• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 12 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
32.5810011-12.0.0Rel-12Rel 12 CR 32.581 Requirements for energy saving management for HNBsS5-145170withdrawn-  
32.5810010210.1.0Rel-10Correction of requirements for HNB non-IPsec usage - alignment with 33.320S5-112139agreedSP-110288approved10.2.0
32.581000929.2.0Rel-9Correction of requirements for HNB non-IPsec usage - alignment with 33.320S5-112135agreedSP-110288approved9.3.0
32.5810008110.0.0Rel-10Add LIPA management requirementsS5-111457agreedSP-110099approved10.1.0
32.5810008-10.0.0Rel-10CR R10 32.581 Add LIPA management requirementsS5-111089revised-  
32.5810007-9.2.0Rel-10Missing Requirement for an operator’s defined time period at the HNBS5-101549agreedSP-100264approved10.0.0
32.5810006-9.1.0Rel-9Correction of file transfer mechanisms in HNB type 1 interfaceS5-100478agreedSP-100035approved9.2.0
32.5810005-8.1.0Rel-8Correction of file transfer mechanisms in HNB type 1 interfaceS5-100477agreedSP-100034approved8.2.0
32.5810004-9.0.0Rel-9New CM, FM & SM specification level requirements for HNB ManagementS5-093528agreedSP-090540approved9.1.0
32.5810003-9.0.0Rel-9Add missing description of AddObject and DeleteObject RPC method in configuration management according to BBF LSS5-093108agreedSP-090534approved9.1.0
32.5810002-8.0.0Rel-8Add missing Description of AddObject and DeleteObject RPC method in configuration management according to BBF LSS5-093107agreedSP-090534approved8.1.0
32.5810001-8.0.0Rel-9Add requirements for HNB informing the HMS of the changes in radio environmentS5-092632agreedSP-090295approved9.0.0