| 38.213 | 0331 | - | 17.1.0 | Rel-17 | Corrections on further Multi-RAT Dual-Connectivity enhancements |
R1-2205683
| agreed | RP-221614 | approved | 17.2.0 |
| 38.213 | 0330 | - | 17.1.0 | Rel-17 | Corrections on small data transmission in RRC_INACTIVE state for NR |
R1-2205675
| agreed | RP-221618 | approved | 17.2.0 |
| 38.213 | 0329 | - | 17.1.0 | Rel-17 | Corrections on the introduction of UEs with reduced capabilities in NR |
R1-2205674
| agreed | RP-221605 | approved | 17.2.0 |
| 38.213 | 0328 | - | 17.1.0 | Rel-17 | Corrections on non-terrestrial network operation in NR |
R1-2205673
| agreed | RP-221603 | approved | 17.2.0 |
| 38.213 | 0327 | - | 17.1.0 | Rel-17 | Corrections on dynamic spectrum sharing enhancements in NR |
R1-2205672
| agreed | RP-221613 | approved | 17.2.0 |
| 38.213 | 0326 | - | 17.1.0 | Rel-17 | Corrections on further enhancements on MIMO for NR |
R1-2205671
| agreed | RP-221600 | approved | 17.2.0 |
| 38.213 | 0325 | - | 17.1.0 | Rel-17 | Corrections on eIAB |
R1-2205670
| agreed | RP-221610 | approved | 17.2.0 |
| 38.213 | 0324 | - | 17.1.0 | Rel-17 | Corrections on UE power savings enhancements in NR |
R1-2205651
| agreed | RP-221606 | approved | 17.2.0 |
| 38.213 | 0323 | - | 17.1.0 | Rel-17 | Corrections on sidelink enhancements in NR |
R1-2205650
| agreed | RP-221611 | approved | 17.2.0 |
| 38.213 | 0322 | - | 17.1.0 | Rel-17 | Corrections on the introduction of multicast-broadcast services in NR |
R1-2205649
| agreed | RP-221612 | approved | 17.2.0 |
| 38.213 | 0321 | - | 17.1.0 | Rel-17 | Corrections on IIoT/URLLC enhancements in NR |
R1-2205648
| agreed | RP-221602 | approved | 17.2.0 |
| 38.213 | 0320 | - | 17.1.0 | Rel-17 | Corrections on extending NR operation to 71 GHz |
R1-2205647
| agreed | RP-221601 | approved | 17.2.0 |
| 38.213 | 0319 | - | 17.1.0 | Rel-17 | Rel-16 editorial corrections for TS 38.213 (mirrored to Rel-17) |
R1-2205646
| agreed | RP-221599 | approved | 17.2.0 |
| 38.213 | 0318 | - | 16.9.0 | Rel-16 | Rel-16 editorial corrections for TS 38.213 |
R1-2205645
| agreed | RP-221599 | approved | 16.10.0 |
| 38.213 | 0317 | 1 | 17.1.0 | Rel-17 | HARQ-ACK multiplexing on PUSCH in the absence of PUCCH |
| | RP-221710 | withdrawn | |
| 38.213 | 0317 | - | 17.1.0 | Rel-17 | Correction for HARQ-ACK multiplexing on PUSCH in the absence of PUCCH |
R1-2205629
| agreed | RP-221620 | approved | 17.2.0 |
| 38.213 | 0316 | 1 | 16.9.0 | Rel-16 | HARQ-ACK multiplexing on PUSCH in the absence of PUCCH |
| | RP-221709 | withdrawn | |
| 38.213 | 0316 | - | 16.9.0 | Rel-16 | Correction for HARQ-ACK multiplexing on PUSCH in the absence of PUCCH |
R1-2205628
| agreed | RP-221620 | approved | 16.10.0 |
| 38.213 | 0315 | - | 17.1.0 | Rel-17 | CR on Interlace determination to support R17 intra-UE multiplexing in unlicensed band |
R1-2205580
| withdrawn | | | |
| 38.213 | 0314 | - | 17.1.0 | Rel-17 | Correction on SL HARQ-ACK reporting |
R1-2205396
| agreed | RP-221597 | approved | 17.2.0 |
| 38.213 | 0313 | - | 16.9.0 | Rel-16 | Correction on SL HARQ-ACK reporting |
R1-2205395
| agreed | RP-221597 | approved | 16.10.0 |
| 38.213 | 0312 | - | 17.1.0 | Rel-17 | Timeline requirement for retransmit MSG1/MSGA |
R1-2205389
| agreed | RP-221620 | approved | 17.2.0 |
| 38.213 | 0311 | - | 16.9.0 | Rel-16 | Timeline requirement for retransmit MSG1/MSGA |
R1-2205388
| agreed | RP-221620 | approved | 16.10.0 |
| 38.213 | 0310 | - | 15.14.0 | Rel-15 | Timeline requirement for retransmitting MSG1 |
R1-2205387
| agreed | RP-221596 | approved | 15.15.0 |
| 38.213 | 0309 | - | 17.1.0 | Rel-17 | Correction on PDCCH reception with last symbol aligning with the first symbol of UL CI for Rel-17 |
R1-2205349
| agreed | RP-221598 | approved | 17.2.0 |
| 38.213 | 0308 | - | 16.9.0 | Rel-16 | Correction on PDCCH reception with last symbol aligning with the first symbol of UL CI for Rel-16 |
