• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 33 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
36.3314100-15.6.0Rel-15MR-DC measurement gap pattern capabilityR2-1911816agreedRP-192193approved15.7.0
36.3314098115.6.0Rel-15CR to introduce NR SS-SINR measurement capability in LTE  RP-192279approved15.7.0
36.3314097115.6.0Rel-15Correction on overheating indication and RLM reportR2-1911823agreedRP-192194approved15.7.0
36.3314092115.6.0Rel-15Correction on stop condition of T380R2-1911615agreedRP-192196approved15.7.0
36.3314091115.6.0Rel-15Correction on RRC connection release indication after handoverR2-1911876agreedRP-192196approved15.7.0
36.3314086115.6.0Rel-15Corrections to SIB12 for CMAS geo-fencingR2-1911626agreedRP-192198approved15.7.0
36.3314081215.6.0Rel-15Support of LCID change for (NG)EN-DC and NE-DCR2-1911874agreedRP-192194approved15.7.0
36.3314080-15.6.0Rel-15Correction on 36.331 for reconfiguration of SCG part of DRBs in NE-DCR2-1910922agreedRP-192190approved15.7.0
36.3314079115.6.0Rel-15Miscellaneous Corrections on 36.331 for MR-DCR2-1911742agreedRP-192192approved15.7.0
36.3314077315.6.0Rel-15AS-ConfigNR at handover with (NG)EN-DCR2-1911870agreedRP-192194approved15.7.0
36.3314073-15.6.0Rel-15Correction to ROHC handlingR2-1910546agreedRP-192196approved15.7.0
36.3314072115.6.0Rel-15Correction to sTTI and sPT capability reportingR2-1911611agreedRP-192197approved15.7.0
36.3314071-15.6.0Rel-15Clarification on inter-node messageR2-1910535agreedRP-192196approved15.7.0
36.3314070-15.6.0Rel-15Support of SUO case1 for NE-DCR2-1910234agreedRP-192190approved15.7.0
36.3314068-15.6.0Rel-15Correction to the field description of numDRX-CyclesRelaxed in WUS-Config-NBR2-1910159agreedRP-192197approved15.7.0
36.3314066-15.6.0Rel-15Correction to table references for SIB1 scheduling in TDDR2-1910152agreedRP-192197approved15.7.0
36.3314064115.6.0Rel-15Correction to the description of DL channel qualityR2-1911571agreedRP-192195approved15.7.0
36.3314062115.6.0Rel-15Adding P-EUTRA for supporting power coordination in NE-DCR2-1911867agreedRP-192193approved15.7.0
36.3314061-15.6.0Rel-15Correction of security algorithms at inter-RAT handover to LTE-5GC (Alt1)R2-1910111agreedRP-192190approved15.7.0
36.3314058115.6.0Rel-15Correction to s-Measure for NE-DC (36.331)R2-1911738agreedRP-192192approved15.7.0
36.3314056215.6.0Rel-15Editorial/ minor corrections collected by RapporteurR2-1911878agreedRP-192198approved15.7.0
36.3314055115.6.0Rel-15Correction of the condition HO-toEUTRANR2-1911722agreedRP-192192approved15.7.0
36.3314044-15.6.0Rel-15PDU session release indication to upper layers during Full Configuration in eLTER2-1909410agreedRP-192196approved15.7.0
36.3314043-15.6.0Rel-15Support of Idle mode measurement in E-UTRA/5GCR2-1909405agreedRP-192196approved15.7.0
36.3314042215.6.0Rel-15Intra-E-UTRA inter-system HOR2-1911810agreedRP-192196approved15.7.0
36.3314038115.6.0Rel-15Missing reportAddNeighMeas in ReportConfigInterRATR2-1911725agreedRP-192192approved15.7.0
36.3314035115.6.0Rel-15Clarification on mobility of UE configured with SN terminated DRB without SCGR2-1911724agreedRP-192192approved15.7.0
36.3314034115.6.0Rel-15Clarification to fullConfig in EN-DCR2-1911723agreedRP-192194approved15.7.0
36.3314032-15.6.0Rel-15Correcting algorithm key derivation for LTE/5GC in connection resumeR2-1908985agreedRP-192196approved15.7.0
36.3314031-15.6.0Rel-15Additional capability signalling for 1024QAM supportR2-1908874agreedRP-192298approved15.7.0
36.3314030115.6.0Rel-15Correction on the field description of nprach-SubCarrierIndexR2-1911574agreedRP-192197approved15.7.0
36.3314028215.6.0Rel-15Clarification for mixed operation modeR2-1911585agreedRP-192197approved15.7.0
36.3313986315.6.0Rel-15Correction on handling of SCell(s) during Make Before Break handoverR2-1911610agreedRP-192195approved15.7.0