• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 138 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
45.0100081-15.1.0Rel-15Removal of brackets for Multilateration Timing Advance Details R6-200031 agreedRP-200054approved15.2.0
45.0100080-14.4.0Rel-14Removal of brackets for Multilateration Timing Advance Details R6-200030 agreedRP-200054approved14.5.0
45.0100079-15.0.0Rel-15Corrections to BTS / MS synchronization and delay assessment error requirements for EC-GSM-IoT Details R6-190011 agreedRP-190061approved15.1.0
45.0100078-14.3.0Rel-14Corrections to BTS / MS synchronization and delay assessment error requirements for EC-GSM-IoT Details R6-190010 agreedRP-190061approved14.4.0
45.0100077-13.4.0Rel-13Corrections to BTS / MS synchronization and delay assessment error requirements for EC-GSM-IoT Details R6-190009 agreedRP-190061approved13.5.0
45.0100076-14.2.0Rel-14Correction to BTS Reception Accuracy Capability for Multilateration Positioning Details R6-170494 agreedRP-172189approved14.3.0
45.0100075-14.2.0Rel-14Corrections to Timing Advance setting for ESAB, EDAB and Extended AB Details R6-170493 agreedRP-172188approved14.3.0
45.0100074314.1.0Rel-14Corrections to BTS Reception Accuracy Capability for Multilateration Positioning Details R6-170448 agreedRP-171594approved14.2.0
45.0100074214.1.0Rel-14Corrections to BTS Reception Accuracy Capability for Multilateration Positioning Details R6-170443 revised   
45.0100074114.1.0Rel-14Corrections to BTS Reception Accuracy Capability for Multilateration Positioning Details R6-170415 revised   
45.0100074-14.1.0Rel-14Corrections to BTS Reception Accuracy Capability for Multilateration Positioning Details R6-170378 revised   
45.0100073-14.0.0Rel-14Introduction of Multilateration OTD Details R6-170204 merged   
45.0100072-13.3.0Rel-13CR 45.010-0072 Miscellaneous corrections to EC-GSM-IoT (Rel-13) Details R6-160184 agreedRP-162070approved13.4.0
45.0100071614.0.0Rel-14Introduction of Multilateration Details R6-170297 agreedRP-170923approved14.1.0
45.0100071514.0.0Rel-14Introduction of Multilateration Details R6-170268 revised   
45.0100071414.0.0Rel-14Introduction of Multilateration Details R6-170175 revised   
45.0100071313.4.0Rel-14Introduction of Timing Advance Multilateration Details R6-170137 revised   
45.0100071213.4.0Rel-14Introduction of Timing Advance Multilateration Details R6-170107 revised   
45.0100071113.4.0Rel-14Introduction of Timing Advance Multilateration Details R6-170037 revised   
45.0100071-13.3.0Rel-14Introduction of Timing Advance Multilateration Details R6-160160 revised   
45.0100070213.2.0Rel-13Corrections to EC-GSM-IoT Details R6-160118 agreedRP-161392approved13.3.0
45.0100070113.2.0Rel-13Corrections to EC-GSM-IoT Details R6-160075 revised   
45.0100070-13.2.0Rel-13Corrections to EC-GSM-IoT Details R6-160053 revised   
45.0100069213.1.0Rel-13CR 45.010-0069 rev 2 Clarifications and miscellaneous corrections to EC-GSM-IoT (including name change) (Rel-13)  GP-160462approved13.2.0
45.0100069113.1.0Rel-13CR 45.010-0069 rev 1 Clarifications and miscellaneous corrections to EC-GSM-IoT (including name change) (Rel-13)  GP-160444revised 
45.0100069-13.1.0Rel-13CR 45.010-0069 Clarifications and miscellaneous corrections to EC-GSM-IoT (including name change) (Rel-13)  GP-160289revised 
45.0100068-13.0.0Rel-13CR 45.010-0068 Miscellaneous corrections to eDRX (Rel-13)  GP-160100approved13.1.0
45.0100067113.0.0Rel-13CR 45.010-0067 rev 1 Miscellaneous corrections (Rel-13)  GP-160182approved13.1.0
45.0100067-13.0.0Rel-13CR 45.010-0067 Miscellaneous corrections (Rel-13)  GP-160099revised 
45.0100066212.0.0Rel-13CR 45.010-0066 rev 2 Introduction of Power Efficient Operation (Rel-13)  GP-151218approved13.0.0
45.0100066112.0.0Rel-13CR 45.010-0066 rev 1 Introduction of Power Efficient Operation (Rel-13)  GP-151156revised 
