• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 20 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
44.060106217.12.0Rel-7NPM Transfer Time correction in PACKET TIMESLOT RECONFIGUREGP-080842agreedGP-080842approved7.13.0
44.060106017.12.0Rel-7Corrections to Reduced Latency terminology and various clarifications and cleanupsGP-080815agreedGP-080815approved7.13.0
44.060105817.12.0Rel-7RRBP polling and reduced latencyGP-080838agreedGP-080838approved7.13.0
44.0601056-7.12.0Rel-7Consistent FANR activation for concurrent TBFsGP-080723agreedGP-080723approved7.13.0
44.060105417.12.0Rel-7Scenarios where inconsistent PAN shall be ignoredGP-080836agreedGP-080836approved7.13.0
44.0601052-7.12.0Rel-7Clarification on transmission of distribution messages & PACCH behaviour in RTTI configurationsGP-080704agreedGP-080704approved7.13.0
44.060105027.12.0Rel-7Same as before RTTI ConfigurationGP-080915agreedGP-080915approved7.13.0
44.060104817.12.0Rel-7Control_ACK field in PS Handover Command and Pkt CS ReleaseGP-080808agreedGP-080808approved7.13.0
44.060104517.12.0Rel-7Definition of the formats for the EGPRS2 combined RLC/MAC headersGP-080905agreedGP-080905approved7.13.0
44.060103917.12.0Rel-7Pulse shape signalling for EGPRS2B uplinkGP-080907agreedGP-080907approved7.13.0
44.060103217.12.0Rel-7TBF Starting Time corrections for configurations using the message escape for dual carrier, RTTI, BTTI using FANR, and EGPRS2GP-080826agreedGP-080826approved7.13.0
44.060103017.12.0Rel-7Corrections to Dynamic Allocation 2 Struct in assignment messagesGP-080828agreedGP-080828approved7.13.0
44.0601028-7.12.0Rel-7Clarification on TBF assignment for LATREDGP-080533agreedGP-080533approved7.13.0
44.0601022-7.12.0Rel-7Updates to TB FANR PANGP-080707agreedGP-080707approved7.13.0
44.0601017-7.12.0Rel-7Incomplete implementation of GP-080206GP-080431agreedGP-080431approved7.13.0
44.0601015-7.12.0Rel-7Correction of RTTI assignmentsGP-080429agreedGP-080429approved7.13.0
44.060101127.12.0Rel-7Clarification to the MCS-0 formatGP-080428agreedGP-080428approved7.13.0
44.060100947.12.0Rel-7Clarifying FANR behavior when a concurrent TBF in the uplink direction is not assignedGP-080817agreedGP-080817approved7.13.0
44.060099937.12.0Rel-7Clarifying the V(A) update procedure when FANR is used together with RLC AMGP-080426agreedGP-080426approved7.13.0
44.060097677.12.0Rel-7Reduced Latency Support Indication at One Phase AccessGP-080885agreedGP-080885approved7.13.0