• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
12
Next PageLast Page
Page size:
PageSizeComboBox
select
 305 items in 2 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
37.145-20214-16.1.0Rel-16CR to TS 37.145-2: correction of the direction to be tested for the BS demodulation requirements, Rel-16R4-1915013    
37.145-20213-15.5.0Rel-15CR to TS 37.145-2: correction of the direction to be tested for the BS demodulation requirements, Rel-15R4-1915012    
37.145-20212-16.1.0Rel-16CR to TS 37.145-2 - reverberation chamber in-band TRP proceduresR4-1914766    
37.145-20211-15.5.0Rel-15CR to TS 37.145-2 - reverberation chamber in-band TRP proceduresR4-1914765    
37.145-20210-16.1.0Rel-16CR Modulation fallback for total power dynamic range in 37.145-2 clause 6.4.4.4.2.4R4-1914669    
37.145-20209-15.5.0Rel-15CR Modulation fallback for total power dynamic range in 37.145-2 clause 6.4.4.4.2.4R4-1914668    
37.145-20208-16.1.0Rel-16Correction to co-existene and co-loaction spurious emissions applicability rangeR4-1914594    
37.145-20207-15.5.0Rel-15Correction to co-existene and co-loaction spurious emissions applicability rangeR4-1914593    
37.145-20206-16.1.0Rel-16CR to TS 37.145-2: Additional information about alignment needed for TRP measurements in Annex F.1R4-1914524    
37.145-20205-15.5.0Rel-15CR to TS 37.145-2: Additional information about alignment needed for TRP measurements in Annex F.1R4-1914523    
37.145-20204-16.1.0Rel-16CR to TS 37.145-2: Requirement set applicabilityR4-1914269    
37.145-20203-15.5.0Rel-15CR to TS 37.145-2: Requirement set applicabilityR4-1914268    
37.145-20202-16.1.0Rel-16CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2)R4-1914255    
37.145-20201-15.5.0Rel-15CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2R4-1914254    
37.145-20200-16.1.0Rel-16CR to 37.145-2: OTA ACLR R16 (6.7.3)R4-1914008    
37.145-20199-15.5.0Rel-15CR to 37.145-2: OTA ACLR R15 (6.7.3)R4-1914007    
37.145-20198-16.1.0Rel-16CR to TS 37.145-2: Clarification of conformance testing for same beamsR4-1913765    
37.145-20197-15.5.0Rel-15CR to TS 37.145-2: Clarification of conformance testing for same beamsR4-1913764    
37.145-20196-14.9.0Rel-14CR to TS 37.145-2: Clarification of conformance testing for same beamsR4-1913763    
37.145-20195-13.11.0Rel-13CR to TS 37.145-2: Clarification of conformance testing for same beamsR4-1913762    
37.145-20194-16.1.0Rel-16CR to 37.145-2 on Reciever Intermodulation signal offset correctionR4-1913661    
37.145-20193-15.5.0Rel-15CR to 37.145-2 on Reciever Intermodulation signal offset correctionR4-1913660    
37.145-20192-16.1.0Rel-16CR to 37.145-2 on Receiver spurious emission requirementsR4-1913651    
37.145-20191-15.5.0Rel-15CR to 37.145-2 on Receiver spurious emission requirementsR4-1913650    
37.145-20190-16.1.0Rel-16Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.145-2R4-1913221    
37.145-20189-15.5.0Rel-15CR to 37.145-2: OTA ACLR R15 (6.7.3)R4-1911622withdrawn   
37.145-20188-16.0.0Rel-16CR to TS 37.145-2 – single polarisation measurement procedureR4-1909431agreedRP-192054approved16.1.0
37.145-20187115.4.0Rel-15CR to TS 37.145-2 – single polarisation measurement procedureR4-1910442agreedRP-192054approved15.5.0
37.145-20187-15.4.0Rel-15CR to TS 37.145-2 – single polarisation measurement procedureR4-1909430revised   
