• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 20 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 32.6130018-F9.0.0Rel-9Correcting the Bulk CM IRP CORBA SS - Align with 32.612 IS Details S5e100158   Huawei Details SP-100858 approvedSA#50S59.1.0OAM9
See details 32.6130018-F9.0.0Rel-9Correcting the Bulk CM IRP CORBA SS - Align with 32.612 IS Details S5e100158 agreed Huawei Details SP-100745 revisedSA#50S5 OAM9
See details 32.6130017-F8.0.0Rel-8Increase the linked IS version by the for IS to clarify scope parmaters for upload operation Details S5-094112 agreedSA5#68Motorola Details SP-090718 approvedSA#46S58.1.0OAM8
See details 32.6130016-D7.0.0Rel-8Include reference to SOAP Solution Set specification Details S5-091664  SA5#63Ericsson Details SP-090207 approvedSA#43S58.0.0OAM8
See details 32.6130016-D7.0.0Rel-8Include reference to SOAP Solution Set specification Details S5-091664 agreedSA5#63Ericsson Details SP-090041 reissuedSA#43S5 OAM8
See details 32.6130015-F6.2.0Rel-6Align the CORBA SS IDL with TS 32.150 Style Guide Details S5-056430 agreedSA5#42-BIS Details SP-050461 approvedSA#29S56.3.0 2G
See details 32.6130014-F6.1.0Rel-6Generic System Context, update of reference to IS specification Details S5-056077 agreedSA5#41 Details SP-050045 approvedSA#27S56.2.0
See details 32.6130013-F6.1.0Rel-6IDL incompliant to the style guide Details S5-056071 agreedSA5#41 Details SP-050045 approvedSA#27S56.2.0
See details 32.6130012-B6.0.0Rel-6Add Signalling Transport Network (STN) NRM IRP in BulkCM IRP CORBA SS Details S5-049049 agreedSA5#40 Details SP-040807 approvedSA#26S56.1.0
See details 32.6130011-F6.0.0Rel-6Partition Bulk CM IRP capabilities into separate IDL modules – Align to IS in 32.612 Details S5-047124 agreedSA5#40 Details SP-040807 approvedSA#26S56.1.0
See details 32.6130010-F6.0.0Rel-6Correct mapping of IS-defined non-filterable parameters to SS-defined non-filterable fields - Align with IS in 32.612 Details S5-047123 agreedSA5#40 Details SP-040807 approvedSA#26S56.1.0
See details 32.6130009-F5.0.0Rel-5Add missing Rel-4 CORBA IDL exceptions Details S5-036324 agreed  Details SP-030140 approvedSA#19S55.1.0
See details 32.6130008-F5.0.0Rel-5Add subphases PreactivationPhase and ValidationPhase in ‘BulkCmIRPConstDefs’ IDL definition Details S5-036060 agreedSA5#32-bis Details SP-030140 approvedSA#19S55.1.0
See details 32.6130007-F4.3.0Rel-4Removal of the Concurrency exception in getSessionLog Details S5-026871 agreedSA5#31 Details SP-020745 approvedSA-#18S54.4.0
See details 32.6130006-C4.2.0Rel-5Add Bulk CM IRP CORBA Solution Set Enhancements Rel-5 Details S5-026734 agreedSA5-#30 Details SP-020486 approvedSA-#17S55.0.0
See details 32.6130005-F4.2.0Rel-4Correction of Mapping fallbackEnabled Qualifier Details S5-026689 agreedSA5-#30 Details SP-020485 approvedSA-#17S54.3.0
See details 32.6130004-F4.1.0Rel-4Correction of behaviour for IS parameter saveFallback of IS operation activate Details S5-026076 agreedSA5#27 Details SP-020296 approvedSA-#16S54.2.0
See details 32.6130003-F4.1.0Rel-4Add missing CORBA exceptions and descriptions of CORBA exception usage Details S5-026074 agreedSA5#27 Details SP-020297 approvedSA-#16S54.2.0
See details 32.6130002-F4.0.0Rel-4Corrections to the exceptions in the Bulk CM IRP CORBA Solution Set Details S5-010669 agreedSA5-#23 Details SP-010644 approvedSA-#14S54.1.0
See details 32.6130001-F4.0.0Rel-4Correction of a notification name and Addition of missing table for fallback operation Details S5-010668 agreedSA5-#23 Details SP-010644 approvedSA-#14S54.1.0