MON2-030439revised-  
23.278004425.3.0Rel-5Setting of Timers not specified for IMSSF processN2-030465agreedNP-030374approved5.4.0
23.278004415.3.0Rel-5Setting of Timers not specified for IMSSF processN2-030440revised-  
23.2780044-5.3.0Rel-5Setting of Timers not specified for IMSSF processN2-030370revised-  
23.278004325.3.0Rel-5Incorrect handling of failure SIP response for MTN2-030438agreedNP-030374approved5.4.0
23.278004315.3.0Rel-5Incorrect handling of failure SIP response for MTN2-030369revised-  
23.2780043-5.2.0Rel-5Incorrect handling of failure SIP response for MTN2-030263postponed-  
23.2780042-5.2.0Rel-5Redundant check for Final_Response_Received in Disconnect procedures.N2-030262agreedNP-030191approved5.3.0
23.2780041-5.2.0Rel-5Corrections to process IM_SSFN2-030261agreedNP-030191approved5.3.0
23.278004015.2.0Rel-5Incorrect list of TDPs listed for O-IM-CSIN2-030302agreedNP-030191approved5.3.0
23.2780040-5.2.0Rel-5Incorrect list of TDPs listed for O-IM-CSIN2-030260revised-  
23.2780039-5.1.0Rel-5Inconsistency in Call Information Report in Re-Connect CaseN2-030155agreedNP-030091approved5.2.0
23.2780038-5.1.0Rel-5Clarification of the use of gsmSRF CAP operations for IM-SSFN2-030089withdrawn-  
23.2780037-5.1.0Rel-5Procedure for DisconnectForwardConnectionN2-030088withdrawn-  
23.2780036-5.1.0Rel-5Corrections in the procedures for handling failure SIP responseN2-030086agreedNP-030091approved5.2.0
23.278003515.1.0Rel-5Corrections in CAMEL_IMCN_MO_ANSWERN2-030143agreedNP-030091approved5.2.0
23.2780035-5.1.0Rel-5Corrections in CAMEL_IMCN_MO_ANSWERN2-030085revised-  
23.2780034-5.1.0Rel-5Incorrect references to MSC in the IF descriptions for IMSN2-030084withdrawn-  
23.2780033-5.1.0Rel-5Incorrect SIP response when no CAMEL is invokedN2-030083agreedNP-030091approved5.2.0
23.2780032-5.1.0Rel-5Sending of provisional response for the INVITEN2-030082agreedNP-030091approved5.2.0
23.2780031-5.1.0Rel-5Incorrect procedures called in CAMEL_IMCN_MT_ANSWERN2-030081agreedNP-030090approved5.2.0
23.2780030-5.1.0Rel-5Incorrect procedure names used for CAMEL_MT_CTR and CAMEL_MO_CTRN2-030080agreedNP-030090approved5.2.0
23.2780029-5.1.0Rel-5Correction of imcnSSF procedure namesN2-030079agreedNP-030090approved5.2.0
23.278002815.1.0Rel-5Introduction of ResetTimer input in state WFI-DS (IMS)N2-030124agreedNP-030090approved5.2.0
23.2780028-5.1.0Rel-5Introduction of ResetTimer input in state WFI-DS (IMS)N2-030060revised-  
23.278002715.1.0Rel-5Implementing of Connect to Resource handling in CAMEL for IMSN2-030150agreedNP-030090approved5.2.0
23.2780027-5.1.0Rel-5Implementing of Connect to Resource handling in CAMEL for IMSN2-030033revised-  
23.2780026-5.0.0Rel-5Correction to dialled services criteriaN2-021059agreedNP-020532approved5.1.0
23.2780025-5.0.0Rel-5Number comparison for D-CSIN2-021039agreedNP-020532approved5.1.0
23.278002425.0.0Rel-5Clarification of DP destination number trigger criteria for IMSN2-021090agreedNP-020532approved5.1.0
23.278002415.0.0Rel-5Clarification of DP destination number trigger criteria for IMSN2-021052revised-  
23.2780024-5.0.0Rel-5Clarification of DP destination number trigger criteria for IMSN2-020997revised-  
