• Search form (36.331, Version(11.2.0), Rel-11) Items per page
    select
    Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
First Page Previous Page
1
Next Page Last Page
Page size:
PageSizeComboBox
select
 33 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
36.3311175-11.1.0Rel-11GERAN measurement object at ANRR2-126069agreedRP-121957approved11.2.0
36.3311157-11.1.0Rel-11Broadcast of Time Info by Using a New SIBR2-125992endorsedRP-121960approved11.2.0
36.3311146-11.1.0Rel-11Introduction of network sharing for CDMA2000 inter-workingR2-126068agreedRP-121958approved11.2.0
36.3311131-11.1.0Rel-11Introducion of wideband RSRQ measurementsR2-125862agreedRP-121958approved11.2.0
36.3311130211.1.0Rel-11Introduction of Rel-11 UE capabilitiesR2-126121agreedRP-121961approved11.2.0
36.3311129111.1.0Rel-11Introduction of EPDCCH parameters in TS 36.331R2-126116agreedRP-121956approved11.2.0
36.3311128211.1.0Rel-11Measurement reporting of ScellsR2-126130agreedRP-121936approved11.2.0
36.3311127111.1.0Rel-11SIB1 provisioning via dedicated signallingR2-126104agreedRP-121950approved11.2.0
36.3311125111.1.0Rel-11Correction on Power preference indicationR2-126078agreedRP-121952approved11.2.0
36.3311120-11.1.0Rel-11CR to 36.331 on additional information in RLF report for inter-RAT MROR2-125857agreedRP-121947approved11.2.0
36.3311105211.1.0Rel-11Introducing further UE aspects regarding multi band cellsR2-126131agreedRP-121922approved11.2.0
36.3311103611.1.0Rel-11Introducing support for Coordinated Multi-Point (CoMP) operation- RP-121970approved11.2.0
36.3311102-11.1.0Rel-11Clarification and alignment of handling of other configurationR2-126038agreedRP-121953approved11.2.0
36.3311100-11.1.0Rel-11Correction on MDT multi-PLMN supportR2-125855agreedRP-121946approved11.2.0
36.3311093111.1.0Rel-11CR to 36.331 on introducing ROHC context continue for intra-ENB handoverR2-126128agreedRP-121959approved11.2.0
36.3311089111.1.0Rel-11Moving the TM5 capabilityR2-126129endorsedRP-121924approved11.2.0
36.3311085-11.1.0Rel-11Clarification for Multiple Frequency Band Indicators featureR2-126112agreedRP-121922approved11.2.0
36.3311079111.1.0Rel-11Validity of EAB SIB and acquisition of SIB1R2-125850agreedRP-121939approved11.2.0
36.3311078-11.1.0Rel-11Some clarification to Carrier aggregation enhancementsR2-125301agreedRP-121951approved11.2.0
36.3311077-11.1.0Rel-11RRC support for CoMP in ULR2-125300agreedRP-121954approved11.2.0
36.3311076111.1.0Rel-11RAN overload control using RRC connection RejectionR2-125833agreedRP-121958approved11.2.0
36.3311075-11.1.0Rel-11Miscellaneous correctionsR2-125298agreedRP-121957approved11.2.0
36.3311074111.1.0Rel-11Handling of 1xCSFB failureR2-126134agreedRP-121957approved11.2.0
36.3311073-11.1.0Rel-11CR to 36.331 on SIB15 acquisitionR2-125296agreedRP-121940approved11.2.0
36.3311072211.1.0Rel-11Corrections to MBMS Service ContinuityR2-126077agreedRP-121940approved11.2.0
36.3311071111.1.0Rel-11Correction of the signaling for Uncertainty and ConfidenceR2-125851agreedRP-121946approved11.2.0
36.3311070-11.1.0Rel-11Clarification on mobility related issuesR2-125293agreedRP-121957approved11.2.0
36.3311069111.1.0Rel-11Clarification on HandoverCommand messageR2-125859agreedRP-121957approved11.2.0
36.3311068111.1.0Rel-11Clarification of SR periodR2-126127agreedRP-121957approved11.2.0
36.3311067311.1.0Rel-11Carrier Aggregation Enhancement RAN1 parametersR2-126075agreedRP-121951approved11.2.0
36.3311066211.1.0Rel-11Addition of the stage-3 agreements on IDCR2-126114agreedRP-121953approved11.2.0
36.3311065-11.1.0Rel-11Processing delay for RRCConnectionReconfigurationR2-125288agreedRP-121936approved11.2.0
36.3311063-11.1.0Rel-11Correction related to differentiating UTRAN modes in FGIsR2-125286agreedRP-121933approved11.2.0