37.145-20186-16.0.0Rel-16CR to TS 37.145-2 - reverberation chamber in-band TRP proceduresR4-1909427agreedRP-192054approved16.1.0
37.145-20185115.4.0Rel-15CR to TS 37.145-2 - reverberation chamber in-band TRP proceduresR4-1910461agreedRP-192054approved15.5.0
37.145-20185-15.4.0Rel-15CR to TS 37.145-2 - reverberation chamber in-band TRP proceduresR4-1909426revised   
37.145-20184-16.0.0Rel-16CR to TS 37.145-2 – clean up reverberation chamber spurious emissions procedureR4-1909424agreedRP-192054approved16.1.0
37.145-20183115.4.0Rel-15CR to TS 37.145-2 – clean up reverberation chamber spurious emissions procedureR4-1910460agreedRP-192054approved15.5.0
37.145-20183-15.4.0Rel-15CR to TS 37.145-2 – clean up reverberation chamber spurious emissions procedureR4-1909423revised   
37.145-20182-16.0.0Rel-16CR to TS 37.145-2 – Improvements to Annex FR4-1909421agreedRP-192054approved16.1.0
37.145-20181115.4.0Rel-15CR to TS 37.145-2 – Improvements to Annex FR4-1910459agreedRP-192054approved15.5.0
37.145-20181-15.4.0Rel-15CR to TS 37.145-2 – Improvements to Annex FR4-1909420revised   
37.145-20180-16.0.0Rel-16CR to TS 37.145-2 – clarify measurement directions test proceduresR4-1909415agreedRP-192054approved16.1.0
37.145-20179115.4.0Rel-15CR to TS 37.145-2 – clarify measurement directions test proceduresR4-1910453agreedRP-192054approved15.5.0
37.145-20179-15.4.0Rel-15CR to TS 37.145-2 – clarify measurement directions test proceduresR4-1909414revised   
37.145-20178-16.0.0Rel-16CR to TS37.145-2 editorial corrections on G-FRC (section 7.2,7.3,7.4)R4-1908731agreedRP-192019approved16.1.0
37.145-20177115.4.0Rel-15CR to TS37.145-2 editorial corrections on G-FRC (section 7.2,7.3,7.4)R4-1910581agreedRP-192019approved15.5.0
37.145-20177-15.4.0Rel-15CR to TS37.145-2 editorial corrections on G-FRC (section 7.2,7.3,7.4)R4-1908730revised   
37.145-20176-16.0.0Rel-16CR to 37.145-2: correction of equivalent beams testing, Rel-16R4-1909308agreedRP-192050approved16.1.0
37.145-20175-15.4.0Rel-15CR to 37.145-2: correction of equivalent beams testing, Rel-15R4-1909307agreedRP-192050approved15.5.0
37.145-20174-14.8.0Rel-14CR to 37.145-2: correction of equivalent beams testing, Rel-14R4-1909306agreedRP-192050approved14.9.0
37.145-20173-13.10.0Rel-13CR to 37.145-2: correction of equivalent beams testing, Rel-13R4-1909305agreedRP-192050approved13.11.0
37.145-20172116.0.0Rel-16n29 introduction to 37.145-2R4-1910518agreedRP-192034approved16.1.0
37.145-20172-16.0.0Rel-16n29 introduction to 37.145-2R4-1909238revised   
37.145-20171-16.0.0Rel-16CR to TS 37.145-2 editoral corrections on removal of reference to 38.141-2R4-1908995withdrawn   
37.145-20170-15.4.0Rel-15CR to TS 37.145-2 editoral corrections on removal of reference to 38.141-2R4-1908994not pursued   
37.145-20169-16.0.0Rel-16CR to TS 37.145-2 with addition of reference to data content for test modelsR4-1908991agreedRP-192019approved16.1.0
37.145-20168115.4.0Rel-15CR to TS 37.145-2 with addition of reference to data content for test modelsR4-1910449withdrawn   
37.145-20168-15.4.0Rel-15CR to TS 37.145-2 with addition of reference to data content for test modelsR4-1908990agreedRP-192019approved15.5.0
37.145-20167-16.0.0Rel-16CR on Protection of SUL band n89 to TS 37.145-2R4-1908956endorsedRP-192030approved16.1.0
37.145-20166115.4.0Rel-15CR to TS 37.145-2: Additional information about alignment for TRP measurement in Annex F.1R4-1910458withdrawn   
