• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 60 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
25.9310052-10.0.0Rel-10Correction of referencesR3-111261agreedRP-110684approved10.1.0
25.9310051- Rel-9Removal of unused referencesR3-110560 -  
25.9310050-7.4.0Rel-8Introduction of Enhanced RelocationR3-083220agreedRP-080840approved8.0.0
25.9310049-7.3.0Rel-7Introduction of 1.28 Mcps TDD Enhanced UplinkR3-070192agreedRP-070062approved7.4.0
25.931004817.2.0Rel-7Consistency of Specification Notations- RP-060837approved7.3.0
25.9310048-7.2.0Rel-7Consistency of Specification NotationsR3-061921agreedRP-060710revised 
25.9310047-7.1.0Rel-7Introduction of 3.84 Mcps and 7.68Mcps TDD Enhanced UplinkR3-061133agreedRP-060511approved7.2.0
25.9310046-7.1.0Rel-7Introduction of 3.84 Mcps TDD Enhanced UplinkR3-061127agreedRP-060512withdrawn 
25.931004517.0.0Rel-7Inter-RAT PS Continuity using CCOR3-060790agreedRP-060275approved7.1.0
25.9310045-7.0.0Rel-7Inter-RAT PS Continuity using CCOR3-060629revised-  
25.931004416.3.0Rel-6Inter-RAT PS Continuity using CCOR3-060789agreedRP-060275approved6.4.0
25.9310044-6.3.0Rel-6Inter-RAT PS Continuity using CCOR3-060628revised-  
25.931004315.3.0Rel-5Inter-RAT PS Continuity using CCOR3-060788agreedRP-060275approved5.4.0
25.9310043-5.3.0Rel-5Inter-RAT PS Continuity using CCOR3-060627revised-  
25.9310042-6.2.0Rel-6De-allocation of the previous resources when unsynchronized HSPA Serving Cell Change is done by RL Addition procedureR3-060310withdrawn-  
25.9310041-6.2.0Rel-6SRNS Relocation example correctionR3-060195agreedRP-060059approved6.3.0
25.9310040-5.2.0Rel-5SRNS Relocation example correctionR3-060194agreedRP-060059approved5.3.0
25.9310039-4.4.0Rel-4SRNS Relocation example correctionR3-060193agreedRP-060059approved4.5.0
25.9310038-6.1.0Rel-6Feature clean-up: Removal of DSCH (FDD mode)R3-050742agreedRP-050222approved6.2.0
25.9310037-5.1.0Rel-5Feature clean-up: Removal of DSCH (FDD mode)R3-050741agreedRP-050222approved5.2.0
25.9310036-6.1.0Rel-6Feature Cleanup: Removal of CPCHR3-050740agreedRP-050225approved6.2.0
25.9310035-5.1.0Rel-5Feature Cleanup: Removal of CPCHR3-050739agreedRP-050225approved5.2.0
25.9310034-6.1.0Rel-6Corrections to MBMS specific proceduresR3-050678rejected-  
25.9310033-6.1.0Rel-6Feature Clean-up: Removal of SSDTR3-050660agreedRP-050219approved6.2.0
25.9310032-5.1.0Rel-5Feature Clean-up: Removal of SSDTR3-050659agreedRP-050219approved5.2.0
25.931003116.1.0Rel-6Updates of MBMS scenariosR3-050713agreedRP-050227approved6.2.0
25.9310031-6.1.0Rel-6Updates of MBMS scenariosR3-050581revised-  
25.931003016.1.0Rel-6Introduction of E-DCH scenariosR3-050770agreedRP-050230approved6.2.0
25.9310030-6.1.0Rel-6Introduction of E-DCH scenariosR3-050580revised-  
25.9310029-6.1.0Rel-6Feature Cleanup: Removal of DRACR3-050498agreedRP-050223approved6.2.0
25.9310028-5.1.0Rel-5Feature Cleanup: Removal of DRACR3-050497agreedRP-050223approved5.2.0
25.931002716.1.0Rel-6HS-DSCH Mobility proceduresR3-050693agreedRP-050217approved6.2.0
25.9310027-6.1.0Rel-6HS-DSCH Mobility proceduresR3-050457revised-  
25.931002615.1.0Rel-5HS-DSCH Mobility proceduresR3-050692agreedRP-050217approved5.2.0
25.9310026-5.1.0Rel-5HS-DSCH Mobility proceduresR3-050456revised-  
25.931002516.0.0Rel-6Signalling flows for MBMSR3-050284agreedRP-050057approved6.1.0
25.9310025-6.0.0Rel-6Signalling flows for MBMSR3-050159revised-  
25.931002415.1.0Rel-6Introduction of MBMS scenariosR3-041613rejected-  
25.9310024-5.1.0Rel-6Introduction of MBMS scenariosR3-041454revised-  
25.9310023-5.1.0Rel-5Update for HS-DSCH Serving Cell Change ProcedureR3-040844withdrawn-  
25.9310021-5.0.0Rel-5Addition of pre-emption signalling sequencesR3-021518agreedRP-020415approved5.1.0
25.9310020-4.3.0Rel-4Addition of pre-emption signalling sequencesR3-021517agreedRP-020415approved4.4.0
25.931001913.6.0R1999Addition of pre-emption signalling sequencesR3-021516agreedRP-020415approved3.7.0
25.931001815.0.0Rel-5HSDPA Additions for Example ProceduresR3-021520agreedRP-020422approved5.1.0
25.931001714.2.0Rel-4DSCH-related additions to Handover scenariosR3-020603agreedRP-020177approved4.3.0
25.931001613.5.0R1999DSCH-related additions to Handover scenariosR3-020602agreedRP-020177approved3.6.0
25.9310015-4.2.0Rel-4Corrections and updatesR3-020308agreedRP-020177approved4.3.0
25.9310014-3.5.0R1999Corrections and updatesR3-020307agreedRP-020177approved3.6.0
25.931001214.1.0Rel-4Obsolete or Missing MessagesR3-013492agreedRP-010868approved4.2.0
25.931001113.4.0R1999Obsolete or Missing MessagesR3-013491agreedRP-010868approved3.5.0
25.9310010-4.0.0Rel-4Correction to RAB Release ProceduresR3-011361agreedRP-010387approved4.1.0
25.9310009-3.3.0R1999Correction to RAB Release ProceduresR3-011360agreedRP-010387approved3.4.0
25.931000813.2.0R1999Service based intersystem handover and directed retry procedureR3-011077agreedRP-010130approved4.0.0
25.9310008-3.2.0Rel-4Service based intersystem handover and directed retry procedureR3-011077agreedRP-010130revised 
25.931000713.2.0Rel-4Introduction of Q.2630.2R3-010662agreedRP-010162approved4.0.0
25.931000613.2.0Rel-4Introduction of the Modification Procedure of Q.2630.2R3-010673agreedRP-010163approved4.0.0
25.9310004-3.1.0R1999Editorial correction to 25.931R3-002494agreedRP-000633approved3.2.0
25.931000313.0.0R1999Correction of timing and message nameR3-002201agreedRP-000392approved3.1.0
25.931000213.0.0R1999Introduction of new scenarios related to channel switching over IurR3-001876agreedRP-000392approved3.1.0
25.931000113.0.0R1999Corrections to a minor mistake present in the spec.R3-001875agreedRP-000392approved3.1.0