• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
First PagePrevious Page
Next PageLast Page
Page size:
PageSizeComboBox
select
 8564 items in 43 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 24.30140131F18.5.0Rel-18Correction to EMM cause description    Details CP-240300 approvedCT#103Ericsson, Qualc...18.6.05GS_Ph1-CT, SAES18
See details 24.3014013-F18.5.0Rel-18Correction to EMM cause description    Details CP-240238 revisedCT#103Ericsson, Qualc... 5GProtoc18, 5GS...
See details 24.30140121B18.5.0Rel-18Addition of Unavailability configuration IE in TAU accept Details C1-241749 agreedCT1#147Qualcomm Incorp... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.3014012-B18.5.0Rel-18Addition of Unavailability configuration IE in TAU accept Details C1-241316 revisedCT1#147Qualcomm Incorp...    5GSAT_Ph2
See details 24.30140113F18.5.0Rel-18Abnormal case for SDNAEPC related to DN-specific identity Details C1-241775 agreedCT1#147Nokia, Nokia Sh... Details CP-240218 approvedCT#103CT118.6.0TEI18_SDNAEPC
See details 24.30140112F18.5.0Rel-18Abnormal case for SDNAEPC related to DN-specific identity Details C1-241741 revisedCT1#147Nokia, Nokia Sh...    TEI18_SDNAEPC
See details 24.30140111F18.5.0Rel-18Abnormal case for SDNAEPC related to DN-specific identity Details C1-241264 revisedCT1#147Nokia, Nokia Sh...    TEI18_SDNAEPC
See details 24.3014011-F18.5.0Rel-18Abnormal case for SDNAEPC related to DN-specific identity Details C1-241181 revisedCT1#147Nokia, Nokia Sh...    TEI18_SDNAEPC
See details 24.3014010-F18.5.0Rel-18Update on support of discontinuous coverage for satellite access Details C1-241168 mergedCT1#147China Telecom    5GSAT_Ph2
See details 24.30140092B18.5.0Rel-18Updates for TAU needed after unavailability period duration Details C1-241768 agreedCT1#147Huawei, HiSilic... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30140091B18.5.0Rel-18Updates for TAU needed after unavailability period duration Details C1-241336 revisedCT1#147Huawei, HiSilicon    5GSAT_Ph2
See details 24.3014009-B18.5.0Rel-18Updates for TAU needed after unavailability period duration Details C1-241072 revisedCT1#147Huawei, HiSilic...    5GSAT_Ph2
See details 24.30140081F18.5.0Rel-18Moving the NAS timer handling from the general section to Extended DC section Details C1-241335 agreedCT1#147Huawei, HiSilic... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.3014008-F18.5.0Rel-18Moving the NAS timer handling from the general section to Extended DC section Details C1-241068 revisedCT1#147Huawei, HiSilic...    5GSAT_Ph2
See details 24.30140071F18.5.0Rel-18URSP provisioning in EPS and PDU session transferred from 5GS Details C1-241313 agreedCT1#147Ericsson Details CP-240108 approvedCT#103CT118.6.0eUEPO
See details 24.3014007-F18.5.0Rel-18URSP provisioning in EPS and PDU session transferred from 5GS Details C1-241067 revisedCT1#147Ericsson    eUEPO
See details 24.3014006-F18.5.0Rel-18Correction that the TAU request is from the UE Details C1-241065 agreedCT1#147Huawei, HiSilicon Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30140051F18.5.0Rel-18Corrections to the UE requested bearer resource modification procedure for URSP provisioning in EPS Details C1-241312 agreedCT1#147Intel Details CP-240108 approvedCT#103CT118.6.0eUEPO
See details 24.3014005-F18.5.0Rel-18Corrections to the UE requested bearer resource modification procedure for URSP provisioning in EPS Details C1-241052 revisedCT1#147Intel    eUEPO
See details 24.3014004-F18.5.0Rel-18Network requirements for triggering the procedure of SDNAEPC Details C1-241047 postponedCT1#147Nokia, Nokia Sh...    TEI18_SDNAEPC
See details 24.30140031F18.5.0Rel-18Updation of NAS signalling release conditions based on unavailability information Details C1-241334 postponedCT1#147Huawei, HiSilic...    5GSAT_Ph2
See details 24.3014003-F18.5.0Rel-18Updation of NAS signalling release conditions based on unavailability information Details C1-241041 revisedCT1#147Huawei, HiSilic...    5GSAT_Ph2
See details 24.3014002-F18.5.0Rel-18Modify the direction of the transmission of the Unavailability information IE Details C1-241040 postponedCT1#147SHARP    5GSAT_Ph2
See details 24.3014001-F18.5.0Rel-18Clariification that the NAS signalling connection is released only when start of UP is not provided Details C1-241036 agreedCT1#147Huawei, HiSilic... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30140001F18.5.0Rel-18URSP provisioning in EPS - additional PDN connections Details C1-241311 agreedCT1#147Ericsson Details CP-240108 approvedCT#103CT118.6.0eUEPO