37.145-20166-15.4.0Rel-15CR to TS 37.145-2: Additional information about alignment for TRP measurement in Annex F.1R4-1908764postponed   
37.145-20165-16.0.0Rel-16CR to TS 37.145-2: Additional information about alignment for TRP measurement in Annex F.1R4-1908763withdrawn   
37.145-20164-15.4.0Rel-15CR to 37.145-2: Improvement of RC test procedure in subclause 6.7.6.2.4.2 and subclause 7.7.4.2R4-1908748not pursued   
37.145-20163-16.0.0Rel-16CR to 37.145-2: Improvement of RC test procedure in subclause 6.7.6.2.4.2 and subclause 7.7.4.2R4-1908747withdrawn   
37.145-20162-15.4.0Rel-15CR to TS 37.145-2: Addition of RC test method for output power, ACLR, spectrum mask and OBUE in subclause 6.3.2.4.2, 6.7.3.4.2, 6.7.4.4.2 and 6.7.5.4.2R4-1908744not pursued   
37.145-20161-16.0.0Rel-16CR to TS 37.145-2: Addition of RC test method for output power, ACLR, spectrum mask and OBUE in subclause 6.3.2.4.2, 6.7.3.4.2, 6.7.4.4.2 and 6.7.5.4.2R4-1908743withdrawn   
37.145-20160-16.0.0Rel-16CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2)R4-1908645agreedRP-192019approved16.1.0
37.145-20159-15.4.0Rel-15CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2)R4-1908644agreedRP-192019approved15.5.0
37.145-20158-16.0.0Rel-16CR to TS37.145-2: Corrections on ICS requirement (Section 7.9.5)R4-1908637agreedRP-192019approved16.1.0
37.145-20157115.4.0Rel-15CR to TS37.145-2: Corrections on ICS requirement (Section 7.9.5)R4-1910498agreedRP-192019approved15.5.0
37.145-20157-15.4.0Rel-15CR to TS37.145-2: Corrections on ICS requirement (Section 7.9.5)R4-1908636revised   
37.145-20156-16.0.0Rel-16CR to TS 37.145-2: Correction on SEM and operation band unwanted emissionR4-1908536agreedRP-192019approved16.1.0
37.145-20155-15.4.0Rel-15CR to TS 37.145-2: Correction on SEM and operation band unwanted emissionR4-1908535agreedRP-192019approved15.5.0
37.145-20154-16.0.0Rel-16CR to 37.145-2 on Receiver spurious emission requirements Category BR4-1908451withdrawn   
37.145-20153-15.4.0Rel-15CR to 37.145-2 on Receiver spurious emission requirements Category BR4-1908450postponed   
37.145-20152-16.0.0Rel-16CR to TS 37.145-2: Removal of BS type 2-O in radiated performance requirements for NRR4-1908310agreedRP-192019approved16.1.0
37.145-20151115.4.0Rel-15CR to TS 37.145-2: Removal of BS type 2-O in radiated performance requirements for NRR4-1910494agreedRP-192019approved15.5.0
37.145-20151-15.4.0Rel-15CR to TS 37.145-2: Removal of BS type 2-O in radiated performance requirements for NRR4-1908309revised   
37.145-20150-16.0.0Rel-16CR to TS 37.145-2: Clarification on application of OTA receiver requirements for BS supporting polarizationR4-1908306agreedRP-192054approved16.1.0
37.145-20149-15.4.0Rel-15CR to TS 37.145-2: Clarification on application of OTA receiver requirements for BS supporting polarizationR4-1908305agreedRP-192054approved15.5.0
37.145-20148-16.0.0Rel-16CR for TS37.145-2: definition of synchronization operationR4-1908072agreedRP-192054approved16.1.0
37.145-20147-15.4.0Rel-15CR for TS37.145-2: definition of synchronization operationR4-1908069agreedRP-192054approved15.5.0
37.145-20146-16.0.0Rel-16Correction to RX spurious emissions applicability range for SR E-UTRA BSR4-1908048agreedRP-192054approved16.1.0
37.145-20145115.4.0Rel-15Correction to RX spurious emissions applicability range for SR E-UTRA BSR4-1910455agreedRP-192054approved15.5.0