45.0100066-12.0.0Rel-13CR 45.010-0066 Introduction of Power Efficient Operation  GP-151142revised 
45.0100065512.0.0Rel-13CR 45.010-0065 rev 5 Introduction of EC-EGPRS (Rel-13)  GP-151216approved13.0.0
45.0100065412.0.0Rel-13CR 45.010-0065 rev 4 Introduction of EC-EGPRS (Rel-13)  GP-151184revised 
45.0100065312.0.0Rel-13CR 45.010-0065 rev 3 Introduction of EC-EGPRS (Rel-13)  GP-151102revised 
45.01000652 Rel-13CR 45.010-0065 rev 2 Introduction of EC-EGPRS (Rel-13)  GPE150078postponed 
45.01000651 Rel-13CR 45.010-0065 rev 1 Introduction of EC-EGPRS (Rel-13)  GPE150055revised 
45.0100065- Rel-13CR 45.010-0065 Introduction of EC-EGPRS (Rel-13)  GPE150038revised 
45.0100064311.0.0Rel-11Impact from rSRVCC from GERAN to E-UTRAN Details GP-121260 agreedGP-121260approved11.1.0
45.01000642 Rel-11Impact from rSRVCC from GERAN to E-UTRAN Details GP-121146 postponed-  
45.01000642 Rel-11Impact from rSRVCC from GERAN to E-UTRAN Details GP-121146 revised-  
45.01000641 Rel-11Impact from rSRVCC from GERAN to E-UTRAN Details GP-121131 revised-  
45.0100064- Rel-11Impact from rSRVCC from GERAN to E-UTRAN Details GP-120928 revised-  
45.0100063-10.1.0Rel-11Synchronization requirements for Local Area multicarrier BTS Details GP-120925 agreedGP-120925approved11.0.0
45.0100062-10.0.0Rel-10DTR Reaction times: removal of square brackets Details GP-110245 agreedGP-110245approved10.1.0
45.010006129.0.0Rel-10Reaction times for DTR Details GP-102064 agreedGP-102064approved10.0.0
45.01000611 Rel-10Reaction times for DTR Details GP-101864 revised-  
45.0100061- Rel-10Reaction times for DTR Details GP-101373 postponed-  
45.0100060-8.4.0Rel-8Modification of PAN Related Reaction Times Details GP-092185 agreedGP-092185approved8.5.0
45.0100059-7.6.0Rel-7Modification of PAN Related Reaction Times Details GP-092160 agreedGP-092160approved7.7.0
45.0100058- Rel-8Modification of PAN Related Reaction Times Details GP-091996 withdrawn-  
45.0100057- Rel-7Modification of PAN Related Reaction TimesModification of PAN Related Reaction Times Details GP-091995 withdrawn-  
45.0100056-8.4.0Rel-9Introduction of MTD reporting on Hyperframe level Details GP-091962 agreedGP-091962approved9.0.0
45.0100055-8.3.0Rel-8Removal of brackets Details GP-090611 agreedGP-090611approved8.4.0
45.0100054-8.2.0Rel-8Corrections to the timing requirements for PS Handover to E-UTRAN Details GP-090148 agreedGP-090148approved8.3.0
45.0100053-8.1.0Rel-8Corrections to the timing requirements for PS Handover to E-UTRAN Details GP-081562 agreedGP-081562approved8.2.0
45.010005228.0.0Rel-8Assignment reaction time when the TTI configuration of a TBF is changed Details GP-081344 agreedGP-081344approved8.1.0
45.01000521 Rel-8Assignment reaction time when the TTI configuration of a TBF is changed Details GP-081299 revised-  
45.0100052- Rel-8Assignment reaction time when the TTI configuration of a TBF is changed Details GP-081056 revised-  
45.010005127.5.0Rel-7Assignment reaction time when the TTI configuration of a TBF is changed Details GP-081343 agreedGP-081343approved7.6.0
45.01000511 Rel-7Assignment reaction time when the TTI configuration of a TBF is changed Details GP-081298 revised-  
45.0100051- Rel-7Assignment reaction time when the TTI configuration of a TBF is changed Details GP-081055 revised-  
45.010005017.4.0Rel-7Clarification to the PDAN reaction times when operating in event based FANR Details GP-080919 agreedGP-080919approved7.5.0
45.0100050- Rel-7Clarification to the PDAN reaction times when operating in event based FANR Details GP-080909 revised-  
45.0100049-7.4.0Rel-7Reduced Latency terminology alignments Details GP-080663 agreedGP-080663approved7.5.0
45.0100048-7.4.0Rel-8Editorial corrections Details GP-080582 agreedGP-080582approved8.0.0
45.010004718.0.0Rel-8Timing requirements for PS Handover to E-UTRAN Details GP-081141 agreedGP-081141approved8.1.0