R1-2205348
| agreed | RP-221598 | approved | 16.10.0 |
| 38.213 | 0307 | - | 17.1.0 | Rel-17 | CR on reporting sidelink HARQ-ACK on uplink for SL CG Type 2 PSSCH transmission |
R1-2205300
| agreed | RP-221597 | approved | 17.2.0 |
| 38.213 | 0306 | - | 16.9.0 | Rel-16 | CR on reporting sidelink HARQ-ACK on uplink for SL CG Type 2 PSSCH transmission |
R1-2205299
| agreed | RP-221597 | approved | 16.10.0 |
| 38.213 | 0305 | - | 17.1.0 | Rel-17 | Correction on Rel-16 SRS power control with 2-step RACH |
R1-2205275
| agreed | RP-221619 | approved | 17.2.0 |
| 38.213 | 0304 | - | 16.9.0 | Rel-16 | Correction on Rel-16 SRS power control with 2-step RACH |
R1-2205274
| agreed | RP-221619 | approved | 16.10.0 |
| 38.213 | 0303 | - | 17.0.0 | Rel-17 | Corrections on small data transmission in RRC_INACTIVE state for NR |
R1-2202987
| agreed | RP-220270 | approved | 17.1.0 |
| 38.213 | 0302 | - | 17.0.0 | Rel-17 | Corrections on the introduction of UEs with reduced capabilities in NR |
R1-2202986
| agreed | RP-220255 | approved | 17.1.0 |
| 38.213 | 0301 | - | 17.0.0 | Rel-17 | Corrections on positioning enhancements in NR |
R1-2202985
| agreed | RP-220254 | approved | 17.1.0 |
| 38.213 | 0300 | - | 17.0.0 | Rel-17 | Corrections on non-terrestrial network operation in NR |
R1-2202984
| agreed | RP-220253 | approved | 17.1.0 |
| 38.213 | 0299 | - | 17.0.0 | Rel-17 | Corrections on dynamic spectrum sharing enhancements in NR |
R1-2202983
| agreed | RP-220264 | approved | 17.1.0 |
| 38.213 | 0298 | - | 17.0.0 | Rel-17 | Introduction of carrier BW smaller than 40 MHz for n79 |
R1-2202982
| agreed | RP-220271 | approved | 17.1.0 |
| 38.213 | 0297 | - | 17.0.0 | Rel-17 | Corrections on further enhancements on MIMO for NR |
R1-2202981
| agreed | RP-220250 | approved | 17.1.0 |
| 38.213 | 0296 | - | 17.0.0 | Rel-17 | Corrections on eIAB |
R1-2202980
| agreed | RP-220261 | approved | 17.1.0 |
| 38.213 | 0295 | - | 17.0.0 | Rel-17 | Corrections on UE power savings enhancements in NR |
R1-2202953
| agreed | RP-220256 | approved | 17.1.0 |
| 38.213 | 0294 | - | 17.0.0 | Rel-17 | Corrections on sidelink enhancements in NR |
R1-2202952
| agreed | RP-220262 | approved | 17.1.0 |
| 38.213 | 0293 | - | 17.0.0 | Rel-17 | Corrections on the introduction of multicast-broadcast services in NR |
R1-2202951
| agreed | RP-220263 | approved | 17.1.0 |
| 38.213 | 0292 | - | 17.0.0 | Rel-17 | Corrections on IIoT/URLLC enhancements in NR |
R1-2202950
| agreed | RP-220252 | approved | 17.1.0 |
| 38.213 | 0291 | - | 17.0.0 | Rel-17 | Corrections on extending NR operation to 71 GHz |
R1-2202949
| agreed | RP-220251 | approved | 17.1.0 |
| 38.213 | 0290 | - | 17.0.0 | Rel-17 | Corrections on coverage enhancements in NR |
R1-2202948
| agreed | RP-220257 | approved | 17.1.0 |
| 38.213 | 0289 | - | 17.0.0 | Rel-17 | Rel-16 editorial corrections for TS 38.213 (mirrored to Rel-17) |
R1-2202945
| agreed | RP-220249 | approved | 17.1.0 |
| 38.213 | 0288 | - | 16.8.0 | Rel-16 | Rel-16 editorial corrections for TS 38.213 |
R1-2202944
| agreed | RP-220249 | approved | 16.9.0 |
| 38.213 | 0287 | - | 17.0.0 | Rel-17 | Clarification of the SPS PDSCH activation and HARQ-ACK transmission for the 1st SPS PDSCH |
R1-2202899
| agreed | RP-220246 | approved | 17.1.0 |
| 38.213 | 0286 | - | 16.8.0 | Rel-16 | Clarification of the SPS PDSCH activation and HARQ-ACK transmission for the 1st SPS PDSCH |
R1-2202898
| agreed | RP-220246 | approved | 16.9.0 |
| 38.213 | 0285 | - | 17.0.0 | Rel-17 | CR on properties of tdd-UL-DL-ConfigurationDedicated and tdd-UL-DL-configurationDedicated-IAB-MT |
R1-2202820
| agreed | RP-220272 | approved | 17.1.0 |
| 38.213 | 0284 | - | 16.8.0 | Rel-16 | CR on properties of tdd-UL-DL-ConfigurationDedicated and tdd-UL-DL-configurationDedicated-IAB-MT |