37.145-20145-15.4.0Rel-15Correction to RX spurious emissions applicability range for SR E-UTRA BSR4-1908047revised   
37.145-20144-16.0.0Rel-16Clarification of test directions declarationsR4-1908041withdrawn   
37.145-20143115.4.0Rel-15Clarification of test directions declarationsR4-1910452withdrawn   
37.145-20143-15.4.0Rel-15Clarification of test directions declarationsR4-1908040not pursued   
37.145-20142-14.8.0Rel-14Clarification of test directions declarationsR4-1908039withdrawn   
37.145-20141113.10.0Rel-13Clarification of test directions declarationsR4-1910450withdrawn   
37.145-20141-13.10.0Rel-13Clarification of test directions declarationsR4-1908038not pursued   
37.145-20140-15.3.0Rel-16Introduction of Band n30 in TS 37.145-2R4-1907841endorsedRP-191247approved16.0.0
37.145-20139-15.3.0Rel-16Introduction of Band n14 in TS 37.145-2R4-1907838endorsedRP-191243approved16.0.0
37.145-20138-15.3.0Rel-16Introduce Band n18 to 37.145-2R4-1907834endorsedRP-191245approved16.0.0
37.145-20137-15.3.0Rel-16CR to 37.145-2: Introduction of n48R4-1907819endorsedRP-191249approved16.0.0
37.145-20136-15.3.0Rel-16CR to 37.145-2: Introduction of Band 87 and 88R4-1907816endorsedRP-191257approved16.0.0
37.145-20135-15.3.0Rel-15Non-AAS CRs mirroring to the AAS specificationR4-1907042agreedRP-191263approved15.4.0
37.145-20134115.3.0Rel-15CR to TS 37.145-2: BS demodulation requirements for NRR4-1907702agreedRP-191263approved15.4.0
37.145-20134-15.3.0Rel-15CR to TS 37.145-2: BS demodulation requirements for NRR4-1907033revised   
37.145-20133-15.3.0Rel-15CR to TS 37.145-2: mirror of operating band and frequency range declaration from NR, Rel-15R4-1907031agreedRP-191258approved15.4.0
37.145-20132-14.7.0Rel-14CR to TS 37.145-2: mirror of operating band and frequency range declaration from NR, Rel-14R4-1907030agreedRP-191258approved14.8.0
37.145-20131-13.9.0Rel-13CR to TS 37.145-2: mirror of operating band and frequency range declaration from NR, Rel-13R4-1907028agreedRP-191258approved13.10.0
37.145-20130-15.3.0Rel-15CR to TS 37.145-2: adding further details to spherical Fibonacci grids (F.4)R4-1906946agreedRP-191236approved15.4.0
37.145-20129-15.3.0Rel-15CR to TS 37.145-2: Clarification on application of OTA receiver requirements for BS supporting polarizationR4-1906914not pursued   
37.145-20128-15.3.0Rel-15CR to TS 37.145-02: TAE requirement (section 6.6.3)R4-1906911not pursued   
37.145-20127115.3.0Rel-15CR to TR 37.145-2 removal of Tx Diversity for TAE testingR4-1907626agreedRP-191236approved15.4.0
37.145-20127-15.3.0Rel-15CR to TR 37.145-2 removal of Tx Diversity for TAE testingR4-1906718revised   
37.145-20126-15.3.0Rel-15CR to TS 37.145-2: Clarification on non-steerable beamR4-1906694not pursued   
37.145-20125-15.3.0Rel-15CR to TS 37.145-2: Correction of Radiated Interface Boundary (RIB) definitionR4-1906692agreedRP-191262approved15.4.0
37.145-20124115.3.0Rel-15TS 37.145-2 Correction on usage of terms TRP and EIRPR4-1907653agreedRP-191262approved15.4.0
37.145-20124-15.3.0Rel-15TS 37.145-2 Correction on usage of terms TRP and EIRPR4-1906691revised   
37.145-20123115.3.0Rel-15CR to TS 37.145-2: Correction to Total Radiated Power definition and Single-band RIBR4-1907700agreedRP-191263approved15.4.0
37.145-20123-15.3.0Rel-15CR to TS 37.145-2: Correction to Total Radiated Power definitionR4-1906688revised   
37.145-20122-15.3.0Rel-15CR to TS 37.145-2: Clarification of TRP methods applicability in Annex FR4-1906682withdrawn   