See details 24.3014000-F18.5.0Rel-18URSP provisioning in EPS - additional PDN connections Details C1-241007 revisedCT1#147Ericsson    eUEPO
See details 24.30139991F18.5.0Rel-18UE policy container with the length of two octets purpose Details C1-241309 agreedCT1#147Ericsson Details CP-240108 approvedCT#103CT118.6.0eUEPO
See details 24.3013999-F18.5.0Rel-18UE policy container with the length of two octets purpose Details C1-241004 revisedCT1#147Ericsson    eUEPO
See details 24.30139981F18.5.0Rel-18Correction to the name of the IE and some editorial corrections Details C1-241332 agreedCT1#147Huawei, HiSilic... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.3013998-F18.5.0Rel-18Correction to the name of the IE and some editorial corrections Details C1-240993 revisedCT1#147Huawei, HiSilic...    5GSAT_Ph2
See details 24.30139971F18.5.0Rel-18Clarification that the MME adjusts different timers based on UP duration and start time. Details C1-241333 agreedCT1#147Huawei, HiSilicon Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.3013997-F18.5.0Rel-18Clarification that the MME adjusts different timers based on UP duration and start time. Details C1-240991 revisedCT1#147Huawei, HiSilicon    5GSAT_Ph2
See details 24.3013996-F18.5.0Rel-18Correction to determination of periodic timer, mobile reachable timer based on UP and start of UP Details C1-240987 agreedCT1#147Huawei, HiSilicon Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30139952B18.5.0Rel-18Addition of start of unavailability period to Unavailability configuration IE. Details C1-241830 agreedCT1#147Huawei, HiSilic... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30139951B18.5.0Rel-18Addition of start of unavailability period to Unavailability configuration IE. Details C1-241323 revisedCT1#147Huawei, HiSilic...    5GSAT_Ph2
See details 24.3013995-B18.5.0Rel-18Addition of start of unavailability period to Unavailability configuration IE. Details C1-240965 revisedCT1#147Huawei, HiSilic...    5GSAT_Ph2
See details 24.30139941F18.5.0Rel-18Storing saved discontinuous coverage maximum time offset in NV Details C1-241330 postponedCT1#147Samsung    5GSAT_Ph2
See details 24.3013994-F18.5.0Rel-18Storing saved discontinuous coverage maximum time offset in NV Details C1-240930 revisedCT1#147Samsung    5GSAT_Ph2
See details 24.3013993-F18.5.0Rel-18Consideration of discontinuous coverage maximum time offset while leaving coverage Details C1-240928 agreedCT1#147Samsung Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.3013992-F18.5.0Rel-18Voice services for EMM cause #2 Details C1-240904 postponedCT1#147Apple    TEI18
See details 24.30139911F18.5.0Rel-18Network behaviour upon N1 to S1 transition with only Emergency session active Details C1-241356 agreedCT1#147Apple Details CP-240121 approvedCT#103CT118.6.0SAES18
See details 24.3013991-F18.5.0Rel-18Network behaviour upon N1 to S1 transition with only Emergency session active Details C1-240736 revisedCT1#147Apple    SAES18
See details 24.30139901F18.5.0Rel-18Correction of the conditions for initiating a detach in EMM-REGISTERED.ATTEMPTING-TO-UPDATE and EMM-REGISTERED.UPDATE-NEEDED Details C1-241760 agreedCT1#147Apple Details CP-240125 approvedCT#103CT118.6.0TEI18
See details 24.3013990-F18.5.0Rel-18Correction of the conditions for initiating a detach in EMM-REGISTERED.ATTEMPTING-TO-UPDATE and EMM-REGISTERED.UPDATE-NEEDED Details C1-240735 revisedCT1#147Apple    TEI18
See details 24.3013989-F18.5.0Rel-18Correct reference in current TAI definition Details C1-240645 mergedCT1#147Qualcomm Incorp...    TEI18
See details 24.3013988-F18.5.0Rel-18Modifications to Unavailability configuration IE Details C1-240632 mergedCT1#147MediaTek Inc.    5GSAT_Ph2
See details 24.30139873B18.5.0Rel-18UE behaviour if Network policy IE is not included Details C1-241783 endorsedCT1#147Apple, Nokia, N...    TEI18
See details 24.30139872B18.5.0Rel-18UE behaviour if Network policy IE is not included Details C1-241369 revisedCT1#147Apple    TEI18
See details 24.30139871B18.5.0Rel-18UE behaviour if Network policy IE is not included Details C1-241193 revisedCT1#147Apple    TEI18
See details 24.3013987-B18.5.0Rel-18UE behaviour if Network policy IE is not included Details C1-240590 revisedCT1#147Apple France    TEI18
See details 24.30139861F18.5.0Rel-18Reset of UE implementation specific attempt counter for CustomLLFailureRetry Details C1-241355 agreedCT1#147Apple Details CP-240121 approvedCT#103CT118.6.0SAES18
See details 24.3013986-F18.5.0Rel-18Reset of UE implementation specific attempt counter for CustomLLFailureRetry Details C1-240565 revisedCT1#147Apple    SAES18