R1-2202819
| agreed | RP-220272 | approved | 16.9.0 |
| 38.213 | 0283 | - | 17.0.0 | Rel-17 | Corrections on HARQ-ACK timing parameters for Rel-17 |
R1-2202806
| agreed | RP-220247 | approved | 17.1.0 |
| 38.213 | 0282 | - | 16.8.0 | Rel-16 | Corrections on HARQ-ACK timing parameters for Rel-16 |
R1-2202805
| agreed | RP-220247 | approved | 16.9.0 |
| 38.213 | 0281 | - | 17.0.0 | Rel-17 | CR on UE procedure for receiving HARQ-ACK on sidelink |
R1-2202689
| agreed | RP-220245 | approved | 17.1.0 |
| 38.213 | 0280 | - | 16.8.0 | Rel-16 | CR on UE procedure for receiving HARQ-ACK on sidelink |
R1-2202688
| agreed | RP-220245 | approved | 16.9.0 |
| 38.213 | 0279 | - | 16.7.0 | Rel-17 | Introduction of sidelink enhancements in NR |
R1-2112988
| agreed | RP-212978 | approved | 17.0.0 |
| 38.213 | 0278 | - | 16.7.0 | Rel-17 | Introduction of small data transmission in RRC_INACTIVE state for NR |
R1-2112987
| agreed | RP-213524 | approved | 17.0.0 |
| 38.213 | 0277 | - | 16.7.0 | Rel-17 | Introduction of further enhancements on MIMO for NR |
R1-2112986
| agreed | RP-212966 | approved | 17.0.0 |
| 38.213 | 0276 | - | 16.7.0 | Rel-17 | Introduction of UE power savings enhancements in NR |
R1-2112936
| agreed | RP-212972 | approved | 17.0.0 |
| 38.213 | 0275 | - | 16.7.0 | Rel-17 | Introduction of UEs with reduced capabilities in NR |
R1-2112935
| agreed | RP-212971 | approved | 17.0.0 |
| 38.213 | 0274 | - | 16.7.0 | Rel-17 | Introduction of non-terrestrial network operation in NR |
R1-2112934
| agreed | RP-212969 | approved | 17.0.0 |
| 38.213 | 0273 | - | 16.7.0 | Rel-17 | Introduction of multicast-broadcast services in NR |
R1-2112933
| agreed | RP-212979 | approved | 17.0.0 |
| 38.213 | 0272 | - | 16.7.0 | Rel-17 | Introduction of IIoT/URLLC enhancements in NR |
R1-2112932
| agreed | RP-212968 | approved | 17.0.0 |
| 38.213 | 0271 | - | 16.7.0 | Rel-17 | Introduction for extending NR operation to 71 GHz |
R1-2112931
| agreed | RP-212967 | approved | 17.0.0 |
| 38.213 | 0270 | - | 16.7.0 | Rel-17 | Introduction of R17 eIAB |
R1-2112930
| agreed | RP-212977 | approved | 17.0.0 |
| 38.213 | 0269 | - | 16.7.0 | Rel-17 | Introduction of dynamic spectrum sharing enhancements in NR |
R1-2112929
| agreed | RP-212980 | approved | 17.0.0 |
| 38.213 | 0268 | - | 16.7.0 | Rel-17 | Introduction of coverage enhancements in NR |
R1-2112928
| agreed | RP-212973 | approved | 17.0.0 |
| 38.213 | 0267 | 1 | 16.7.0 | Rel-16 | Rel-16 editorial corrections for TS 38.213 |
R1-2112870
| agreed | RP-212964 | approved | 16.8.0 |
| 38.213 | 0267 | - | 16.7.0 | Rel-16 | Rel-16 editorial corrections for TS 38.213 |
R1-2112865
| revised | | | |
| 38.213 | 0266 | - | 16.7.0 | Rel-16 | PUCCH multiplexing with SPS HARQ-ACK or SR within a sub-slot |
R1-2112861
| agreed | RP-212960 | approved | 16.8.0 |
| 38.213 | 0265 | - | 16.7.0 | Rel-16 | CR on TS 38.213 on frequency hopping for PUCCH |
R1-2112822
| agreed | RP-212961 | approved | 16.8.0 |
| 38.213 | 0264 | - | 16.7.0 | Rel-16 | Clarification on intra-UE prioritization/multiplexing on semi-static symbols |
R1-2112736
| agreed | RP-212960 | approved | 16.8.0 |
| 38.213 | 0263 | - | 16.7.0 | Rel-16 | Correction on priority order in power control for PSFCH |
R1-2112732
| agreed | RP-212959 | approved | 16.8.0 |
| 38.213 | 0262 | - | 16.7.0 | Rel-16 | Clarification on UCI and SL HARQ-ACK |
R1-2112721
| agreed | RP-212959 | approved | 16.8.0 |
| 38.213 | 0261 | - | 16.7.0 | Rel-16 | CR on SL HARQ-ACK feedback reporting to gNB |
R1-2112702
| agreed | RP-212959 | approved | 16.8.0 |
| 38.213 | 0260 | - | 16.7.0 | Rel-16 | Correction on Case 1 dormancy operation with data scheduling |
R1-2112692
| agreed | RP-212962 | approved | 16.8.0 |
| 38.213 | 0259 | - | 16.6.0 | Rel-16 | Correction on HARQ-ACK timing |