37.145-20121115.3.0Rel-15CR to TS 37.145-2: Clarifying sensitivity procedureR4-1907695withdrawn   
37.145-20121-15.3.0Rel-15CR to TS 37.145-2: Clarifying sensitivity procedureR4-1906680not pursued   
37.145-20120-15.3.0Rel-15CR to TS 37.145-2: Adjusting use of TRP estimate when correction factors are usedR4-1906679not pursued   
37.145-20119115.3.0Rel-15CR to TS 37.145-2: Improved description of symbol TRP EstimateR4-1907699withdrawn   
37.145-20119-15.3.0Rel-15CR to TS 37.145-2: Improved description of symbol TRP EstimateR4-1906678not pursued   
37.145-20118115.3.0Rel-15CR to TS 37.145-2: Correction to reference to AnnexR4-1907694agreedRP-191262approved15.4.0
37.145-20118-15.3.0Rel-15CR to TS 37.145-2: Correction to reference to AnnexR4-1906675revised   
37.145-20117115.3.0Rel-15CR to TS 37.145-2: Correction to procedure for SEM and OBUER4-1907698withdrawn   
37.145-20117-15.3.0Rel-15CR to TS 37.145-2: Correction to procedure for SEM and OBUER4-1906674not pursued   
37.145-20116115.3.0Rel-16n65 introduction to 37.145-2R4-1907726agreedRP-191250approved16.0.0
37.145-20116-15.3.0Rel-16n65 introduction to 37.145-2R4-1906343revised   
37.145-20115215.3.0Rel-15CR to TS 37.145-2. Clarification of TRP methods applicability in Annex FR4-1907855agreedRP-191263approved15.4.0
37.145-20115115.3.0Rel-15CR to TS 37.145-2. Clarification of TRP methods applicability in Annex FR4-1907697revised   
37.145-20115-15.3.0Rel-15CR to TS 37.145-2. Clarification of TRP methods applicability in Annex FR4-1906186revised   
37.145-20114215.3.0Rel-15CR to TS 37.145-2: Clarification om beam identifier declaration in subclause 4.10R4-1907854agreedRP-191263approved15.4.0
37.145-20114115.3.0Rel-15CR to TS 37.145-2: Clarification om beam identifier declaration in subclause 4.10R4-1907693revised   
37.145-20114-15.3.0Rel-15CR to TS 37.145-2: Clarification om beam identifier declaration in subclause 4.10R4-1906176revised   
37.145-20113115.3.0Rel-15CR to TS 37.145-2: Addition of RC test method for output power, ACLR, spectrum mask and OBUE in subclause 6.3.2.4.2, 6.7.3.4.2, 6.7.4.4.2 and 6.7.5.4.2R4-1907696not pursued   
37.145-20113-15.3.0Rel-15CR to TS 37.145-2: Addition of RC test method for output power, ACLR, spectrum mask and OBUE in subclause 6.3.2.4.2, 6.7.3.4.2, 6.7.4.4.2 and 6.7.5.4.2R4-1906170revised   
37.145-20112-15.3.0Rel-15CR to TS 37.145-2: Addition of RC test method for spurious emissions in subclause 6.7.6 and 7.7.4R4-1906169agreedRP-191263approved15.4.0
37.145-20111-15.3.0Rel-15CR to TS 37.145-2 Correction on multi-band test configurationsR4-1906119agreedRP-191236approved15.4.0
37.145-20110115.3.0Rel-15Correction to out of band blocking requirementR4-1907652agreedRP-191263approved15.4.0
37.145-20110-15.3.0Rel-15Correction to out of band blocking requirementR4-1906085revised   
37.145-20109115.3.0Rel-15Blocking requirement for MSR/NR operationR4-1907649agreedRP-191262approved15.4.0
37.145-20109-15.3.0Rel-15Blocking requirement for MSR/NR operationR4-1906080revised   
37.145-20108115.3.0Rel-15Addition of power backoff for 256QAM and 1024QAMR4-1907648agreedRP-191262approved15.4.0
37.145-20108-15.3.0Rel-15Addition of power backoff for 256QAM and 1024QAMR4-1906079revised   
37.145-20107115.3.0Rel-15Correction on fOOB for 37.145-2R4-1907692agreedRP-191263approved15.4.0
37.145-20107-15.3.0Rel-15Correction on ?fOOB for 37.145-2R4-1905564revised   
