• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 18 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
32.2950013114.0.0Rel-15Rel-15 CR 32.295 Release Version handling for Rel-15 and aboveS5-182363agreedSP-180429approved15.0.0
32.2950013-14.0.0Rel-15Rel-15 CR 32.295 Release Version handling for Rel-15 and aboveS5-182311revised   
32.2950012113.0.0Rel-14Rel-14 CR 32.295 Remove reference to RFC 3588S5-171290agreedSP-170138approved14.0.0
32.2950012-13.0.0Rel-14Rel-14 CR 32.295 Remove reference to RFC 3588S5-171178revised   
32.2950011-13.0.0Rel-13Rel-13 CR 32.295 Alignement with drafting rules for DefinitionsS5-162176not pursued   
32.2950010-12.1.0Rel-12Rel-12 CR 32.295 Corrections on definition for parameter categoryS5-146057agreedSP-140805approved12.2.0
32.2950009-12.1.0Rel-12Rel-12 CR 32.295 Additional corrections for removal of I-WLAN solutionS5-145121agreedSP-140805approved12.2.0
32.2950008112.0.1Rel-12Rel-12 CR 32.295 Corrections for alignment between charging specificationsS5-144456agreedSP-140564approved12.1.0
32.2950008-12.0.1Rel-12Rel-12 CR 32.295 Editorial corrections on references and definitionsS5-144147revised-  
32.2950007111.0.0Rel-12R12 CR 32.295 Justification on usage of Sequence numbersS5-131372agreedSP-130435approved12.0.0
32.2950007-11.0.0Rel-12R12 CR 32.295 Justification on usage of Sequence numbersS5-131183revised-  
32.29500061 Rel-10CR R11 32295 Add synchronization mechanisme to release or cancel operations by O&M at the side of CGF and CDFS5-113835withdrawn-  
32.2950006-10.0.0Rel-11CR R11 32295 Add synchronization mechanisme to release or cancel operations by O&M at the side of CGF and CDFS5-113594revised-  
32.2950005-8.0.0Rel-8UDP Port number differenciation between GTPÆv2 and GTPv2S5-093600agreedSP-090536approved8.1.0
32.2950004-7.0.0Rel-8Implication on CDR transfer for EPC ChargingS5-080918agreedSP-080274approved8.0.0
32.2950003-6.0.0Rel-6Correction on the use of ‘reference point’ and ‘interface’ – Align with TR 21.905S5-054286agreedSP-050275approved6.1.0
32.2950002-6.0.0Rel-6Correction to referencesS5-054451agreedSP-050275approved6.1.0
32.2950001-6.0.0Rel-6Correction to scopeS5-054440agreedSP-050275approved6.1.0