R1-2108667
| agreed | RP-211843 | approved | 16.7.0 |
| 38.213 | 0258 | - | 16.6.0 | Rel-16 | Editorial corrections for TS 38.213 |
R1-2108595
| agreed | RP-211850 | approved | 16.7.0 |
| 38.213 | 0257 | - | 16.6.0 | Rel-16 | CR for SPS Release and SPS PDSCH Receptions with Slot Aggregation |
R1-2108534
| agreed | RP-211843 | approved | 16.7.0 |
| 38.213 | 0256 | - | 16.6.0 | Rel-16 | Correction on HARQ reporting for multiple pools with PSFCH |
R1-2108496
| agreed | RP-211842 | approved | 16.7.0 |
| 38.213 | 0255 | - | 16.6.0 | Rel-16 | Correction of SL HARQ-ACK reporting on UL for skipped DG |
R1-2108455
| agreed | RP-211842 | approved | 16.7.0 |
| 38.213 | 0254 | - | 16.6.0 | Rel-16 | Corrections on Sub-slot Based HARQ-ACK Feedback for MAC CE Activation/deactivation |
R1-2108453
| agreed | RP-211843 | approved | 16.7.0 |
| 38.213 | 0253 | - | 16.6.0 | Rel-16 | Clarification on PUCCH Power control |
R1-2108445
| agreed | RP-211842 | approved | 16.7.0 |
| 38.213 | 0252 | - | 16.6.0 | Rel-16 | CR on Simultaneous NR SL and LTE SL Operation |
R1-2108443
| agreed | RP-211842 | approved | 16.7.0 |
| 38.213 | 0251 | 1 | 16.6.0 | Rel-16 | Correction on overlapping between SPS HARQ-ACK with HP and SPS HARQ-ACK with LP |
R1-2108659
| agreed | RP-211843 | approved | 16.7.0 |
| 38.213 | 0251 | - | 16.6.0 | Rel-16 | Correction on overlapping between SPS HARQ-ACK with HP and SPS HARQ-ACK with LP |
R1-2108441
| revised | | | |
| 38.213 | 0250 | 1 | 16.6.0 | Rel-16 | Corrections on SCell dormancy indication |
R1-2108510
| agreed | RP-211846 | approved | 16.7.0 |
| 38.213 | 0250 | - | 16.6.0 | Rel-16 | Corrections on SCell dormancy indication |
R1-2108418
| revised | | | |
| 38.213 | 0249 | - | 16.6.0 | Rel-16 | Correction on synchronization procedure for sidelink transmission |
R1-2108408
| agreed | RP-211842 | approved | 16.7.0 |
| 38.213 | 0248 | - | 16.6.0 | Rel-16 | CR on number of received PDSCHs for multi-TRP transmission |
R1-2108401
| agreed | RP-211844 | approved | 16.7.0 |
| 38.213 | 0247 | - | 16.6.0 | Rel-16 | Parameter name correction for PSSCH power control |
R1-2108400
| agreed | RP-211842 | approved | 16.7.0 |
| 38.213 | 0246 | - | 16.6.0 | Rel-16 | Clarification on SL power control and SL type-1 HARQ-ACK codebook in out of coverage case |
R1-2108375
| agreed | RP-211842 | approved | 16.7.0 |
| 38.213 | 0245 | - | 16.5.0 | Rel-16 | CR on clarification for reference point of sub-slot based PUCCH resource |
R1-2106375
| agreed | RP-211236 | approved | 16.6.0 |
| 38.213 | 0244 | - | 16.5.0 | Rel-16 | CR on correction for sub-slot based PUCCH |
R1-2106374
| agreed | RP-211236 | approved | 16.6.0 |
| 38.213 | 0243 | - | 16.5.0 | Rel-16 | Correction on value of 1-bit counter DAI |
R1-2106363
| agreed | RP-211252 | approved | 16.6.0 |
| 38.213 | 0242 | - | 16.5.0 | Rel-16 | Correction on Type-1 HARQ-ACK codebook |
R1-2106362
| agreed | RP-211236 | approved | 16.6.0 |
| 38.213 | 0241 | - | 16.5.0 | Rel-16 | Handling collision between PUCCH/PUSCH and semi-static DL symbols and SSBs |
R1-2106360
| agreed | RP-211236 | approved | 16.6.0 |
| 38.213 | 0240 | - | 16.5.0 | Rel-16 | Correction on half-duplex operation in CA with unpaired spectrum |
R1-2106346
| agreed | RP-211240 | approved | 16.6.0 |
| 38.213 | 0239 | - | 16.5.0 | Rel-16 | Correction on UL cancellation due to DCI format 2_0 |
R1-2106303
| agreed | RP-211240 | approved | 16.6.0 |
| 38.213 | 0238 | - | 15.13.0 | Rel-15 | Correction on UL cancellation due to DCI format 2_0 |
R1-2106302
| agreed | RP-211233 | approved | 15.14.0 |
| 38.213 | 0237 | - | 16.5.0 | Rel-16 | Correction of SL HARQ-ACK reporting on UL for SL CG type 2 |
R1-2106258
| agreed | RP-211235 | approved | 16.6.0 |
| 38.213 | 0236 | - | 16.5.0 | Rel-16 | Correction of SL HARQ-ACK reporting when SL feedback is not used |
R1-2106257