37.145-20106-15.3.0Rel-15CR for TS37.145-2: definition of synchronization operationR4-1905447not pursued   
37.145-20105-15.3.0Rel-15Corrections to operation in Band 46 and 49R4-1904606agreedRP-191263approved15.4.0
37.145-20104115.3.0Rel-15CR to TS 37.145-2: Corrections related to TRP measurements in Annex FR4-1905167agreedRP-191236approved15.4.0
37.145-20104-15.3.0Rel-15CR to TS 37.145-2: Corrections related to TRP measurements in Annex FR4-1904397revised   
37.145-20103-15.3.0Rel-15Upper bound on the reference steps for TRP calculationR4-1904217withdrawn   
37.145-20102115.3.0Rel-15Correction of TRP formula in Fibonacci gridR4-1905116withdrawn   
37.145-20102-15.3.0Rel-15Correction of TRP formula in Fibonacci gridR4-1904215revised   
37.145-20101-15.3.0Rel-15Removal of RIB declarationsR4-1904214not pursued   
37.145-20100-15.3.0Rel-15Clarification on beam identifier declarationR4-1904213not pursued   
37.145-20099-15.3.0Rel-15Correction of RIB definitionR4-1904212not pursued   
37.145-20098-15.3.0Rel-15Correction on rated carrier TRPR4-1904211not pursued   
37.145-20097115.3.0Rel-15Clarification on polarizations to be testedR4-1905115agreedRP-191262approved15.4.0
37.145-20097-15.3.0Rel-15Clarification on polarizations to be testedR4-1904210revised   
37.145-20096-15.3.0Rel-15Editorial corrections to TS 37.145-2R4-1904209agreedRP-191236approved15.4.0
37.145-20095115.3.0Rel-15CR to TS37.145-2 Correction on OTA test requirements for spurious emissionsR4-1905161agreedRP-191263approved15.4.0
37.145-20095-15.3.0Rel-15CR to TS37.145-2 Correction on OTA test requirements for spurious emissionsR4-1903577revised   
37.145-20094115.3.0Rel-15CR to TS 37.145-2: Corrections related to TRP measurements in Annex FR4-1905114agreedRP-191236approved15.4.0
37.145-20094-15.3.0Rel-15CR to TS 37.145-2: Corrections related to TRP measurements in Annex FR4-1903463revised   
37.145-20093115.3.0Rel-15CR to TS 37.145-2: updates to Tx spur and Tx co-locationR4-1905113agreedRP-191236approved15.4.0
37.145-20093-15.3.0Rel-15CR to TS 37.145-2: updates to Tx spur and Tx co-locationR4-1903318revised   
37.145-20092115.3.0Rel-15CR to TS 37.145-2: BS demodulation requirements for NRR4-1905163withdrawn   
37.145-20092-15.3.0Rel-15CR to TS 37.145-2: BS demodulation requirements for NRR4-1903315revised   
37.145-20091115.3.0Rel-15CR to TS 37.145-2: clarification on CSA and RCSA relations for hybrid AAS BS, Rel-15R4-1905160agreedRP-191263approved15.4.0
37.145-20091-15.3.0Rel-15CR to TS 37.145-2: clarification on CSA and RCSA relations for hybrid AAS BS, Rel-15R4-1903313revised   
37.145-20090115.3.0Rel-15CR to TS 37.145-2: Corrections on out-of-band blocking requirementsR4-1905158agreedRP-191263approved15.4.0
37.145-20090-15.3.0Rel-15CR to TS 37.145-2: Corrections on out-of-band blocking requirementsR4-1903101revised   
37.145-20089-15.2.0Rel-15OTA Co-location blocking and TX intermodulation for dual polarized BSR4-1901998not pursued   
37.145-20088315.2.0Rel-15CR to TS 37.145-2: new Rel-15 bands and isolation of band 49, Rx, Rel-15R4-1902587agreedRP-190419approved15.3.0
37.145-20088215.2.0Rel-15CR to TS 37.145-2: new Rel-15 bands and isolation of band 49, Rx, Rel-15R4-1902585revised   
37.145-20088115.2.0Rel-15CR to TS 37.145-2: new Rel-15 bands and isolation of band 49, Rx, Rel-15R4-1902304revised   
37.145-20088-15.2.0Rel-15CR to TS 37.145-2: new Rel-15 bands and isolation of band 49, Rx, Rel-15R4-1901739revised   