See details 24.30139851C18.5.0Rel-18Synchronizing unreachability due to discontinuous coverage Details C1-241319 postponedCT1#147Qualcomm Incorp...    5GSAT_Ph2
See details 24.3013985-C18.5.0Rel-18Synchronizing unreachability due to discontinuous coverage Details C1-240554 revisedCT1#147Qualcomm Incorp...    5GSAT_Ph2
See details 24.30139843C18.5.0Rel-18Handling of unavailability period in the attach procedure Details C1-241832 agreedCT1#147Qualcomm Incorp... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30139842C18.5.0Rel-18Handling of unavailability period in the attach procedure Details C1-241751 revisedCT1#147Qualcomm Incorp...    5GSAT_Ph2
See details 24.30139841C18.5.0Rel-18Handling of unavailability period in the attach procedure Details C1-241317 revisedCT1#147Qualcomm Incorp...    5GSAT_Ph2
See details 24.3013984-C18.5.0Rel-18Handling of unavailability period in the attach procedure Details C1-240552 revisedCT1#147Qualcomm Incorp...    5GSAT_Ph2
See details 24.30139831F18.5.0Rel-18Correction to the term "Current TAI" Details C1-241354 agreedCT1#147Huawei, HiSilicon Details CP-240129 approvedCT#103CT118.6.0IoT_SAT_ARCH_EP...
See details 24.3013983-F18.5.0Rel-18Correction to the term "Current TAI" Details C1-240541 revisedCT1#147Huawei, HiSilicon    IoT_SAT_ARCH_EP...
See details 24.30139822F18.5.0Rel-18Addition of Unavailability information IE in TAU request Details C1-241748 agreedCT1#147Ericsson, Qualc... Details CP-240095 approvedCT#103CT118.6.05GSAT_Ph2
See details 24.30139821F18.5.0Rel-18Addition of Unavailability information IE in TAU request Details C1-241315 revisedCT1#147Ericsson, Qualc...    5GSAT_Ph2
See details 24.3013982-F18.5.0Rel-18Addition of Unavailability information IE in TAU request Details C1-240520 revisedCT1#147Ericsson, Qualc...    5GSAT_Ph2
See details 24.3013981-B18.4.0Rel-18Correction for Support for enhanced discontinuous coverage Details C1-239169 mergedCT1#145Samsung    5GSAT_Ph2
See details 24.3013980-B18.4.0Rel-18Correcting Encoding of unavailability configuration Details C1-239166 mergedCT1#145Samsung    SUECR, 5GSAT_Ph2
See details 24.3013979-F18.4.0Rel-18Consideration of satellite cell after disabling NB-IoT capability Details C1-239134 withdrawnCT1#145BEIJING SAMSUNG...    TEI18
See details 24.30139781F18.4.0Rel-18Consideration of satellite cell after disabling NB-IoT capability Details C1-239356 agreedCT1#145Samsung Details CP-233189 approvedCT#102CT118.5.0TEI18
See details 24.3013978-F18.4.0Rel-18Consideration of satellite cell after disabling NB-IoT capability Details C1-239133 revisedCT1#145Samsung    TEI18
See details 24.3013977-F18.4.0Rel-18Support EPS bearer context status synchronization in Service Reject message Details C1-239126 postponedCT1#145Google Inc.    5GProtoc18
See details 24.30139761F18.4.0Rel-18Clarification for the Packet filter ID for adding and replaing packet filters Details C1-239316 agreedCT1#145Huawei, HiSilicon Details CP-233191 approvedCT#102CT118.5.0SAES18
See details 24.3013976-F18.4.0Rel-18Clarification for the Packet filter ID for adding and replaing packet filters Details C1-239089 revisedCT1#145Huawei, HiSilicon    SAES18
See details 24.30139751F18.4.0Rel-18Correction to EMM REGISTERED.NO CELL AVAILABLE substate for unavailbility period Details C1-239304 mergedCT1#145Huawei, HiSilicon    5GSAT_Ph2
See details 24.3013975-F18.4.0Rel-18Correction to EMM REGISTERED.NO CELL AVAILABLE substate for unavailbility period Details C1-239072 revisedCT1#145Huawei, HiSilicon    5GSAT_Ph2
See details 24.30139741F18.4.0Rel-18Correction to EMM DEREGISTERED.NO CELL AVAILABLE substate for unavailbility period Details C1-239303 mergedCT1#145Huawei, HiSilicon    5GSAT_Ph2
See details 24.3013974-F18.4.0Rel-18Correction to EMM DEREGISTERED.NO CELL AVAILABLE substate for unavailbility period Details C1-239069 revisedCT1#145Huawei, HiSilicon    5GSAT_Ph2
See details 24.30139732F18.5.0Rel-18Correction for PDN connection type selection in the RSD Details C1-241394 postponedCT1#147Nokia, Nokia Sh...    5GProtoc18
See details 24.30139731F18.5.0Rel-18Correction for PDN connection type selection in the RSD Details C1-241050 revisedCT1#147Nokia, Nokia Sh...    5GProtoc18
See details 24.3013973-F18.4.0Rel-18Correction for PDN connection type selection in the RSD Details C1-239056 revisedCT1#145Nokia, Nokia Sh...    5GProtoc18
See details 24.30139721F18.4.0Rel-18Allign LTE behaviour with 5G behaviour for interworking Details C1-239332 postponedCT1#145Huawei, HiSilic...    5GProtoc18
