• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 12 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
32.5830012110.1.0Rel-10Add the root CA certificate pre-configuration to the discovery proceduresS5-112562agreedSP-110532approved10.2.0
32.583001119.3.0Rel-9Add the root CA certificate pre-configuration to the discovery proceduresS5-112561agreedSP-110532approved9.4.0
32.5830010110.1.0Rel-10Align the HNB-GW discovery procedure with flow diagramS5-112560agreedSP-110533approved10.2.0
32.583000919.3.0Rel-9Align the HNB-GW discovery procedure with flow diagramS5-112559agreedSP-110533approved9.4.0
32.583000818.1.0Rel-8Align the HNB-GW discovery procedure with flow diagramS5-112558agreedSP-110533approved8.2.0
32.5830007210.0.0Rel-10Correction of procedure flows for HNB non-IPsec usage - alignment with 33.320S5-112140agreedSP-110288approved10.1.0
32.583000629.2.0Rel-9Correction of procedure flows for HNB non-IPsec usage - alignment with 33.320S5-112136agreedSP-110288approved9.3.0
32.5830005-9.1.0Rel-9Correction of errors in clause number reference, figure number reference, and figure numberingS5-094210agreedSP-090723approved9.2.0
32.5830004-8.0.0Rel-8Clarify the meaning of HNB CM procedure flow regarding HNB registrationS5-093490agreedSP-090534approved8.1.0
32.5830003-9.0.0Rel-9Precise the meaning of HNB CM procedure flow via file downloadS5-093150agreedSP-090539approved9.1.0
32.5830002-8.0.0Rel-8Precise the meaning of HNB CM procedure flow via file downloadS5-093110agreedSP-090539approved8.1.0
32.5830001-8.0.0Rel-9Clarify the HNB Configuration Management (CM) procedure flow via file downloadS5-092631agreedSP-090295approved9.0.0