• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 35 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
23.0600759-8.2.0Rel-8Addition of E-UTRAN support in MS Network CapabilityS2-088238agreedSP-080812approved8.3.0
23.0600758-8.2.0Rel-8Adding TFT to a bearerS2-088224agreedSP-080812approved8.3.0
23.060075428.2.0Rel-8Update Type on S6d/Gr in Attach procedureS2-088293agreedSP-080812approved8.3.0
23.060075118.2.0Rel-8Gs association is released when GSs is established description missingS2-088212agreedSP-080830approved8.3.0
23.060074818.2.0Rel-8Correction of figures for GPRS MS-Initiated Detach ProcedureS2-088194agreedSP-080813approved8.3.0
23.060074718.2.0Rel-8SRNS Relocation Cancel Procedure using S4S2-088081agreedSP-080812approved8.3.0
23.060074518.2.0Rel-8Clarification of MM state and implicitly detach procedure in case of ISRS2-088057agreedSP-080813approved8.3.0
23.0600743-8.2.0Rel-8Corrections to PDP context proceduresS2-087407agreedSP-080813approved8.3.0
23.060074218.2.0Rel-8Signalling flow for Ready to Standby transition when using ISRS2-087073agreedSP-080812approved8.3.0
23.0600741-8.2.0Rel-8Deletion of restoration sections from 23.060, and, correction of section numbers in section 13.9S2-086871agreedSP-080813approved8.3.0
23.060074048.2.0Rel-8DRX parameter handling in LTE, 2G and 3G and associated correctionsS2-087444agreedSP-080813approved8.3.0
23.060073938.2.0Rel-8ARP setting for Default BearerS2-087250agreedSP-080812approved8.3.0
23.060073728.2.0Rel-8QoS profile of the first PDP contextS2-087333agreedSP-080812approved8.3.0
23.060073618.2.0Rel-8Clarify ISR handling during bearer proceduresS2-087080agreedSP-080813approved8.3.0
23.060073548.2.0Rel-8Enhanced SRNS relocationS2-087322agreedSP-080834approved8.3.0
23.060073428.2.0Rel-8Remove wildcard in SDL for SGSN and MMES2-087335agreedSP-080812approved8.3.0
23.060073328.2.0Rel-8SDL updatesS2-087251agreedSP-080813approved8.3.0
23.060073228.2.0Rel-8QoS update during Inter SGSN RAU procedure using S4S2-087334agreedSP-080812approved8.3.0
23.060073018.2.0Rel-8Update of the Obsolete IPv6 RFCsS2-087402agreedSP-080813approved8.3.0
23.060072718.2.0Rel-8Update the offline charging interface for GPRS Logical Architecture when based on S4/S5/S8 interfacS2-087151agreedSP-080812approved8.3.0
23.060072518.2.0Rel-8Mechanism to handle S4 connection in idle stateS2-087072agreedSP-080812approved8.3.0
23.060072418.2.0Rel-8Align Update Location sequence to same as in 23.401S2-087150agreedSP-080812approved8.3.0
23.060072338.2.0Rel-8Update RAU procedure related to S16S2-088056agreedSP-080812approved8.3.0
23.060072228.2.0Rel-8Default bearer handling in 23.060S2-087249agreedSP-080812approved8.3.0
23.060072118.2.0Rel-8Aligning S4-SGSN procedures with UE requested resource modification procedureS2-087097agreedSP-080812approved8.3.0
23.0600720-8.2.0Rel-8Change of default bearer QoS and APN-AMBRS2-086534agreedSP-080812approved8.3.0
23.060071928.2.0Rel-823.060 QoS Terminology alignmentS2-088026agreedSP-080813approved8.3.0
23.0600718-8.2.0Rel-8Editorial cleanup on 23.060S2-086526agreedSP-080813approved8.3.0
23.060071728.2.0Rel-8Clean up of the handling failed PDP contexts in S4 SGSNS2-087252agreedSP-080813approved8.3.0
23.060071528.2.0Rel-8Trigger of RAUS2-087149agreedSP-080812approved8.3.0
23.060071328.2.0Rel-8Clarification on the information storage of SGSNS2-088193agreedSP-080813approved8.3.0
23.060071028.2.0Rel-8ISR parameters and actions: alignments and clarifications/corrections.S2-087079agreedSP-080813approved8.3.0
23.060070948.2.0Rel-8Clarifying charging principle for SGSN when connected through S4S2-087336agreedSP-080813approved8.3.0
23.060070748.2.0Rel-8Corrections on SGSN interface with HLR/HSSS2-088237agreedSP-080813approved8.3.0
23.060069028.2.0Rel-8TFT packet filter usageS2-086757agreedSP-080811approved8.3.0