45.0100047- Rel-8Timing requirements for PS Handover to E-UTRAN Details GP-080581 postponed-  
45.0100046-7.4.0Rel-7Timing requirements for PS Handover to UTRAN Details GP-080580 agreedGP-080580approved7.5.0
45.0100045-6.6.0Rel-6Timing requirements for PS Handover to UTRAN Details GP-080579 agreedGP-080579approved6.7.0
45.010004417.4.0Rel-7Time synchronisation Details GP-080780 agreedGP-080780approved7.5.0
45.0100044- Rel-7Time synchronisation Details GP-080501 revised-  
45.0100043- Rel-7Synchronisation for REDHOT and HUGE Details GP-080131 postponed-  
45.010004217.3.0Rel-7Clarifying Radio Block Specific Reaction Times  GP-080370approved7.4.0
45.0100042- Rel-7Clarifying Radio Block Specific Reaction Times Details GP-080122 revised-  
45.0100041- Rel-7Reduced PUAN Reaction Time Details GP-071834 withdrawn-  
45.0100040- Rel-7Synchronisation for REDHOT and HUGE Details GP-071701 postponed-  
45.010003917.2.0Rel-7Removal of RL-EGPRS TBF mode Details GP-071967 agreedGP-071967approved7.3.0
45.0100039- Rel-7Removal of RL-EGPRS TBF mode Details GP-071677 revised-  
45.010003827.1.0Rel-7Introduction of Reduced Symbol Duration Details GP-071546 agreedGP-071546approved7.2.0
45.01000381 Rel-7Introduction of Reduced Symbol Duration Details GP-071499 revised-  
45.0100038- Rel-7Introduction of Reduced Symbol Duration Details GP-071267 revised-  
45.0100037- Rel-7Introduction of Reduced Symbol Duration Details GP-070818 postponed-  
45.0100036-7.0.0Rel-7PAN Reaction Times Details GP-070716 agreedGP-070716approved7.1.0
45.0100035-6.6.0Rel-7Clarifications and editorial corrections Details GP-070200 agreedGP-070200approved7.0.0
45.0100034210.1.0Rel-11Impact from rSRVCC from GERAN to E-UTRAN Details GP-121146 agreedGP-121146postponed 
45.010003416.5.0Rel-6Introduction of PS handover in TS 45.010 Details GP-052749 agreedGP-052749approved6.6.0
45.0100034- Rel-6Introduction of PS handover in TS 45.010 Details GP-052600 revised-  
45.0100033-6.4.0Rel-6Clarification of MS requirements for synchronization Details GP-050862 agreedGP-050862approved6.5.0
45.0100032-6.3.0Rel-6Timing advance for MBMS Details GP-050289 agreedGP-050289approved6.4.0
45.0100031-6.3.0Rel-6Timing Advance for multiple TBFs in Packet Transfer mode Details GP-050139 agreedGP-050139approved6.4.0
45.010003016.2.0Rel-6Timing Advance behaviour for DTM to Packet Transfer mode transition Details GP-042881 agreedGP-042881approved6.3.0
45.0100030- Rel-6Timing Advance behaviour for DTM to Packet Transfer mode transition Details GP-042455 revised-  
45.0100029- Rel-6Clarification of MS reaction times after receiving an assignment message Details GP-040976 rejected-  
45.010002816.1.0Rel-6MS reaction time upon reception of assignment message on CCCH Details GP-032186 agreedGP-032186approved6.2.0
45.0100028- Rel-6MS reaction time upon reception of assignment message on CCCH Details GP-032047 revised-  
45.010002715.2.0Rel-5MS reaction time upon reception of assignment message on CCCH Details GP-032185 agreedGP-032185approved5.3.0
45.0100027- Rel-5MS reaction time upon reception of assignment message on CCCH Details GP-032046 revised-  
45.0100026- Rel-4MS reaction time upon reception of assignment message on CCCH Details GP-032045 rejected-  
45.010002526.1.0Rel-6Correction of definition of ready to transmit for inter-RAT handover Details GP-032284 agreedGP-032284approved6.2.0
45.01000251 Rel-6Correction of definition of ready to transmit for inter-RAT handover Details GP-032191 revised-  
45.0100025- Rel-6Correction of definition of ready to transmit for inter-RAT handover Details GP-031982 revised-  
45.010002425.2.0Rel-5Correction of definition of ready to transmit for inter-RAT handover Details GP-032283 agreedGP-032283approved5.3.0
45.01000241 Rel-5Correction of definition of ready to transmit for inter-RAT handover Details GP-032190 revised-  