See details 24.3013972-F18.4.0Rel-18Allign LTE behaviour with 5G behaviour for interworking Details C1-239035 revisedCT1#145Huawei, HiSilic...    5GProtoc18
See details 24.3013971-F18.4.0Rel-18ePCO support after inter-system change from N1 mode to S1 mode Details C1-239033 agreedCT1#145Intel, Ericsson Details CP-233166 approvedCT#102CT118.5.0SAES18, eUEPO
See details 24.30139702B18.4.0Rel-18Introduce Maximum time offset IE in the TAU ACCEPT message Details C1-239679 agreedCT1#145Huawei, HiSilic... Details CP-233145 approvedCT#102CT118.5.05GSAT_Ph2
See details 24.30139701B18.4.0Rel-18Introduce Maximum time offset IE in the TAU ACCEPT message Details C1-239301 revisedCT1#145Huawei, HiSilic...    5GSAT_Ph2
See details 24.3013970-B18.4.0Rel-18Introduce Maximum time offset IE in the TAU ACCEPT message Details C1-238888 revisedCT1#145Huawei, HiSilicon    5GSAT_Ph2
See details 24.30139692F18.4.0Rel-18Local Detach at the UE side when T3346 is running due to the reception of Extended Wait Time (EWT) in UTRAN Details C1-239348 postponedCT1#145Apple    TEI18
See details 24.30139691F18.4.0Rel-18Local Detach at the UE side when T3346 is running due to the reception of Extended Wait Time (EWT) in UTRAN Details C1-239178 revisedCT1#145Apple    TEI18
See details 24.3013969-F18.4.0Rel-18Local Detach at the UE side when T3346 is running due to the reception of Extended Wait Time (EWT) in UTRAN Details C1-238784 revisedCT1#145Apple    TEI18
See details 24.3013968-F18.4.0Rel-18Cleanup of TS 24.301 Details C1-238765 agreedCT1#145Nokia, Nokia Sh... Details CP-233191 approvedCT#102CT118.5.0SAES18
See details 24.30139671A18.4.0Rel-18Redirection with MPS corrections Details C1-239204 not pursuedCT1#145Peraton Labs, C...    TEI18
See details 24.3013967-A18.4.0Rel-18Redirection with MPS corrections Details C1-238691 revisedCT1#145Peraton Labs, C...    TEI18, MPS2
See details 24.3013966-F17.11.0Rel-17Redirection with MPS corrections Details C1-238690 withdrawnCT1#145Peraton Labs, C...    TEI17, MPS2
See details 24.30139652B18.4.0Rel-18UE behaviour upon N1 to S1 transition with only Emergency session active Details C1-239683 agreedCT1#145Apple Details CP-233191 approvedCT#102CT118.5.0SAES18
See details 24.30139651B18.4.0Rel-18UE behaviour upon N1 to S1 transition with only Emergency session active Details C1-239315 revisedCT1#145Apple    SAES18
See details 24.3013965-B18.4.0Rel-18UE behaviour upon N1 to S1 transition with only Emergency session active Details C1-238682 revisedCT1#145Apple    SAES18
See details 24.30139641F18.4.0Rel-18Corrections to configurable attach and TAU retries for some lower layer failures Details C1-239314 agreedCT1#145Apple, Qualcomm... Details CP-233191 approvedCT#102CT118.5.0SAES18
See details 24.3013964-F18.4.0Rel-18Corrections to configurable attach and TAU retries for some lower layer failures Details C1-238646 revisedCT1#145Apple    SAES18
See details 24.30139631F18.4.0Rel-18Attach and TAU failure at inter-system change for emergency services fallback Details C1-239313 postponedCT1#145MediaTek Inc.    SAES18
See details 24.3013963-F18.4.0Rel-18Attach and TAU failure at inter-system change for emergency services fallback Details C1-238625 revisedCT1#145MediaTek Inc.    SAES18
See details 24.3013962-F18.4.0Rel-18Handling authentication reject during emergency services Details C1-238624 agreedCT1#145MediaTek Inc., ... Details CP-233191 approvedCT#102CT118.5.0SAES18
See details 24.3013961-B18.4.0Rel-18Handling T3448 timer during unavailability period Details C1-238621 agreedCT1#145MediaTek Inc. Details CP-233145 approvedCT#102CT118.5.05GSAT_Ph2
See details 24.30139602F18.4.0Rel-18The handling on unavailability period in TAU procedure Details C1-239677 agreedCT1#145vivo, Nokia, No... Details CP-233145 approvedCT#102CT118.5.05GSAT_Ph2
See details 24.30139601F18.4.0Rel-18The handling on unavailability period in TAU procedure Details C1-239289 revisedCT1#145vivo, Qualcomm ...    5GSAT_Ph2
See details 24.3013960-F18.4.0Rel-18The handling on unavailability period in TAU procedure Details C1-238586 revisedCT1#145vivo    5GSAT_Ph2
See details 24.3013959-F18.4.0Rel-18Add a trigger of attach procedure for unavailability period Details C1-238585 postponedCT1#145vivo    5GSAT_Ph2
See details 24.30139581F18.4.0Rel-18EMM context storage when emergency attached, 24.501 alignment Details C1-239312 agreedCT1#145Apple Details CP-233191 approvedCT#102CT118.5.0SAES18
See details 24.3013958-F18.4.0Rel-18EMM context storage when emergency attached, 24.501 alignment Details C1-238579 revisedCT1#145Apple    SAES18