| agreed | RP-211235 | approved | 16.6.0 |
| 38.213 | 0235 | - | 16.5.0 | Rel-16 | Initial UL BWP size restriction for NR-U |
R1-2106252
| agreed | RP-211234 | approved | 16.6.0 |
| 38.213 | 0234 | - | 16.5.0 | Rel-16 | Correction on HARQ-ACK codebook RRC parameter |
R1-2106207
| agreed | RP-211234 | approved | 16.6.0 |
| 38.213 | 0233 | - | 16.5.0 | Rel-16 | Correction on simultaneous multi-CC TCI indication for CORESET |
R1-2106138
| agreed | RP-211237 | approved | 16.6.0 |
| 38.213 | 0232 | - | 16.5.0 | Rel-16 | Corrections for the multiplexing SL HARQ-ACK information on a PUSCH |
R1-2106017
| agreed | RP-211235 | approved | 16.6.0 |
| 38.213 | 0231 | - | 16.5.0 | Rel-16 | Correction on joint search space set group switching across multiple cells |
R1-2105071
| not pursued | | | |
| 38.213 | 0230 | - | 16.5.0 | Rel-16 | Correction on UE procedure for determining physical downlink control channel assignment for Rel-16 PDCCH monitoring capability |
R1-2104134
| agreed | RP-211236 | approved | 16.6.0 |
| 38.213 | 0229 | 1 | 16.5.0 | Rel-16 | Rel-16 editorial corrections for TS 38.213 |
R1-2106351
| agreed | RP-211243 | approved | 16.6.0 |
| 38.213 | 0229 | - | 16.5.0 | Rel-16 | Rel-16 editorial corrections for TS 38.213 |
R1-2104114
| agreed | | | |
| 38.213 | 0228 | 1 | 16.5.0 | Rel-16 | Rel-15 editorial corrections for TS 38.213 (mirrored to Rel-16) |
R1-2106350
| agreed | RP-211233 | approved | 16.6.0 |
| 38.213 | 0228 | - | 16.5.0 | Rel-16 | Rel-15 editorial corrections for TS 38.213 (mirrored to Rel-16) |
R1-2104113
| agreed | | | |
| 38.213 | 0227 | 1 | 15.13.0 | Rel-15 | Rel-15 editorial corrections for TS 38.213 |
R1-2106349
| agreed | RP-211233 | approved | 15.14.0 |
| 38.213 | 0227 | - | 15.13.0 | Rel-15 | Rel-15 editorial corrections for TS 38.213 |
R1-2104112
| agreed | | | |
| 38.213 | 0226 | - | 16.5.0 | Rel-16 | Correction on UL cancellation due to dynamic SFI |
R1-2104107
| agreed | RP-211236 | approved | 16.6.0 |
| 38.213 | 0225 | - | 16.5.0 | Rel-16 | CR on Number of PUCCH resource sets per PUCCH-config |
R1-2104079
| agreed | RP-211236 | approved | 16.6.0 |
| 38.213 | 0224 | - | 16.5.0 | Rel-16 | CR on not supporting Type 1 HARQ-ACK codebook for sub-slot HARQ-ACK in R16 |
R1-2104078
| agreed | RP-211236 | approved | 16.6.0 |
| 38.213 | 0223 | - | 16.5.0 | Rel-16 | CR on the configuration for one PUCCH-Config with subslotLengthForPUCCH-r16 |
R1-2104077
| agreed | RP-211236 | approved | 16.6.0 |
| 38.213 | 0222 | - | 16.5.0 | Rel-16 | Correction on Prioritization Timeline |
R1-2104075
| agreed | RP-211236 | approved | 16.6.0 |
| 38.213 | 0221 | - | 16.5.0 | Rel-16 | Correction on SR reporting due to consistent LBT failure recovery |
R1-2104071
| agreed | RP-211234 | approved | 16.6.0 |
| 38.213 | 0220 | - | 16.5.0 | Rel-16 | Correction of search space configuration for DCI formats 3_0 and 3_1 |
R1-2104062
| agreed | RP-211235 | approved | 16.6.0 |
| 38.213 | 0219 | - | 16.5.0 | Rel-16 | Conditions for IAB-DU soft resource availability |
R1-2104059
| agreed | RP-211249 | approved | 16.6.0 |
| 38.213 | 0218 | - | 16.5.0 | Rel-16 | CR on the number of pathloss estimates maintained by the UE for SRS for positioning |
R1-2104049
| agreed | RP-211238 | approved | 16.6.0 |
| 38.213 | 0217 | - | 16.5.0 | Rel-16 | Correction on MsgA PUSCH validation for semistatic channel access |
R1-2104030
| agreed | RP-211234 | approved | 16.6.0 |
| 38.213 | 0216 | - | 16.5.0 | Rel-16 | Correction on MR-DC Uplink Power Control in 38.213 |
R1-2104019
| agreed | RP-211239 | approved | 16.6.0 |
| 38.213 | 0215 | - | 16.5.0 | Rel-16 | Correction on half-duplex operation in CA with unpaired spectrum |
R1-2104010
| agreed | RP-211240 | approved | 16.6.0 |
| 38.213 | 0214 | - | 16.5.0 | Rel-16 | Corrections for separate HARQ-ACK feedback of multi-TRP transmission |
