• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 40 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
34.121-10714-7.0.0Rel-7Correction of UE Transmit timing 8.5.1R5-061475r3agreedRP-060322approved7.1.0
34.121-10713-7.0.0Rel-7to 34.121-1: Changes to chapter 8 to introduce UMTS 1.7/2.1 GHz (Band IV)R5-061466agreedRP-060334approved7.1.0
34.121-10712-7.0.0Rel-7to 34.121-1: Changes to Annex D to introduce UMTS 1.7/2.1 GHz (Band IV)R5-061452agreedRP-060334approved7.1.0
34.121-10711-7.0.0Rel-7Introduction of Band IV to 34.121 Chapter 6R5-061465agreedRP-060334approved7.1.0
34.121-10710-7.0.0Rel-7Introduction of Band IV to 34.121-1 Chapter 5R5-061073agreedRP-060334approved7.1.0
34.121-10709-7.0.0Rel-7Intorduction of Band IV to 34.121-1 Chapter 4R5-061072agreedRP-060334approved7.1.0
34.121-10708-7.0.0Rel-7to 34.121-1: Introduction of improvement of performance requirements of HSDPA receiver (type 3) for UE categories 7 & 8R5-061472agreedRP-060335approved7.1.0
34.121-10707-7.0.0Rel-7Introduction of the demodulation of E-AGCH test caseR5-061445agreedRP-060332approved7.1.0
34.121-10706-7.0.0Rel-7Addition to 34.121-1 for HSUPA: UE max output power with HS-DPCCH and E-DCH and HS-DPCCH only release 6 and laterR5-061461agreedRP-060332approved7.1.0
34.121-10705-7.0.0Rel-7Correction to 34.121-1: HSDPA and E-DCH beta configurationsR5-061459agreedRP-060332approved7.1.0
34.121-10704-7.0.0Rel-7Definition of serving cell for E-DCH RF transmitter test casesR5-061463agreedRP-060332approved7.1.0
34.121-10703-7.0.0Rel-7Test tolerances for E-HICH and E_RGCHR5-061090agreedRP-060332approved7.1.0
34.121-10702-7.0.0Rel-7E-RGCH testR5-061462agreedRP-060332approved7.1.0
34.121-10701-7.0.0Rel-7E-HICH testR5-061447agreedRP-060332approved7.1.0
34.121-10700-7.0.0Rel-7Correction to 5.13.1A minimum power settingR5-061433agreedRP-060337approved7.1.0
34.121-10699-7.0.0Rel-7Correction to 5.7A and 5.13.1A waveform patternsR5-061471agreedRP-060337approved7.1.0
34.121-10698-7.0.0Rel-7Addition of MAC-d PDU size and HARQ process in 9.3 and 9.4 and Annex C.8.1R5-061467agreedRP-060337approved7.1.0
34.121-10697-7.0.0Rel-7Annex F HSET data rate clarification and correctionsR5-061422agreedRP-060337approved7.1.0
34.121-10696-7.0.0Rel-7Correction to 5.2AR5-061437agreedRP-060337approved7.1.0
34.121-10695-7.0.0Rel-7Beta values for HSDPA RF test 5.7AR5-061436agreedRP-060337approved7.1.0
34.121-10694-7.0.0Rel-7Clarification of HS-SCCH performance requirementsR5-061076agreedRP-060337approved7.1.0
34.121-10693-7.0.0Rel-7Number of HARQ processes in HS-SCCH performance testsR5-061049agreedRP-060337approved7.1.0
34.121-10692-7.0.0Rel-7Clarification to H-SET 1 used in Tx HSDPA testsR5-061428agreedRP-060337approved7.1.0
34.121-10691-7.0.0Rel-7Addition of downlink physical channels power definition for performance tests without a dedicated connectionR5-061423agreedRP-060328approved7.1.0
34.121-10690-7.0.0Rel-7Correction to Annex F.6.1.10 Dual limit BLER testsR5-061458agreedRP-060322approved7.1.0
34.121-10689-7.0.0Rel-7Correction to the contents of Tables of the section of F.4 of 3GPP TS 34.121-1R5-061457agreedRP-060322approved7.1.0
34.121-10688-7.0.0Rel-7Addition of measurement performance requirements for Band III/IX UER5-061416agreedRP-060322approved7.1.0
34.121-10687-7.0.0Rel-7Tc 8.3.5.3 - Addition of 2quater parameters to the test parametersR5-061414agreedRP-060322approved7.1.0
34.121-10686-7.0.0Rel-7Tc 8.7.3a - Move Sib 11 exceptions to Annex IR5-061413agreedRP-060322approved7.1.0
34.121-10685-7.0.0Rel-7correction to Tc 8.7.3.aR5-061412agreedRP-060322approved7.1.0
34.121-10684-7.0.0Rel-7Correction to Measurement Control Message in 8.6.2.2R5-061411agreedRP-060329approved7.1.0
34.121-10683-7.0.0Rel-7Modifications to 8.6.5 Combined Interfrequency and GSM measurementsR5-061409agreedRP-060331approved7.1.0
34.121-10682-7.0.0Rel-7Missing Ior/Ioc field in 7.12 test requirementsR5-061408agreedRP-060328approved7.1.0
34.121-10681-7.0.0Rel-7Correction to 34.121-1 Test Case 7.8.4: Power control in the downlink, different transport formatsR5-061407agreedRP-060329approved7.1.0
34.121-10680-7.0.0Rel-7Correction to 7.8.1 and 7.9.1 test casesR5-061406agreedRP-060322approved7.1.0
34.121-10679-7.0.0Rel-7Correction to TC7.9R5-061405agreedRP-060322approved7.1.0
34.121-10678-7.0.0Rel-7Clarification to TC7.8.2R5-061404agreedRP-060322approved7.1.0
34.121-10677-7.0.0Rel-7Correction to 5.13.3R5-061456agreedRP-060329approved7.1.0
34.121-10676-7.0.0Rel-7Correction to spurious emissions requirements applicability for TC 5.11R5-061209agreedRP-060322approved7.1.0
34.121-10675-7.0.0Rel-7Correction to test system uncertainty in 5.11R5-061402agreedRP-060322approved7.1.0