See details 24.3013957-B18.4.0Rel-18Clarification for unavailability information for enhanced discontinuous coverage in case of dual registration Details C1-238570 postponedCT1#145Nokia, Nokia Sh...    5GSAT_Ph2
See details 24.30139561F18.4.0Rel-18Editorial corrections to clarifying conditions Details C1-239343 agreedCT1#145NTT DOCOMO Details CP-233189 approvedCT#102CT118.5.0TEI18
See details 24.3013956-F18.4.0Rel-18Editorial corrections to clarifying conditions Details C1-238557 revisedCT1#145NTT DOCOMO    TEI18
See details 24.30139551F18.4.0Rel-18Handling of the unavailability configuration Details C1-239293 postponedCT1#145Qualcomm Incorp...    5GSAT_Ph2
See details 24.3013955-F18.4.0Rel-18Handling of the unavailability configuration Details C1-238549 revisedCT1#145Qualcomm Incorp...    5GSAT_Ph2
See details 24.30139543F18.4.0Rel-18Handling of the unavailability information in the tracking area updating procedure Details C1-239686 agreedCT1#145Qualcomm Incorp... Details CP-233145 approvedCT#102CT118.5.05GSAT_Ph2
See details 24.30139542F18.4.0Rel-18Handling of the unavailability information in the tracking area updating procedure Details C1-239676 revisedCT1#145Qualcomm Incorp...    5GSAT_Ph2
See details 24.30139541F18.4.0Rel-18Handling of the unavailability information in the tracking area updating procedure Details C1-239288 revisedCT1#145Qualcomm Incorp...    5GSAT_Ph2
See details 24.3013954-F18.4.0Rel-18Handling of the unavailability information in the tracking area updating procedure Details C1-238546 revisedCT1#145Qualcomm Incorp...    5GSAT_Ph2
See details 24.3013953-F18.4.0Rel-18Clarification on the handling of unavailability period during inter-system change between 5GC and EPS Details C1-238545 withdrawnCT1#145Qualcomm Incorp...    5GSAT_Ph2
See details 24.3013952-B18.4.0Rel-18Added the negotiation of enhanced discontinous coverage support Details C1-237674 mergedCT1#144Huawei, HiSilicon    IoT_SAT_ARCH_EP...
See details 24.30139512F18.4.0Rel-18Correction on starting timer T3440 if indicate re-registration required Details C1-237939 agreedCT1#144China Telecom, ... Details CP-233191 approvedCT#102CT118.5.0SAES18
See details 24.30139511F18.4.0Rel-18Correction on starting timer T3440 if indicate re-registration required Details C1-237843 revisedCT1#144China Telecom, ...    SAES18
See details 24.3013951-F18.4.0Rel-18Correction on starting timer T3440 if indicate re-registration required Details C1-237652 revisedCT1#144China Telecom, ...    SAES18
See details 24.30139501F18.4.0Rel-18Consistent value name for GUTI type Details C1-237842 agreedCT1#144China Telecom, ... Details CP-233191 approvedCT#102CT118.5.0SAES18
See details 24.3013950-F18.4.0Rel-18Consistent value name for GUTI type Details C1-237645 revisedCT1#144China Telecom, ...    SAES18
See details 24.30139491F18.4.0Rel-18TAIs belonging to different PLMNs which are equivalent PLMNs in "forbidden tracking areas for regional provision of service" or "forbidden tracking areas for roaming" Details C1-237851 agreedCT1#144Samsung Details CP-233189 approvedCT#102CT118.5.0TEI18
See details 24.3013949-F18.4.0Rel-18TAIs belonging to different PLMNs which are equivalent PLMNs in "forbidden tracking areas for regional provision of service" or "forbidden tracking areas for roaming" Details C1-237606 revisedCT1#144Samsung    TEI18
See details 24.30139484F18.4.0Rel-18Clarification on the PDN connection used for URSP provisioning in EPS Details C1-239269 agreedCT1#145Intel, Lenovo, ... Details CP-233166 approvedCT#102CT118.5.0eUEPO
See details 24.30139483F18.4.0Rel-18Clarification on the PDN connection used for URSP provisioning in EPS Details C1-239059 revisedCT1#145Intel    eUEPO
See details 24.30139482F18.4.0Rel-18Clarification on the PDN connection used for URSP provisioning in EPS Details C1-237983 revisedCT1#144Intel    eUEPO
See details 24.30139481F18.4.0Rel-18Clarification on the PDN connection used for URSP provisioning in EPS Details C1-237777 revisedCT1#144Intel    eUEPO
See details 24.3013948-F18.4.0Rel-18Clarification on the PDN connection used for URSP provisioning in EPS Details C1-237605 revisedCT1#144Intel    eUEPO
See details 24.30139472B18.4.0Rel-18Updation for the timer handling for unavailability period activation. Details C1-239032 agreedCT1#145Huawei, HiSilic... Details CP-233148 approvedCT#102CT118.5.05GSAT_Ph2, SENSE
See details 24.30139471B18.4.0Rel-18Updation for the timer handling for unavailability period activation. Details C1-237747 revisedCT1#144Huawei, HiSilic...    IoT_SAT_ARCH_EP...