23.278002315.0.0Rel-5Stage 2 specifications for Call Gap for IMSN2-021051agreedNP-020532approved5.1.0
23.2780023-5.0.0Rel-5Stage 2 specifications for Call Gap for IMSN2-020996revised-  
23.2780022-5.0.0Rel-5SDL Procedure for Connect To ResourceN2-020987agreedNP-020532approved5.1.0
23.2780021-5.0.0Rel-5Editorial improvement - clause 7N2-020972agreedNP-020531approved5.1.0
23.2780020-5.0.0Rel-5Editorial improvement - clause 6N2-020971agreedNP-020531approved5.1.0
23.2780019-5.0.0Rel-5Editorial improvement - clause 5N2-020970agreedNP-020531approved5.1.0
23.2780018-5.0.0Rel-5Editorial improvement - clause 4N2-020969agreedNP-020531approved5.1.0
23.2780017-5.0.0Rel-5Editorial improvement - clause 3N2-020968agreedNP-020531approved5.1.0
23.2780016-5.0.0Rel-5Editorial improvement - clause 2N2-020967agreedNP-020531approved5.1.0
23.2780015-5.0.0Rel-5For better document structureN2-020966agreedNP-020531approved5.1.0
23.2780014-5.0.0Rel-5Figure and table numbersN2-020965agreedNP-020529approved5.1.0
23.2780013-5.0.0Rel-5Explanatory text to SDL architectureN2-020964withdrawn-  
23.278001215.0.0Rel-5IF Description for gsmSRF-related operations for IMSN2-021047agreedNP-020532approved5.1.0
23.2780012-5.0.0Rel-5IF Description for gsmSRF-related operations for IMSN2-020891postponed-  
23.2780011-5.0.0Rel-5SDL Procedure for Connect To ResourceN2-020870withdrawn-  
23.278001015.0.0Rel-5Correction of InitialDP MediaType parameterN2-020933agreedNP-020530approved5.1.0
23.2780010-5.0.0Rel-5Correction of InitialDP MediaType parameterN2-020868revised-  
23.2780009-5.0.0Rel-5Removal of ETC processing from IM-SSF SDL ProceduresN2-020866agreedNP-020530approved5.1.0
23.2780008-5.0.0Rel-5Remove support of SCI operation from imcnSSF SDL processN2-020865agreedNP-020530approved5.1.0
23.278000715.0.0Rel-5Inconsistent description on ACR: time informationN2-020945agreedNP-020530approved5.1.0
23.2780007-5.0.0Rel-5Inconsistent description on ACR: time informationN2-020831revised-  
23.2780006-5.0.0Rel-5Clarification in the case multiple RRBs are sent for a DPN2-020830agreedNP-020530approved5.1.0
23.2780005-5.0.0Rel-5Correction and improvement in CSI updateN2-020829agreedNP-020530approved5.1.0
23.278000435.0.0Rel-5Correction and improvement in MT proceduresN2-021091agreedNP-020532approved5.1.0
23.278000425.0.0Rel-5Correction and improvement in MT proceduresN2-021050revised-  
23.278000415.0.0Rel-5Correction and improvement in MT proceduresN2-020963revised-  
23.2780004-5.0.0Rel-5Correction and improvement in MT proceduresN2-020828revised-  
23.278000325.0.0Rel-5Correction and improvement in MO proceduresN2-021049agreedNP-020532approved5.1.0
23.278000315.0.0Rel-5Correction and improvement in MO proceduresN2-020962revised-  
23.2780003-5.0.0Rel-5Correction and improvement in MO proceduresN2-020827revised-  
23.2780002-5.0.0Rel-5Correction and improvement in the registration proceduresN2-020826agreedNP-020530approved5.1.0
23.278000125.0.0Rel-5Correction and improvement in the overall SDL architectureN2-020941agreedNP-020530approved5.1.0
23.278000115.0.0Rel-5Correction and improvement in the overall SDL architectureN2-020917revised-  
23.2780001-5.0.0Rel-5Correction and improvement in the overall SDL architectureN2-020825revised-