• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 31 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
24.0082240-11.3.0Rel-11Correction on NAS signalling low priority overriding handlingC1-123020agreedCP-120589approved11.4.0
24.0082239211.3.0Rel-11Clarification on description of SMS over GPRSC1-123367agreedCP-120584approved11.4.0
24.0082234-11.3.0Rel-11Correction of device properties in cause mappingC1-122981agreedCP-120584approved11.4.0
24.0082230111.3.0Rel-11Remove the combined routing area update procedure in CSFB mobile terminating callC1-123322agreedCP-120594approved11.4.0
24.0082229111.3.0Rel-11Correct the requirement on QoS modification of default PDP contextC1-123245agreedCP-120594approved11.4.0
24.0082228111.3.0Rel-11Clarifying in GMM substates ATTEMPTING-TO-ATTACH and ATTEMPTING-TO-UPDATE, CM layer triggered GMM message will be sent if T3346 is not runningC1-123244agreedCP-120584approved11.4.0
24.0082227211.3.0Rel-11UE configured for Override_ExtendedAccessBarringC1-123425agreedCP-120589approved11.4.0
24.0082222111.3.0Rel-11Changes to the security context handling at power onC1-123321agreedCP-120584approved11.4.0
24.0082221211.3.0Rel-11Removing NMO-IIIC1-123394agreedCP-120584approved11.4.0
24.0082219-11.3.0Rel-11Low Priority Indicator vs NAS Signalling Low Priority Indication TerminologyC1-122856agreedCP-120584approved11.4.0
24.0082218311.3.0Rel-11Clarifications for user connection attachment for vSRVCC - removal of editor's noteC1-123424agreedCP-120587approved11.4.0
24.0082216211.3.0Rel-11Dual priority definitionC1-123361agreedCP-120589approved11.4.0
24.0082215111.3.0Rel-11Correction on handling of SM back-off timer for dual-priorityC1-123201agreedCP-120589approved11.4.0
24.0082214311.3.0Rel-11Correction on handling of SM NAS request for dual-priorityC1-123407agreedCP-120589approved11.4.0
24.0082213511.3.0Rel-11Handling of PDN connection for dual-priority functionalityC1-123451agreedCP-120589approved11.4.0
24.0082211111.3.0Rel-11IMSI detach triggered by last PDP context deactivationC1-123190agreedCP-120572approved11.4.0
24.0082207-11.3.0Rel-11Correcting error introduced by C1-122339C1-122791agreedCP-120584approved11.4.0
24.0082206211.3.0Rel-11Handling of MM procedure during combined RAU procedureC1-123391agreedCP-120581approved11.4.0
24.0082203211.3.0Rel-11CS congestion control handling for combined procedureC1-123379agreedCP-120589approved11.4.0
24.0082199211.3.0Rel-11Setting method of EMM combined procedure capability bitC1-123384agreedCP-120594approved11.4.0
24.0082198211.3.0Rel-11Clarify MS behaviour after deletion of forbidden listsC1-123350agreedCP-120581approved11.4.0
24.0082196211.3.0Rel-11Skip Indicator for GERAN sharingC1-123368agreedCP-120585approved11.4.0
24.0082193111.3.0Rel-11Considering ePLMN for SM backoff Timer with cause #50 or #51C1-123315agreedCP-120584approved11.4.0
24.0082192111.3.0Rel-11RAU/combined RAU after E-UTRAN/UTRAN to GERAN Inter RAT handoverC1-123226agreedCP-120594approved11.4.0
24.0082188411.3.0Rel-11Additional condition for attach exceptionsC1-123448agreedCP-120589approved11.4.0
24.0082183111.3.0Rel-11Corrections to Gs Support for MSC in PoolC1-123313agreedCP-120584approved11.4.0
24.0082180111.3.0Rel-11Clearing of the maximum number of active PDP contextsC1-123381agreedCP-120594approved11.4.0
24.0082179211.3.0Rel-11Correction and completion of handling of the maximum number of active PDP contextsC1-123436agreedCP-120594approved11.4.0
24.0082165211.3.0Rel-11CKSN allocation for idle mode inter-system changeC1-123311agreedCP-120594approved11.4.0
24.0082164411.3.0Rel-11Posibility to ignore paging for non-GPRS servicesC1-123214agreedCP-120589approved11.4.0
24.0082105511.3.0Rel-11Security context mapping for SRVCC from CS to PSC1-123089agreedCP-120593approved11.4.0