See details 24.3013947-B18.4.0Rel-18Updation for the timer handling for unavailability period activation. Details C1-237573 revisedCT1#144Huawei, HiSilic...    IoT_SAT_ARCH_EP...
See details 24.30139461B18.4.0Rel-18Addition to the trigger for TAU for unavailability period. Details C1-237746 agreedCT1#144Huawei, HiSilicon Details CP-233148 approvedCT#102CT118.5.0IoT_SAT_ARCH_EP...
See details 24.3013946-B18.4.0Rel-18Addition to the trigger for TAU for unavailability period. Details C1-237572 revisedCT1#144Huawei, HiSilicon    IoT_SAT_ARCH_EP...
See details 24.3013945-F18.4.0Rel-18Handling of a reject message including EMM cause value #78 without integrity protection Details C1-237560 agreedCT1#144Samsung Details CP-233189 approvedCT#102CT118.5.0TEI18
See details 24.3013944-B18.4.0Rel-18Clarification on determination of periodic TAU timer based on unavailablity period Details C1-237558 mergedCT1#144Huawei, HiSilicon    5GSAT_Ph2
See details 24.3013943-B18.4.0Rel-18Addition of general condition for informing unavailability period parameters Details C1-237547 mergedCT1#144Huawei, HiSilicon    5GSAT_Ph2
See details 24.3013942-B18.4.0Rel-18Added note about combining discontinous coverage periods. Details C1-237545 mergedCT1#144Huawei, HiSilicon    5GSAT_Ph2
See details 24.30139412F18.4.0Rel-18EPS bearer handling after CPSR with active flag not having bearer resource (24.301) Details C1-237947 agreedCT1#144Samsung Details CP-233189 approvedCT#102CT118.5.0TEI18
See details 24.30139411F18.4.0Rel-18EPS bearer handling after CPSR with active flag not having bearer resource (24.301) Details C1-237849 revisedCT1#144Samsung    TEI18
See details 24.3013941-F18.4.0Rel-18EPS bearer handling after CPSR with active flag not having bearer resource (24.301) Details C1-237454 revisedCT1#144Samsung    TEI18
See details 24.30139403B18.4.0Rel-18Encoding of unavailability configuration Details C1-239305 agreedCT1#145Qualcomm Incorp... Details CP-233148 approvedCT#102CT118.5.0SUECR, 5GSAT_Ph2
See details 24.30139402B18.4.0Rel-18Encoding of unavailability configuration Details C1-237906 revisedCT1#144Qualcomm Incorp...    SUECR, 5GSAT_Ph2
See details 24.30139401B18.4.0Rel-18Encoding of unavailability configuration Details C1-237729 revisedCT1#144Qualcomm Incorp...    SUECR, 5GSAT_Ph2
See details 24.3013940-B18.4.0Rel-18Encoding of unavailability configuration Details C1-237399 revisedCT1#144Qualcomm Incorp...    SUECR, 5GSAT_Ph2
See details 24.30139392B18.4.0Rel-18UE unavailability period reporting for enhanced discontinuous coverage overrides mobility management congestion control - EPS Details C1-237908 agreedCT1#144Nokia, Nokia Sh... Details CP-233145 approvedCT#102CT118.5.05GSAT_Ph2
See details 24.30139391B18.4.0Rel-18UE unavailability period reporting for enhanced discontinuous coverage overrides mobility management congestion control - EPS Details C1-237740 revisedCT1#144Nokia, Nokia Sh...    5GSAT_Ph2
See details 24.3013939-B18.4.0Rel-18UE unavailability period reporting for enhanced discontinuous coverage overrides mobility management congestion control - EPS Details C1-237336 revisedCT1#144Nokia, Nokia Sh...    5GSAT_Ph2
See details 24.30139382B18.4.0Rel-18Encoding of unavailability information Details C1-237905 agreedCT1#144Qualcomm Incorp... Details CP-233148 approvedCT#102CT118.5.05GSAT_Ph2, SUECR
See details 24.30139381B18.4.0Rel-18Encoding of unavailability information Details C1-237728 revisedCT1#144Qualcomm Incorp...    5GSAT_Ph2, SUECR
See details 24.3013938-B18.4.0Rel-18Encoding of unavailability information Details C1-237072 revisedCT1#144Qualcomm Incorp...    5GSAT_Ph2, SUECR
See details 24.30139373B18.4.0Rel-18Support for enhanced discontinuous coverage Details C1-239649 agreedCT1#145Qualcomm Incorp... Details CP-233145 approvedCT#102CT118.5.05GSAT_Ph2
