• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 38 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 11.10-1A264-F5.1.0R1996Section 26.11.3.1.1 - Location updating / accepted - delete expected sequence step 8) Details 134    Details 97-332 approved SMG75.2.0
See details 11.10-1A263-F5.1.0R1996Section 20.3 - wait time in step i) Details 133    Details 97-334 approved SMG75.2.0
See details 11.10-1A262-F5.1.0R1996Sections 32.11.5 and 32.12.5 - time difference Dt in requirement 2) Details 132    Details 97-334 approved SMG75.2.0
See details 11.10-1A261-F5.1.0R1996Timing requirement in section 26.7.4.3.2.3 step 88 Details 130    Details 97-330 approved SMG75.2.0
See details 11.10-1A260-F5.1.0R1996Section 21.3 - Superfluous steps g) and h), and editorials Details 127    Details 97-334 approved SMG75.2.0
See details 11.10-1A259-F5.1.0R1996Section 13.4 Table 13-7, DCS1800 values for offests >= 6000 kHz Details 126    Details 97-334 approved SMG75.2.0
See details 11.10-1A258-F5.1.0R1996Section 13.4 - Bandwidth of reference measurements Details 125    Details 97-334 approved SMG75.2.0
See details 11.10-1A257-F5.1.0R1996Errors in the Multiband default message contents Details 277    Details 97-332 approved SMG75.2.0
See details 11.10-1A256-F5.1.0R1996Section 26.6.11.1 Classmark Change Procedure Details 275    Details 97-332 approved SMG75.2.0
See details 11.10-1A255-F5.1.0R1996Channel Mode IE needed to assign an appropriate channel Details 276    Details 97-331 approved SMG75.2.0
See details 11.10-1A254-F5.1.0R1996SIM simulator functional requirements - voltage measurement uncertainty in connection with current spikes Details 264    Details 97-333 approved SMG75.2.0
See details 11.10-1A253-C5.1.0R1996SIM/ME Interface: 3V/5V Switching Details 263    Details 97-333 approved SMG75.2.0
See details 11.10-1A252-F5.1.0R199626.6.4.1 - Timing requirements after ASSIGNMENT COMMAND Details 261    Details 97-331 approved SMG75.2.0
See details 11.10-1A251-F5.1.0R1996DISC / UA exchange in test 26.5.5.2.3 Details 257    Details 97-332 approved SMG75.2.0
See details 11.10-1A250-B5.1.0R1996EFR for section 26.6 Details 256    Details 97-329 approved SMG75.2.0
See details 11.10-1A247-B5.1.0R1996EFR phase 2 to 26.10 Details 255    Details 97-329 approved SMG75.2.0
See details 11.10-1A246-B5.1.0R1996EFR to 26.9 Details 254    Details 97-329 approved SMG75.2.0
See details 11.10-1A245-B5.1.0R1996EFR for sections 0 to 10 Details 253    Details 97-329 approved SMG75.2.0
See details 11.10-1A244-F5.1.0R1996Attempt counter reset Details 244    Details 97-330 approved SMG75.2.0
See details 11.10-1A243-F5.1.0R1996Clarification of action on expiry of T3210 in 26.7.4.3.2 and 26.7.4.3.3 Details 243    Details 97-330 approved SMG75.2.0
See details 11.10-1A242-F5.1.0R199626.7.4.3.1 - Clarification, and correction to make old cell available in due time Details 232    Details 97-330 approved SMG75.2.0
See details 11.10-1A241-F5.1.0R1996Introduction of section 34.2.9 „Multiple SMS mobile originated“ Details 221    Details 97-334 approved SMG75.2.0
See details 11.10-1A240-F5.1.0R1996Section 26.11.5.1 - expected sequence shows late rather than early assignment Details 220    Details 97-332 approved SMG75.2.0
See details 11.10-1A239-F5.1.0R1996Timing requirements in 20.10 and 20.15 Details 217    Details 97-334 approved SMG75.2.0
See details 11.10-1A238-F5.1.0R1996Accidental possible expiry of T3240: especially in 26.6.8.4 and 26.6.4. Details 212    Details 97-331 approved SMG75.2.0
See details 11.10-1A237-F5.1.0R1996Correction on tests with Modem Type V.21 Details 212    Details 97-334 approved SMG75.2.0
See details 11.10-1A236-F5.1.0R1996Incorrect delays in 26.2.4 procedure 6 Details 212    Details 97-332 approved SMG75.2.0
See details 11.10-1A235-F5.1.0R1996Progress indicator in 26.5.7.3 Details 212    Details 97-332 approved SMG75.2.0
See details 11.10-1A234-F5.1.0R1996DISC/UA exchange in Test 26.7.4.3.3 Details 212    Details 97-330 approved SMG75.2.0
See details 11.10-1A233-F5.1.0R1996Tolerances of timing advance Details 161    Details 97-331 approved SMG75.2.0
See details 11.10-1A232-B5.1.0R1996Coding of the bearer capability IE when Enhanced Full rate is supported Details 154    Details 97-328 approved SMG75.2.0
See details 11.10-1A231-B5.1.0R1996Enhanced Full rate Signalling/ structured procedures/MS originated call/ late assignment Details 153    Details 97-328 approved SMG75.2.0
See details 11.10-1A230-B5.1.0R1996Enhanced Full rate Signalling/ structured procedures/MS terminated call/ early assignment Details 152    Details 97-328 approved SMG75.2.0
See details 11.10-1A229-B5.1.0R1996Enhanced Full rate Signalling/ emergency call Details 151    Details 97-328 approved SMG75.2.0
See details 11.10-1A217-B5.1.0R1996Fixed Number Dialling Details 266    Details 97-333 approved SMG75.2.0
See details 11.10-1A216-B5.1.0R1996SIM/ME Interface: Transmission Speed Enhancement Details 265    Details 97-333 approved SMG75.2.0
See details 11.10-1A203-F5.1.0R1996Ambient Noise Rejection Details 233    Details 97-334 approved SMG75.2.0
See details 11.10-1A192-D5.1.0R1996MS residual output power between active bursts Details 160    Details 97-334 approved SMG75.2.0