R1-2104002
| agreed | RP-211237 | approved | 16.6.0 |
| 38.213 | 0213 | - | 16.5.0 | Rel-16 | Corrections for the multiplexing SL HARQ-ACK information on a PUSCH |
R1-2103949
| withdrawn | | | |
| 38.213 | 0212 | - | 16.5.0 | Rel-16 | Corrections for the reference signal used for sidelink power control |
R1-2103948
| agreed | RP-211235 | approved | 16.6.0 |
| 38.213 | 0211 | - | 16.5.0 | Rel-16 | CR to TS 38.213 on clarifying DAPS HO impact on PUCCH repetition counting |
R1-2103940
| agreed | RP-211250 | approved | 16.6.0 |
| 38.213 | 0210 | - | 16.5.0 | Rel-16 | Correction on Type-3 HARQ-ACK codebook size ambiguity |
R1-2103896
| agreed | RP-211234 | approved | 16.6.0 |
| 38.213 | 0209 | - | 16.5.0 | Rel-16 | Correction on multiplexing timeline definition for Type-3 HARQ-ACK codebook |
R1-2103894
| agreed | RP-211234 | approved | 16.6.0 |
| 38.213 | 0208 | - | 16.4.0 | Rel-16 | Resubmission of CR179r1 on Correction on supplementary uplink in 38.213 |
| | RP-210126 | approved | 16.5.0 |
| 38.213 | 0207 | - | 16.4.0 | Rel-16 | Editorial corrections for 38.213 |
R1-2102234
| agreed | RP-210059 | approved | 16.5.0 |
| 38.213 | 0206 | - | 16.4.0 | Rel-16 | Correction on PUCCH resource determination in section 9.2.1 in TS 38.213 |
R1-2102230
| agreed | RP-210051 | approved | 16.5.0 |
| 38.213 | 0205 | - | 16.4.0 | Rel-16 | Resolving collision with semi-static DL and SSB symbols |
R1-2102229
| agreed | RP-210051 | approved | 16.5.0 |
| 38.213 | 0204 | - | 16.4.0 | Rel-16 | Correction on dci-FormatsExt in section 10.1 in TS 38.213 |
R1-2102222
| agreed | RP-210051 | approved | 16.5.0 |
| 38.213 | 0203 | - | 16.4.0 | Rel-16 | 38.213 CR on DCI ordering in a search space set |
R1-2102170
| agreed | RP-210055 | approved | 16.5.0 |
| 38.213 | 0202 | - | 16.4.0 | Rel-16 | CR to 38.213 on HARQ-ACK priority determination for SCell dormancy indication |
R1-2102156
| agreed | RP-210054 | approved | 16.5.0 |
| 38.213 | 0201 | - | 16.4.0 | Rel-16 | CR to 38.213 on PRACH handling for NR-DC power control |
R1-2102155
| agreed | RP-210054 | approved | 16.5.0 |
| 38.213 | 0200 | - | 16.4.0 | Rel-16 | Correction on LBT Type and CP Extension Indication for Semi-Static Channel Occupancy in RAR |
R1-2102121
| agreed | RP-210049 | approved | 16.5.0 |
| 38.213 | 0199 | 1 | 16.4.0 | Rel-16 | Correction of SL HARQ-ACK information reporting to the gNB in Mode 1 |
R1-2102135
| agreed | RP-210050 | approved | 16.5.0 |
| 38.213 | 0199 | - | 16.4.0 | Rel-16 | [Draft] Correction of SL HARQ-ACK information reporting to the gNB in Mode 1 |
R1-2102115
| revised | | | |
| 38.213 | 0198 | - | 16.4.0 | Rel-16 | CR on number of PUCCHs with HARQ-ACK in a slot |
R1-2102105
| agreed | RP-210051 | approved | 16.5.0 |
| 38.213 | 0197 | - | 16.4.0 | Rel-16 | CR on Timing for secondary cell activation / deactivation with sub-slot PUCCH |
R1-2102104
| agreed | RP-210051 | approved | 16.5.0 |
| 38.213 | 0196 | - | 16.4.0 | Rel-16 | Restrictions of the slots for S-SSB transmission/reception |
R1-2102096
| agreed | RP-210050 | approved | 16.5.0 |
| 38.213 | 0195 | - | 16.4.0 | Rel-16 | Determination of indexes for slots for S-SS/PSBCH block transmission(s) |
R1-2102095
| agreed | RP-210050 | approved | 16.5.0 |
| 38.213 | 0194 | - | 16.4.0 | Rel-16 | Corrections related to prioritization between uplink and sidelink |
R1-2102069
| agreed | RP-210050 | approved | 16.5.0 |
| 38.213 | 0193 | - | 16.4.0 | Rel-16 | Correction on uplink Tx switching |
R1-2102057
| agreed | RP-210058 | approved | 16.5.0 |
| 38.213 | 0192 | - | 16.4.0 | Rel-16 | Corrections on Scell BFR in Rel-16 |
R1-2102021
| agreed | RP-210052 | approved | 16.5.0 |
| 38.213 | 0191 | - | 16.4.0 | Rel-16 | Correction on search space set group switching without channel occupancy duration field |
R1-2102010
| agreed | RP-210049 | approved | 16.5.0 |
