• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 60 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
23.401108528.5.0Rel-8Alignment of procedure to the storage of APN-AMBR in the UES2-094235agreedSP-090336approved8.6.0
23.401107618.5.0Rel-8BCM support of E-UTRAN capable UES2-093952agreedSP-090337approved8.6.0
23.401107428.5.0Rel-8Change of subscribed ARP affecting whole PDN connectionS2-093869agreedSP-090337approved8.6.0
23.401106918.5.0Rel-8Add the missing parameter to the information storageS2-093837agreedSP-090337approved8.6.0
23.401104718.5.0Rel-8Correction the UE identity in the service request procedureS2-093835agreedSP-090337approved8.6.0
23.401104328.5.0Rel-8Description of Configuration Transfer procedureS2-093867agreedSP-090337approved8.6.0
23.401103428.5.0Rel-8Editorial correction in Detach and Deactivation procedureS2-093865agreedSP-090337approved8.6.0
23.401102948.5.0Rel-8Handling of last PDN disconnection by PDN GWS2-094192rev SP-090335approved8.6.0
23.401102718.5.0Rel-8NAS message not optional in Delete Bearer Request Command to eNBS2-093831agreedSP-090337approved8.6.0
23.401102028.5.0Rel-8Correction of the PDN connectivity procedureS2-094134agreedSP-090337approved8.6.0
23.401101818.5.0Rel-8Clarification on IP address notification during IP-CAN session establishmentS2-093900agreedSP-090337approved8.6.0
23.401101518.5.0Rel-8Network Triggered Service Request for UE in ECM-CONNECTED StateS2-093827agreedSP-090336approved8.6.0
23.4011013-8.5.0Rel-8'Charging Characteristics' receipt in PGW in PMIP based S5/S8 systemsS2-093167agreedSP-090336approved8.6.0
23.401100928.5.0Rel-8Handling of APN-AMBR when UE support UTRAN/GERANS2-094186agreedSP-090336approved8.6.0
23.401100738.5.0Rel-8Some corrections to the referencesS2-094132agreedSP-090336approved8.6.0
23.401099648.5.0Rel-8IMS Voice IndicationS2-094179agreedSP-090336approved8.6.0
23.401098718.5.0Rel-8GERAN/UTRAN to E-UTRAN handover clarificationS2-092729agreedSP-090343approved8.6.0
23.401098518.5.0Rel-8Annex F Correction of GTPv2 terminologyS2-093667agreedSP-090336approved8.6.0
23.401097628.5.0Rel-8UE reachability procedure correctionS2-092960agreedSP-090334approved8.6.0
23.401097238.5.0Rel-8Clarification of data forwarding during RAU/TAU with Gn/Gp SGSNsS2-093839rev SP-090335approved8.6.0
23.401097028.5.0Rel-8Clarification of data forwarding during RAU/TAUS2-093675agreedSP-090334approved8.6.0
23.401096818.5.0Rel-8Compatibility issuesS2-092741agreedSP-090334approved8.6.0
23.401096618.5.0Rel-8E-UTRAN to UTRAN handover clarificationS2-092719agreedSP-090343approved8.6.0
23.401096328.5.0Rel-8Handling of TFTS2-093016agreedSP-090334approved8.6.0
23.401095818.5.0Rel-8Clarification on QoS of Default bearerS2-092725agreedSP-090334approved8.6.0
23.401094948.5.0Rel-8Annex-D3.6 Message Alignment to Stage 3S2-093661rev SP-090335approved8.6.0
23.401094848.5.0Rel-8Annex-D3.5 Message Alignment to Stage 3S2-093660rev SP-090335approved8.6.0
23.401094738.5.0Rel-8Annex-D3.4 Message Alignment to Stage 3S2-093659agreedSP-090334approved8.6.0
23.401094638.5.0Rel-8Annex-D3.3 Message Alignment to Stage 3S2-093658agreedSP-090334approved8.6.0
23.401094218.5.0Rel-8Resolution of editor's note in clause 5.3.3.2S2-093685agreedSP-090334approved8.6.0
