• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 66 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
38.3310989-15.4.0Rel-15CR on Processing delay requirements for RRC Resume procedures in TS 38.331R2-1902750agreedRP-190544approved15.5.0
38.3310988115.4.0Rel-15Correction on supportedBandwidthCombinationSetEUTRA-v1530 usageR2-1902803agreedRP-190545approved15.5.0
38.3310987-15.4.0Rel-15Clarification for random access on SULR2-1902746agreedRP-190544approved15.5.0
38.3310985-15.4.0Rel-15Enable and disable of security at DRB setupR2-1902535agreedRP-190540approved15.5.0
38.3310984315.4.0Rel-15Correction on compilation of featureSets for NR containerR2-1902709agreedRP-190543approved15.5.0
38.3310981215.4.0Rel-15Clarification on nrofSS-BlocksToAverage and absThreshSS-BlocksConsolidationR2-1902720agreedRP-190543approved15.5.0
38.3310978315.4.0Rel-15Correction on going to RRC_IDLE upon inter-RAT cell reselection in RRC_INACTIVER2-1902820agreedRP-190546approved15.5.0
38.3310976215.4.0Rel-15Correction of uac-AccessCategory1-SelectionAssistanceInfo field descriptionR2-1902733agreedRP-190543approved15.5.0
38.3310975115.4.0Rel-15Correction on SI schedulingR2-1902604agreedRP-190541approved15.5.0
38.3310967215.4.0Rel-15Qoffset for inter-RAT cell reselectionR2-1902721agreedRP-190543approved15.5.0
38.3310963215.4.0Rel-15Correction on MIB acquisition upon Reconfiguration with SyncR2-1902784agreedRP-190545approved15.5.0
38.3310956115.4.0Rel-15CR on the supplementaryUplink and uplinkConfigR2-1902574agreedRP-190541approved15.5.0
38.3310948115.4.0Rel-15Correction on PTRS port indexR2-1902573agreedRP-190541approved15.5.0
38.3310939115.4.0Rel-15The support of drb-ContinueROHCR2-1902583agreedRP-190541approved15.5.0
38.3310938-15.4.0Rel-15PDCP re-establishment during SRB modification for EUTRA/5GCR2-1901739agreedRP-190550approved15.5.0
38.3310935215.4.0Rel-15Unification of EN-DC terminologyR2-1902789agreedRP-190545approved15.5.0
38.3310932115.4.0Rel-15Clarification on the relation between CA configuration and supported featureset combination_Option1R2-1902630agreedRP-190542approved15.5.0
38.3310931-15.4.0Rel-15CR on description of SRS carrier switchingR2-1901687agreedRP-190540approved15.5.0
38.3310930-15.4.0Rel-15CR on introduction of UE assistance information in inter-node messageR2-1901684agreedRP-190540approved15.5.0
38.3310923215.4.0Rel-15Correction for measurements of serving cells without SSB or without CSI-RSR2-1902785agreedRP-190545approved15.5.0
38.3310922215.4.0Rel-15CR on SSB type indicationR2-1902739agreedRP-190544approved15.5.0
38.3310920115.4.0Rel-15CR to 38.331 for not supporting different quantities for thresholds in Event A5 and B2R2-1902590agreedRP-190541approved15.5.0
38.3310913115.4.0Rel-15CR on the number of bits of downlink NAS COUNT valueR2-1902648agreedRP-190542approved15.5.0
38.3310912115.4.0Rel-15CR on clarification on the description of NIA0R2-1902647agreedRP-190542approved15.5.0
38.3310905-15.4.0Rel-15Corrections to MFBIR2-1901269agreedRP-190540approved15.5.0
38.3310904115.4.0Rel-15Clarification for SIB validityR2-1902608agreedRP-190541approved15.5.0
38.3310902115.4.0Rel-15Corrections on radio link failure related actionsR2-1902662agreedRP-190542approved15.5.0
38.3310898115.4.0Rel-15Correction on outOfOrderDeliveryR2-1902577agreedRP-190541approved15.5.0
38.3310897115.4.0Rel-15Corrections on drb-ContinueROHCR2-1902576agreedRP-190541approved15.5.0
38.3310896215.4.0Rel-15Correction to Need Codes in system informationR2-1902737agreedRP-190543approved15.5.0
38.3310884215.4.0Rel-15Correction on the configuration for transform preceding of PUSCHR2-1902727agreedRP-190543approved15.5.0
38.3310877215.4.0Rel-15Correction on smtc configuration in NR SCell addition procedureR2-1902771agreedRP-190544approved15.5.0