| 38.213 | 0190 | - | 16.4.0 | Rel-16 | CR on HARQ-ACK |
R1-2102002
| agreed | RP-210052 | approved | 16.5.0 |
| 38.213 | 0189 | - | 16.4.0 | Rel-16 | Correction on PUCCH power control for enhanced Type-2 HARQ-ACK codebook and for Type-3 HARQ-ACK codebook |
R1-2101995
| agreed | RP-210049 | approved | 16.5.0 |
| 38.213 | 0188 | - | 16.4.0 | Rel-16 | Correction of UE reception of DL control when a DCI indicates a request for a Type-3 HARQ-ACK codebook report without scheduling PDSCH |
R1-2101994
| agreed | RP-210049 | approved | 16.5.0 |
| 38.213 | 0187 | - | 16.4.0 | Rel-16 | Correction of Type-3 HARQ-ACK codebook generation for a PDSCH with one transport block for a configuration with a maximum number of two TBs |
R1-2101993
| agreed | RP-210049 | approved | 16.5.0 |
| 38.213 | 0186 | - | 16.4.0 | Rel-16 | Correction for cancellation due to PDSCH/CSI-RS/SFI |
R1-2101991
| agreed | RP-210055 | approved | 16.5.0 |
| 38.213 | 0185 | - | 15.12.0 | Rel-15 | Correction for cancellation due to PDSCH/CSI-RS/SFI |
R1-2101990
| agreed | RP-210047 | approved | 15.13.0 |
| 38.213 | 0184 | - | 16.4.0 | Rel-16 | CR on transmission timing adjustment procedure in 38.213 |
R1-2101965
| agreed | RP-210048 | approved | 16.5.0 |
| 38.213 | 0183 | - | 16.4.0 | Rel-16 | Correction on UCI multiplexing with PUCCH overriding |
R1-2101963
| agreed | RP-210055 | approved | 16.5.0 |
| 38.213 | 0182 | - | 16.4.0 | Rel-16 | Correction on the search space configuration of PUCCH-SCell |
R1-2101936
| agreed | RP-210047 | approved | 16.5.0 |
| 38.213 | 0181 | - | 15.12.0 | Rel-15 | Correction on the search space configuration of PUCCH-SCell |
R1-2101935
| agreed | RP-210047 | approved | 15.13.0 |
| 38.213 | 0180 | - | 16.4.0 | Rel-16 | CR on Type-1 HARQ-ACK for PDSCH repetition with different SCSs in DL and UL |
R1-2101927
| agreed | RP-210055 | approved | 16.5.0 |
| 38.213 | 0179 | 1 | 16.3.0 | Rel-16 | Correction for PUCCH repetitions on SUL |
| | RP-202897 | approved | |
| 38.213 | 0179 | - | 16.3.0 | Rel-16 | Correction for PUCCH repetitions on SUL |
| | RP-202570 | revised | |
| 38.213 | 0178 | - | 16.3.0 | Rel-16 | CR on handling overlapping PUCCH/PUSCH transmissions with repetitions and with different priorities |
R1-2009790
| agreed | RP-202384 | approved | 16.4.0 |
| 38.213 | 0177 | - | 16.3.0 | Rel-16 | Corrections for SCell dormancy indication |
R1-2009755
| agreed | RP-202389 | approved | 16.4.0 |
| 38.213 | 0176 | - | 16.3.0 | Rel-16 | Alignment CR for TS 38.213 |
R1-2009742
| agreed | RP-202398 | approved | 16.4.0 |
| 38.213 | 0175 | - | 16.3.0 | Rel-16 | Correction on remaining channel occupancy assumption |
R1-2009703
| agreed | RP-202381 | approved | 16.4.0 |
| 38.213 | 0174 | - | 16.3.0 | Rel-16 | CR to 38.213 to correct references to 38.212 for RACH procedure |
R1-2009702
| agreed | RP-202381 | approved | 16.4.0 |
| 38.213 | 0173 | - | 16.3.0 | Rel-16 | CR on CBRA based BFR |
R1-2009685
| agreed | RP-202385 | approved | 16.4.0 |
| 38.213 | 0172 | - | 16.3.0 | Rel-16 | Correction on PSFCH and PSCCH mapping |
R1-2009674
| agreed | RP-202383 | approved | 16.4.0 |
| 38.213 | 0171 | - | 16.3.0 | Rel-16 | Correction on periodicity of resource pool bitmap |
R1-2009641
| agreed | RP-202383 | approved | 16.4.0 |
| 38.213 | 0170 | - | 16.3.0 | Rel-16 | Correction on PDCCH monitoring on cell(s) configured with Rel-15 PDCCH monitoring capability |
R1-2009639
| agreed | RP-202384 | approved | 16.4.0 |
| 38.213 | 0169 | - | 16.3.0 | Rel-16 | Correction on UL grant Type 2 PUSCH release for search space sharing |
R1-2009637
| agreed | RP-202384 | approved | 16.4.0 |
| 38.213 | 0168 | - | 16.3.0 | Rel-16 | Correction on Type2 HARQ-ACK codebook construction |
R1-2009636
| agreed | RP-202384 | approved | 16.4.0 |