See details 24.30139372B18.4.0Rel-18Support for enhanced discontinuous coverage Details C1-239306 revisedCT1#145Qualcomm Incorp...    5GSAT_Ph2
See details 24.30139371B18.4.0Rel-18Support for enhanced discontinuous coverage Details C1-237727 revisedCT1#144Qualcomm Incorp...    5GSAT_Ph2
See details 24.3013937-B18.4.0Rel-18Support for enhanced discontinuous coverage Details C1-237071 revisedCT1#144Qualcomm Incorp...    5GSAT_Ph2
See details 24.30139361B18.4.0Rel-18URSP provisioning in EPS procedure Details C1-237775 agreedCT1#144Lenovo Details CP-233166 approvedCT#102CT118.5.0eUEPO
See details 24.3013936-B18.4.0Rel-18URSP provisioning in EPS procedure Details C1-237068 revisedCT1#144Lenovo    eUEPO
See details 24.30139351B18.4.0Rel-18Overview of URSP provisioning in EPS Details C1-237772 agreedCT1#144Lenovo Details CP-233166 approvedCT#102CT118.5.0eUEPO
See details 24.3013935-B18.4.0Rel-18Overview of URSP provisioning in EPS Details C1-237066 revisedCT1#144Lenovo    eUEPO
See details 24.30139342B18.4.0Rel-18Transport of messages of network-requested UE policy management procedure Details C1-237913 agreedCT1#144Ericsson Details CP-233166 approvedCT#102CT118.5.0eUEPO
See details 24.30139341B18.4.0Rel-18Transport of messages of network-requested UE policy management procedure Details C1-237776 revisedCT1#144Ericsson    eUEPO
See details 24.3013934-B18.4.0Rel-18Transport of messages of network-requested UE policy management procedure Details C1-237047 revisedCT1#144Ericsson    eUEPO
See details 24.3013933-A18.3.0Rel-18Enable UE to reject the use of null ciphering algorithm for non-emergency scenario Details C1-235723 postponedCT1#143Google Inc.    TEI17
See details 24.3013932-F17.10.0Rel-17Enable UE to reject the use of null ciphering algorithm for non-emergency scenario Details C1-235722 postponedCT1#143Google Inc.    TEI17
See details 24.30139311F18.3.0Rel-18EPS release connection handling Details C1-236309 postponedCT1#143MediaTek Inc.    TEI18
See details 24.3013931-F18.3.0Rel-18EPS release connection handling Details C1-235713 revisedCT1#143MediaTek Inc.    TEI18
See details 24.30139301F18.3.0Rel-18Handover handling for S1 mode capability and forbidden list Details C1-236308 postponedCT1#143MediaTek Inc.    TEI18
See details 24.3013930-F18.3.0Rel-18Handover handling for S1 mode capability and forbidden list Details C1-235707 revisedCT1#143MediaTek Inc.    TEI18
See details 24.30139291F18.3.0Rel-18Clarification on handling of received T3402 in TAU reject message Details C1-236266 postponedCT1#143Huawei, HiSilicon    SAES18
See details 24.3013929-F18.3.0Rel-18Clarification on handling of received T3402 in TAU reject message Details C1-235692 revisedCT1#143Huawei, HiSilicon    SAES18
See details 24.30139283B18.4.0Rel-18Return to coverage notification indication Details C1-237730 agreedCT1#144Xiaomi, CATT Details CP-233145 approvedCT#102CT118.5.05GSAT_Ph2
See details 24.30139282B18.4.0Rel-18Return to coverage notification indication Details C1-237452 revisedCT1#144Xiaomi, CATT    5GSAT_Ph2
See details 24.30139281B18.3.0Rel-18Return to coverage notification indication Details C1-236292 revisedCT1#143Xiaomi    5GSAT_Ph2
See details 24.3013928-B18.3.0Rel-18Return to coverage notification indication Details C1-235619 revisedCT1#143Xiaomi    5GSAT_Ph2
See details 24.30139272A18.3.0Rel-18Handling of un-authorized IAB UEs Details C1-236531 agreedCT1#143Intel Details CP-232205 approvedCT#101CT118.4.0IABARC
See details 24.30139271A18.3.0Rel-18Handling of un-authorized IAB UEs Details C1-235951 revisedCT1#143Intel    IABARC
See details 24.3013927-A18.3.0Rel-18Handling of un-authorized IAB UEs Details C1-235597 revisedCT1#143Intel    IABARC