37.145-20087215.2.0Rel-15CR to TS 37.145-2: new Rel-15 bands and isolation of band 49, Tx, Rel-15R4-1902584agreedRP-190419approved15.3.0
37.145-20087115.2.0Rel-15CR to TS 37.145-2: new Rel-15 bands and isolation of band 49, Tx, Rel-15R4-1902303revised   
37.145-20087-15.2.0Rel-15CR to TS 37.145-2: new Rel-15 bands and isolation of band 49, Tx, Rel-15R4-1901738revised   
37.145-20086-15.2.0Rel-15CR to TS 37.145-2: BS Spurious emissions limits for protection of the BS receiver for B28 in Europe, Rel-15R4-1901733agreedRP-190418approved15.3.0
37.145-20085-15.2.0Rel-15CR to TS 37.145-2: Implementation of sTTI for E-UTRA, Rel-15R4-1901729agreedRP-190418approved15.3.0
37.145-20084115.2.0Rel-15CR to TS 37.145-2: Implementation of 1024QAM for E-UTRA, Rel-15R4-1902310agreedRP-190418approved15.3.0
37.145-20084-15.2.0Rel-15CR to TS 37.145-2: Implementation of 1024QAM for E-UTRA, Rel-15R4-1901726revised   
37.145-20083115.2.0Rel-15CR to TS 37.145-2 on Correction of unwanted emissions scalingR4-1902325agreedRP-190419approved15.3.0
37.145-20083-15.2.0Rel-15CR to TS 37.145-2 on Correction of unwanted emissions scalingR4-1901705revised   
37.145-20082-15.2.0Rel-15CR to TS 37.145-2: additional reference angular step criteria in Annex F.2.2R4-1901558agreedRP-190418approved15.3.0
37.145-20081-15.2.0Rel-15CR to TS 37.145-2 - update emissions scalingR4-1901551not pursued   
37.145-20080315.2.0Rel-15TS 37.145-2: Editorial correctionsR4-1902712agreedRP-190419approved15.3.0
37.145-20080215.2.0Rel-15TS 37.145-2: Editorial correctionsR4-1902581revised   
37.145-20080115.2.0Rel-15TS 37.145-2: Editorial correctionsR4-1902307revised   
37.145-20080-15.2.0Rel-15TS 37.145-2: Editorial correctionsR4-1901542revised   
37.145-20079-15.2.0Rel-15CR to TS 37.145-2: Tx OFF and transient measurement procedure alignment with NRR4-1901509revised   
37.145-20078115.2.0Rel-15CR to TS 37.145-2: Corrections to acceptable uncertainty of test system (4.1.2)R4-1902317agreedRP-190419approved15.3.0
37.145-20078-15.2.0Rel-15CR to TS 37.145-2: Corrections to acceptable uncertainty of test system (4.1.2)R4-1901508revised   
37.145-20077115.2.0Rel-15CR to TS 37.145-2: Intermodulation product bandwidth in Tx IMD test (Rel-15)R4-1902318agreedRP-190419approved15.3.0
37.145-20077-15.2.0Rel-15CR to TS 37.145-2: Intermodulation product bandwidth in Tx IMD test (Rel-15)R4-1901507revised   
37.145-20076-15.2.0Rel-15CR to TS 37.145-2: Corrections on blocking requirementsR4-1901471agreedRP-190418approved15.3.0
37.145-20075115.2.0Rel-15Correction to TDD OFF power requirementR4-1902316agreedRP-190419approved15.3.0
37.145-20075-15.2.0Rel-15Correction to TDD OFF power requirementR4-1900997revised   
37.145-20074115.2.0Rel-15Addition of measurement system setup for radiated performance requirementsR4-1902320agreedRP-190419approved15.3.0
37.145-20074-15.2.0Rel-15Addition of measurement system setup for radiated performance requirementsR4-1900993revised   
37.145-20073115.2.0Rel-15Correction to definition of OTA reference sensitivityR4-1902311agreedRP-190418approved15.3.0
37.145-20073-15.2.0Rel-15Correction to definition of OTA reference sensitivityR4-1900990revised   
37.145-20072-15.2.0Rel-15CR to TS 37.145-2:protection of DTTR4-1900889not pursued   
37.145-20071215.2.0Rel-15CR to TS37.145-2 Correction on OTA test requirementsR4-1902582agreedRP-190419approved15.3.0