| 38.213 | 0167 | - | 16.3.0 | Rel-16 | 38.213 CR Correction on HARQ-ACK codebook for secondary PUCCH group |
R1-2009633
| agreed | RP-202389 | approved | 16.4.0 |
| 38.213 | 0166 | - | 16.3.0 | Rel-16 | 38.213 CR for NR-DC power control |
R1-2009632
| agreed | RP-202389 | approved | 16.4.0 |
| 38.213 | 0165 | - | 16.3.0 | Rel-16 | CR to 38.213 on NR-U 2-step RACH PO configuration |
R1-2009628
| agreed | RP-202381 | approved | 16.4.0 |
| 38.213 | 0164 | - | 15.11.0 | Rel-15 | Correction on supplementary uplink in 38.213 |
R1-2009625
| agreed | RP-202379 | approved | 15.12.0 |
| 38.213 | 0163 | - | 16.3.0 | Rel-16 | Correction of NRU HARQ procedure in the presence of SPS PDSCH |
R1-2009611
| agreed | RP-202381 | approved | 16.4.0 |
| 38.213 | 0162 | - | 16.3.0 | Rel-16 | Correction on periodicity of resource pool bitmap |
R1-2009593
| withdrawn | | | |
| 38.213 | 0161 | - | 16.3.0 | Rel-16 | Correction on uplink Tx switching |
R1-2009587
| agreed | RP-202395 | approved | 16.4.0 |
| 38.213 | 0160 | - | 16.3.0 | Rel-16 | Introduction of the preparation time for SL retransmissions in Mode 1 |
R1-2009578
| agreed | RP-202383 | approved | 16.4.0 |
| 38.213 | 0159 | - | 16.3.0 | Rel-16 | Miscellaneous corrections on NR unlicensed configured grant |
R1-2009550
| agreed | RP-202381 | approved | 16.4.0 |
| 38.213 | 0158 | - | 16.3.0 | Rel-16 | Correction on HARQ-ACK generation for DL transmission with single TB when multi-TB is configured |
R1-2009537
| agreed | RP-202379 | approved | 16.4.0 |
| 38.213 | 0157 | - | 15.11.0 | Rel-15 | Correction on HARQ-ACK generation for DL transmission with single TB when multi-TB is configured |
R1-2009536
| agreed | RP-202379 | approved | 15.12.0 |
| 38.213 | 0156 | 1 | 16.3.0 | Rel-16 | Correction on sidelink TDD configuration for OoC Ues |
R1-2009769
| agreed | RP-202383 | approved | 16.4.0 |
| 38.213 | 0156 | - | 16.3.0 | Rel-16 | Correction on sidelink TDD configuration for OoC Ues |
R1-2009531
| revised | | | |
| 38.213 | 0155 | - | 16.3.0 | Rel-16 | Correction on sidelink pathloss calculation for S-SSB power control |
R1-2009520
| agreed | RP-202383 | approved | 16.4.0 |
| 38.213 | 0154 | - | 16.3.0 | Rel-16 | Corrections related to the sidelink slot index |
R1-2009517
| agreed | RP-202383 | approved | 16.4.0 |
| 38.213 | 0153 | - | 16.3.0 | Rel-16 | Corrections for the prioritization between uplink transmission and sidelink transmission/reception |
R1-2009516
| agreed | RP-202383 | approved | 16.4.0 |
| 38.213 | 0152 | - | 16.3.0 | Rel-16 | Corrections on the use of TDRA and FDRA fields SCI for Mode 1 |
R1-2009497
| agreed | RP-202383 | approved | 16.4.0 |
| 38.213 | 0151 | 1 | 16.3.0 | Rel-16 | Correction on intra-frequency DAPS handover |
R1-2009527
| agreed | RP-202388 | approved | 16.4.0 |
| 38.213 | 0151 | - | 16.3.0 | Rel-16 | Correction on intra-frequency DAPS handover |
R1-2009483
| revised | | | |
| 38.213 | 0150 | 1 | 16.3.0 | Rel-16 | Correction on PUSCH processing capability for DAPS handover |
R1-2009526
| agreed | RP-202388 | approved | 16.4.0 |
| 38.213 | 0150 | - | 16.3.0 | Rel-16 | Correction on PUSCH processing capability for DAPS handover |
R1-2009482
| revised | | | |
| 38.213 | 0149 | 1 | 16.3.0 | Rel-16 | Correction on uplink transmission cancellation for DAPS handover |
R1-2009525
| agreed | RP-202388 | approved | 16.4.0 |
| 38.213 | 0149 | - | 16.3.0 | Rel-16 | Correction on uplink transmission cancellation for DAPS handover |
R1-2009481
| revised | | | |
| 38.213 | 0148 | - | 16.3.0 | Rel-16 | Correction on UL power control |
R1-2009458
| agreed | RP-202385 | approved | 16.4.0 |
| 38.213 | 0147 | - | 16.3.0 | Rel-16 | CR on 2-step RACH for 38.213 |
R1-2009446
| agreed | RP-202380 | approved | 16.4.0 |
| 38.213 | 0146 | - | 16.3.0 | Rel-16 | Clarify DCI Format 2_5 search space sets |
R1-2009432
| agreed | RP-202382 | approved | 16.4.0 |