• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 13 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 36.10107611A9.6.0Rel-9Clarification to LTE relative power tolerance table Details R4-111660 agreedRAN4#58Nokia Details RP-110337 approvedRAN#51R49.7.0LTE-RF
See details 36.1010758-F9.6.0Rel-9Removal of square brackets in sustained data rate tests Details R4-111540 agreedRAN4#58Renesas Electro... Details RP-110343 approvedRAN#51R49.7.0LTE-RF
See details 36.10107551F9.6.0Rel-9CR Sustained Data Rate Test Details R4-111399 agreedRAN4#58Qualcomm Incorp... Details RP-110343 approvedRAN#51R49.7.0LTE-RF
See details 36.10107532F9.6.0Rel-9UE category coverage for dual-layer beamforming Details R4-111651 agreedRAN4#58Huawei, HiSilic... Details RP-110349 approvedRAN#51R49.7.0LTEimp-eDL
See details 36.1010738-F9.6.0Rel-9Removal of square brackets for dual-layer beamforming demodulation performance requirements Details R4-111276 agreedRAN4#58CMCC Details RP-110349 approvedRAN#51R49.7.0LTEimp-eDL
See details 36.1010729-A9.6.0Rel-9Removing the square bracket for TS36.101 Details R4-111007 agreedRAN4#58Huawei, HiSilicon Details RP-110338 approvedRAN#51R49.7.0LTE-RF
See details 36.10107273B9.6.0Rel-9Verification framework for PUSCH 2-2 and PUCCH 2-1 reporting Details R4-111621 agreedRAN4#58Huawei, HiSilic... Details RP-110343 approvedRAN#51R49.7.0LTE-RF
See details 36.1010722-F9.6.0Rel-9Corrections to power settings for Single layer beamforming with interfering simultaneous transmission Details R4-110978 agreedRAN4#58Rohde&Schwarz Details RP-110343 approvedRAN#51R49.7.0LTE-RF
See details 36.1010718-F9.6.0Rel-9Minimum requirements for the additional Rel-9 scenarios Details R4-110949 agreedRAN4#58Renesas Electro... Details RP-110343 approvedRAN#51R49.7.0LTE-RF
See details 36.1010709-A9.6.0Rel-9PMI performance: Power settings and precoding granularity Details R4-110858 agreedRAN4#58Rohde&Schwarz Details RP-110338 approvedRAN#51R49.7.0LTE-RF
See details 36.10107051A9.6.0Rel-9Spurious emissions measurement uncertainty Details R4-111384 agreedRAN4#58Qualcomm Incorp... Details RP-110336 approvedRAN#51R49.7.0LTE-RF
See details 36.10107002B9.6.0Rel-9Introducing UE-selected subband CQI tests Details R4-111620 agreedRAN4#58NEC, Mediatek Details RP-110343 approvedRAN#51R49.7.0LTE-RF
See details 36.10106981A9.6.0Rel-9PDCCH and PHICH performance: OCNG and power settings Details R4-111696 agreedRAN4#5Rohde&Schwarz Details RP-110338 approvedRAN#51R49.7.0LTE-RF