45.0100024- Rel-5Correction of definition of ready to transmit for inter-RAT handover Details GP-031981 revised-  
45.010002324.4.0Rel-4Correction of definition of ready to transmit for inter-RAT handover Details GP-032282 agreedGP-032282approved4.5.0
45.01000231 Rel-4Correction of definition of ready to transmit for inter-RAT handover Details GP-032189 revised-  
45.0100023- Rel-4Correction of definition of ready to transmit for inter-RAT handover Details GP-031980 revised-  
45.010002216.1.0Rel-6Clarification of reaction times for Extended Dynamic Allocation and Shifted USF operation Details GP-032117 agreedGP-032117approved6.2.0
45.0100022- Rel-6Clarification of reaction times for Extended Dynamic Allocation and Shifted USF operation Details GP-031908 revised-  
45.010002115.2.0Rel-5Clarification of reaction times for Extended Dynamic Allocation and Shifted USF operation Details GP-032116 agreedGP-032116approved5.3.0
45.0100021- Rel-5Clarification of reaction times for Extended Dynamic Allocation and Shifted USF operation Details GP-031907 revised-  
45.0100020-6.0.0Rel-6Clarification on USF decoding reaction time on reception of a new assignment Details GP-031547 agreedGP-031547approved6.1.0
45.0100019- Rel-6Correction of definition of ready to transmit for inter-RAT handover Details GP-031387 rejected-  
45.0100018- Rel-5Correction of definition of ready to transmit for inter-RAT handover Details GP-031386 rejected-  
45.0100017- Rel-4Correction of definition of ready to transmit for inter-RAT handover Details GP-031385 rejected-  
45.0100016-5.2.0Rel-6Clarification on continuous TA procedure Details GP-030884 agreedGP-030884approved6.0.0
45.0100015- Rel-5Clarification on continuous TA procedure Details GP-030883 rejected-  
45.0100014- Rel-4Clarification on continuous TA procedure Details GP-030882 rejected-  
45.0100013- Rel-5Correction of interruption times for GSM to UTRAN TDD handover Details GP-030259 withdrawn-  
45.0100012- Rel-4Correction of interruption times for GSM to UTRAN TDD handover Details GP-030258 withdrawn-  
45.010001125.1.0Rel-5Correction of interruption times for GSM to UTRAN FDD handover Details GP-030439 agreedGP-030439approved5.2.0
45.01000111 Rel-5Correction of interruption times for GSM to UTRAN FDD handover Details GP-030376 revised-  
45.0100011- Rel-5Correction of interruption times for GSM to UTRAN FDD handover Details GP-030256 revised-  
45.010001024.3.0Rel-4Correction of interruption times for GSM to UTRAN FDD handover Details GP-030438 agreedGP-030438approved4.4.0
45.01000101 Rel-4Correction of interruption times for GSM to UTRAN FDD handover Details GP-030375 revised-  
45.0100010- Rel-4Correction of interruption times for GSM to UTRAN FDD handover Details GP-030255 revised-  
45.0100009-5.1.0Rel-5Timing of DTM assignment Details GP-030215 agreedGP-030215approved5.2.0
45.0100008-4.3.0Rel-4Timing of DTM assignment Details GP-030214 agreedGP-030214approved4.4.0
45.0100007-5.0.0Rel-5Editorial clean up of references Details GP-022216 agreedGP-022216approved5.1.0
45.0100006- Rel-5Exclusion of TLLI after contention resolution Details GP-021933 rejected-  
45.010000514.2.0Rel-4Correction to inter system handover interruption times Details GP-021930 agreedGP-021930approved4.3.0
45.0100005- Rel-4Correction to inter system handover interruption times Details GP-021760 revised-  
45.0100004- Rel-5Mobile behaviour within reaction time Details GP-021272 rejected-  
45.010000214.1.0Rel-4Clarification to Requirements for Synchronization at DTM operation Details GP-020453 agreedGP-020453approved4.2.0
45.0100002-4.1.0Rel-4Clarification to Requirements for Synchronization at DTM operation Details GP-020088 revised-  
45.010000114.0.0Rel-4Correction of references to relevant 3GPP TSs Details GP-012776 agreedGP-012776approved4.1.0
45.0100001- Rel-4Correction of references to relevant 3GPP TSs Details GP-012379 revised-