38.3310876215.4.0Rel-15Barring alleviation when T302 or T390 is stoppedR2-1902653agreedRP-190542approved15.5.0
38.3310868215.4.0Rel-15CR on use of positioning measurement gaps for subframe and slot timing detection towards E-UTRAR2-1902783agreedRP-190545approved15.5.0
38.3310867115.4.0Rel-15Corrections to reestablishment procedureR2-1902586agreedRP-190541approved15.5.0
38.3310866215.4.0Rel-15Further update of Need codesR2-1902795agreedRP-190545approved15.5.0
38.3310865-15.4.0Rel-15Dummify the ue-BeamLockFunction IER2-1900769agreedRP-190540approved15.5.0
38.3310864115.4.0Rel-15Correction on RRC processing delayR2-1902660agreedRP-190542approved15.5.0
38.3310861115.4.0Rel-15Miscellaneous Corrections for INACTIVER2-1902663agreedRP-190542approved15.5.0
38.3310860215.4.0Rel-15Handling on UE Inactive AS context upon resumeR2-1902744agreedRP-190544approved15.5.0
38.3310858-15.4.0Rel-15Condition on integrity protection for DRBR2-1900748agreedRP-190550approved15.5.0
38.3310855115.4.0Rel-15CR to introduce simultaneousRxDataSSB-DiffNumerology for NR SAR2-1902640agreedRP-190542approved15.5.0
38.3310853115.4.0Rel-15HandoverPreparationInformation for CU/DUR2-1902614agreedRP-190541approved15.5.0
38.3310850215.4.0Rel-15Clarification to monitoring occasion of PWS notificationR2-1902786agreedRP-190545approved15.5.0
38.3310847215.4.0Rel-15Correction to SIB1 transmission during handoverR2-1902738agreedRP-190543approved15.5.0
38.3310843115.4.0Rel-15EUTRA UE capability filtering in NR UE capability enquiryR2-1902821agreedRP-190546approved15.5.0
38.3310836115.4.0Rel-15Upon entering a new PLMN which is in the list of EPLMNs in RRC INACTIVE stateR2-1902588agreedRP-190541approved15.5.0
38.3310828215.4.0Rel-15Clarification on the BWP id configurationR2-1902541agreedRP-190541approved15.5.0
38.3310823215.4.0Rel-15Clarification on dedicated serving cell configuration in Re-establishmentR2-1902813agreedRP-190545approved15.5.0
38.3310822215.4.0Rel-15Correction to EUTRA-MBSFN-SubframeConfigR2-1902682agreedRP-190543approved15.5.0
38.3310813115.4.0Rel-15Clarifications to BWP configuration optionsR2-1902539agreedRP-190541approved15.5.0
38.3310812215.4.0Rel-15Clarification to channel bandwidth signallingR2-1902778agreedRP-190544approved15.5.0
38.3310811115.4.0Rel-15Clarifying handling of parent and child IE need nodesR2-1902538agreedRP-190540approved15.5.0
38.3310810215.4.0Rel-15Correction to SCG failureR2-1902712agreedRP-190543approved15.5.0
38.3310808215.4.0Rel-15CR to 38.331 on MAC configurationR2-1902575agreedRP-190541approved15.5.0
38.3310807315.4.0Rel-15Miscellaneous non-controversial correctionsR2-1902788agreedRP-190545approved15.5.0
38.3310805215.4.0Rel-15Clarification UE Capability Request FilteringR2-1902818agreedRP-190546approved15.5.0
38.3310803115.4.0Rel-15Clarification on FeatureSetCombinationId zero valueR2-1902629agreedRP-190542approved15.5.0
38.3310800115.4.0Rel-15Search space configuration for cross carrier schedulingR2-1902542agreedRP-190541approved15.5.0
38.3310799215.4.0Rel-15Describing mandatory/optional information in inter-node RRC messagesR2-1902787agreedRP-190545approved15.5.0
38.3310798215.4.0Rel-15CR to 38.331 on clarification of reportCGIR2-1902816agreedRP-190546approved15.5.0
38.3310797215.4.0Rel-15Correction to SI Reqeust ProcedureR2-1902609agreedRP-190541approved15.5.0
38.3310796215.4.0Rel-15Correction on Mapping between SSBs and PDCCH Monitoring Occasions in SI WindowR2-1902603agreedRP-190541approved15.5.0
38.3310792215.4.0Rel-15Capability for aperiodic CSI-RS triggering with different numerology between PDCCH and CSI-RS  RP-190633approved15.5.0
38.3310593215.4.0Rel-15Removal of creation of MCG MAC entityR2-1902582agreedRP-190541approved15.5.0
38.3310416415.4.0Rel-15Clarification on hopping parameters for PUSCHR2-1902543agreedRP-190541approved15.5.0