23.401093728.5.0Rel-8Removal of FFS from 'Packet Routeing and Transfer Function'S2-093847agreedSP-090333approved8.6.0
23.4010934-8.5.0Rel-8Removal of eMBMS from Rel-8S2-092287agreedSP-090334approved8.6.0
23.401093328.5.0Rel-8Alignments between Stage 2 and Stage 3 for GTPv2-C for Section D.3.8S2-093388agreedSP-090333approved8.6.0
23.401093238.5.0Rel-8Alignments between Stage 2 and Stage 3 for GTPv2-C for Section 5.3.8S2-093387rev SP-090335approved8.6.0
23.401093128.5.0Rel-8Alignments between Stage 3 and Stage 2 - Section D 3.7S2-093386agreedSP-090333approved8.6.0
23.401091928.5.0Rel-8Align UE triggered Service Request procedure with GTPv2 message namesS2-093271agreedSP-090333approved8.6.0
23.401091828.5.0Rel-8Align TAU procedures with GTPv2 message namesS2-093273agreedSP-090333approved8.6.0
23.401091728.5.0Rel-8Align RAU procedures with GTPv2 message namesS2-093269agreedSP-090333approved8.6.0
23.401091628.5.0Rel-8Align E-UTRAN Initial Attach with GTPv2 message namesS2-093267agreedSP-090333approved8.6.0
23.401091128.5.0Rel-8GTPv2 message name alignment in clauses 5.5.2 and 5.10S2-093606rev SP-090335approved8.6.0
23.401090328.5.0Rel-8Data Forwarding Path between RNC and S4-SGSNS2-092717rev SP-090335approved8.6.0
23.401089628.5.0Rel-8PDN GW Information StorageS2-092953agreedSP-090333approved8.6.0
23.401089428.5.0Rel-8Adding interaction with HSS/AAA in PDN GW initiated bearer deactivation procedureS2-092843rev SP-090335approved8.6.0
23.401088928.5.0Rel-8Add the PDN Type to UE Context in Information Storage clauseS2-092939agreedSP-090332approved8.6.0
23.401088848.5.0Rel-8EPS Bearer Release function in the attach ProcedureS2-093673agreedSP-090332approved8.6.0
23.401088618.5.0Rel-8GTPv2 message name alignment - clauses 5.4 to 5.5.1S2-093163agreedSP-090332approved8.6.0
23.401087938.5.0Rel-8Charging identity and characteristics for EPSS2-094144agreedSP-090332approved8.6.0
23.401087638.5.0Rel-8Clarification on PDN TypeS2-092958agreedSP-090332approved8.6.0
23.4010870-8.5.0Rel-8Clarification of the trigger of TAU in EMM-REGISTERED and ECM-IDLE stateS2-091999agreedSP-090332approved8.6.0
23.401086628.5.0Rel-8Clarification of the SMC procedureS2-093849agreedSP-090331approved8.6.0
23.401086428.5.0Rel-8GTPv2-C message alignment in Section 5.3.5S2-093579agreedSP-090331approved8.6.0
23.401086228.5.0Rel-8Clarification of the ISR capabilityS2-093856agreedSP-090331approved8.6.0
23.401085528.5.0Rel-8IPv6 prefix allocation correctionsS2-092919agreedSP-090332approved8.6.0
23.4010854-8.5.0Rel-8Some typo corrections in the handover proceduresS2-091953agreedSP-090332approved8.6.0
23.401084928.5.0Rel-8Same Serving GW UP TEID(s)S2-093871agreedSP-090331approved8.6.0
23.401084128.5.0Rel-8Corrections to ISR descriptionS2-092743agreedSP-090331approved8.6.0
23.401084028.5.0Rel-8Additional GUTI in TAU proceduresS2-092731agreedSP-090331approved8.6.0
23.401083828.5.0Rel-8Warning system: accuracy of internal clockS2-092737agreedSP-090331approved8.6.0
23.401079148.5.0Rel-8Use and assignment of PTI.S2-093863agreedSP-090331approved8.6.0
23.401079038.5.0Rel-8Correction of standalone Insert Subscriber Data procedureS2-092955agreedSP-090331approved8.6.0