See details 24.30139262A17.10.0Rel-17Handling of un-authorized IAB UEs Details C1-236530 agreedCT1#143Intel Details CP-232205 approvedCT#101CT117.11.0IABARC
See details 24.30139261A17.10.0Rel-17Handling of un-authorized IAB UEs Details C1-235950 revisedCT1#143Intel    IABARC
See details 24.3013926-A17.10.0Rel-17Handling of un-authorized IAB UEs Details C1-235596 revisedCT1#143Intel    IABARC
See details 24.30139252F16.8.0Rel-16Handling of un-authorized IAB UEs Details C1-236529 agreedCT1#143Intel Details CP-232205 approvedCT#101CT116.9.0IABARC
See details 24.30139251F16.8.0Rel-16Handling of un-authorized IAB UEs Details C1-235949 revisedCT1#143Intel    IABARC
See details 24.3013925-F16.8.0Rel-16Handling of un-authorized IAB UEs Details C1-235595 revisedCT1#143Intel    IABARC
See details 24.30139241B18.3.0Rel-18Network support and clarification of the redir-policy bit Details C1-236303 agreedCT1#143Vodafone, Orange Details CP-232195 approvedCT#101CT118.4.0TEI18
See details 24.3013924-B18.3.0Rel-18Network support and clarification of the redir-policy bit Details C1-235563 revisedCT1#143Vodafone, Orange    TEI18
See details 24.30139231F18.3.0Rel-18PLMN search in EMM-IDLE with suspend indication Details C1-236270 postponedCT1#143MediaTek Inc.    SAES18
See details 24.3013923-F18.3.0Rel-18PLMN search in EMM-IDLE with suspend indication Details C1-235561 revisedCT1#143MediaTek Inc.    SAES18
See details 24.30139221B18.3.0Rel-18Handling of NAS timers due to discontinuous coverage Details C1-236283 agreedCT1#143MediaTek Inc. Details CP-232198 approvedCT#101CT118.4.05GSAT_Ph2
See details 24.3013922-B18.3.0Rel-18Handling of NAS timers due to discontinuous coverage Details C1-235552 revisedCT1#143MediaTek Inc.    5GSAT_Ph2
See details 24.3013921-B18.3.0Rel-18Network indication to the UE for enhanced discontinuous coverage support - EPS Details C1-235440 mergedCT1#143Nokia, Nokia Sh...    5GSAT_Ph2
See details 24.30139203B18.4.0Rel-18Capability negotiation for enhanced discontinuous coverage - EPS Details C1-237739 agreedCT1#144Nokia, Nokia Sh... Details CP-233145 approvedCT#102CT118.5.05GSAT_Ph2
See details 24.30139202B18.4.0Rel-18Capability negotiation for enhanced discontinuous coverage - EPS Details C1-237335 revisedCT1#144Nokia, Nokia Sh...    5GSAT_Ph2
See details 24.30139201B18.3.0Rel-18UE capability indication to the network for enhanced discontinuous coverage - EPS Details C1-236272 postponedCT1#143Nokia, Nokia Sh...    5GSAT_Ph2
See details 24.3013920-B18.3.0Rel-18UE capability indication to the network for enhanced discontinuous coverage - EPS Details C1-235439 revisedCT1#143Nokia, Nokia Sh...    5GSAT_Ph2
See details 24.3013919-F18.3.0Rel-18Clean up Measurement Assistance Information related description Details C1-235387 agreedCT1#143ZTE Details CP-232189 approvedCT#101CT118.4.05GProtoc18, ATS...
See details 24.30139181F18.3.0Rel-18Coordination between 5GMM and EMM states in single registration mode Details C1-236426 agreedCT1#143Apple Details CP-232189 approvedCT#101CT118.4.05GProtoc18
See details 24.3013918-F18.3.0Rel-18Coordination between 5GMM and EMM states in single registration mode Details C1-235362 revisedCT1#143Apple    5GProtoc18
See details 24.30139171F18.3.0Rel-18Correction to TFT handlling for empty packet filter list in 4G Details C1-236476 agreedCT1#143Qualcomm Incorp... Details CP-232195 approvedCT#101CT118.4.0TEI18
See details 24.3013917-F18.3.0Rel-18Correction to TFT handlling for empty packet filter list in 4G Details C1-235314 revisedCT1#143Qualcomm Incorp...    TEI18
See details 24.30139161F18.3.0Rel-18Fix timer tables for satellite access Details C1-236312 agreedCT1#143Qualcomm Incorp... Details CP-232195 approvedCT#101CT118.4.0TEI18, IoT_SAT_...