• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 61 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
38.1330589-16.2.0Rel-16PRACH configurations in FR1 SSB based BFR testsR4-2002334agreedRP-200401approved16.3.0
38.1330587-16.2.0Rel-16PRACH configurations in FR1 SSB based RLM testsR4-2002332agreedRP-200401approved16.3.0
38.1330582-16.2.0Rel-16CR for conditions for cross link interference measurements (section B)R4-2002255agreedRP-200370approved16.3.0
38.1330580-16.2.0Rel-16CR 38.133 (8.11) Corrections to PSCell change delay requirementsR4-2002083agreedRP-200401approved16.3.0
38.1330578-16.2.0Rel-16CR 38.133 (8.3.2) Correction of error in Rel-16 SCell activationR4-2002080agreedRP-200401approved16.3.0
38.1330564-16.2.0Rel-16NR editorial correctionR4-2001926agreedRP-200401approved16.3.0
38.1330558116.2.0Rel-16CR to 38.133 to address NR-U inter-RAT measurementsR4-2002285agreedRP-200371approved16.3.0
38.1330551116.2.0Rel-16Correction on handover requirements for SRVCCR4-2002240agreedRP-200376approved16.3.0
38.1330548116.2.0Rel-16CR on direct SCell activation delayR4-2002237agreedRP-200406approved16.3.0
38.1330547-16.2.0Rel-16CR on Interruptions at SCell activation/deactivation in async NR-DCR4-2001626agreedRP-200406approved16.3.0
38.1330546116.2.0Rel-16CR on CLI measurement accuracy requirementsR4-2002254agreedRP-200370approved16.3.0
38.1330545116.2.0Rel-16CR on CLI measurement requirementsR4-2002220agreedRP-200370approved16.3.0
38.1330544-16.2.0Rel-16OCNG pattern for TDM-ed SSB R16R4-2001620agreedRP-200401approved16.3.0
38.1330542-16.2.0Rel-16CR on cell reselection test cases for FR2 SA R16R4-2001618agreedRP-200401approved16.3.0
38.1330540-16.2.0Rel-16CR on SSB RLM test cases SA R16R4-2001616agreedRP-200401approved16.3.0
38.1330538-16.2.0Rel-16CR on SSB RLM test cases EN-DC R16R4-2001614agreedRP-200401approved16.3.0
38.1330532-16.2.0Rel-16Correction to UL reconfiguration delay TCs_r16R4-2001605agreedRP-200401approved16.3.0
38.1330530-16.2.0Rel-16Correction to RRC release with redirection TCs_r16R4-2001603agreedRP-200401approved16.3.0
38.1330528-16.2.0Rel-16Correction to RF channels configuration_r16R4-2001601agreedRP-200401approved16.3.0
38.1330520-16.2.0Rel-16Correction to configurations for TRS_r16R4-2001593agreedRP-200401approved16.3.0
38.1330518-16.2.0Rel-16Correction to inter-RAT measurement on LTE serving carrrier_r16R4-2001589agreedRP-200401approved16.3.0
38.1330516-16.2.0Rel-16Correction to BWP switching delay_r16R4-2001587agreedRP-200401approved16.3.0
38.1330512-16.2.0Rel-16CR on introducing UE sidelink timing requirements for NR V2XR4-2001575agreedRP-200374approved16.3.0
38.1330511116.2.0Rel-16CR on DAPS handover requirementsR4-2002223agreedRP-200375approved16.3.0
38.1330510-16.2.0Rel-16CR on inter-band EN-DC and NE-DC synchronous requirementsR4-2001570agreedRP-200401approved16.3.0
38.1330509-16.2.0Rel-16CR on removing one-shot timing adjustment requirements (Cat A)R4-2001569agreedRP-200401approved16.3.0
38.1330502-16.2.0Rel-16Editorial correction of NR SA FR1 L1-RSRP measurement for beam reportingR4-2001399agreedRP-200401approved16.3.0
38.1330500-16.2.0Rel-16Editorial correction of EN-DC FR1 L1-RSRP measurement for beam reportingR4-2001397agreedRP-200401approved16.3.0
38.1330498-16.2.0Rel-16Updates to SA NR interruption requirements for NR-UR4-2001395agreedRP-200371approved16.3.0
38.1330496-16.2.0Rel-16CR to TS 38.133: Addition of TC A.4.7.2.2 (Rel-16)R4-2001374agreedRP-200401approved16.3.0
38.1330494-16.2.0Rel-16CR to TS 38.133: Clarifications to AoA setup Annex A.8 (Rel-16)R4-2001372agreedRP-200401approved16.3.0
38.1330492-16.2.0Rel-16CR to TS 38.133: Clarifications to AoA setup and AoA cell assignement Annex A.5 (Rel-16)R4-2001370agreedRP-200401approved16.3.0
38.1330490-16.2.0Rel-16CR to TS 38.133: Corrections to FR1-FR2 event triggered test cases Annex A.7 (Rel-16)R4-2001368agreedRP-200401approved16.3.0
38.1330488-16.2.0Rel-16CR to TS 38.133: Corrections to FR1-FR2 event triggered test cases Annex A.5 (Rel-16)R4-2001366agreedRP-200401approved16.3.0
38.1330486-16.2.0Rel-16Introduction of n53 into 38.133R4-2001347agreedRP-200382approved16.3.0
38.1330479-16.2.0Rel-16CR to 38.133 NR reporting criteriaR4-2001260agreedRP-200401approved16.3.0
38.1330476216.2.0Rel-16CR on NR V2X initiation SLSS 38.133 -R16R4-2002342agreedRP-200374approved16.3.0
38.1330473116.2.0Rel-16CR of NR V2X RRM(introduction & reliability of GNSS signal)R4-2002228agreedRP-200374approved16.3.0
38.1330468-16.2.0Rel-16CR for SSB based candidate beam detection (section 8.5.5.2)R4-2000919agreedRP-200401approved16.3.0
38.1330466-16.2.0Rel-16CR for measurement restriction in FR2 across CCs (section 8.1.2.3, 8.1.3.3, 8.5.2.3, 8.5.3.3, 8.5.5.3, 8.5.6.3, 9.5.5.1, 9.5.5.2)R4-2000917agreedRP-200401approved16.3.0
38.1330464-16.2.0Rel-16CR for reference correction on L1-RSRP measurement period (section 9.5.3)R4-2000915agreedRP-200401approved16.3.0
38.1330462116.2.0Rel-16Corrections for BWP switch delay R16 (Cat A)R4-2002347agreedRP-200401approved16.3.0
38.1330460116.2.0Rel-16introduce n18 into TS38.133R4-2002862agreedRP-200389approved16.3.0
38.1330457116.2.0Rel-16CR on logged MDT requirements (2, 3.3, 4.3, 5.3)R4-2002262agreedRP-200405approved16.3.0
38.1330455-16.2.0Rel-16CR on RRM requirement for maximum MIMO layer adaptationR4-2000602agreedRP-200372approved16.3.0
38.1330454-16.2.0Rel-16Editorial correction for active TCI state switching delayR4-2000581agreedRP-200401approved16.3.0
38.1330452116.2.0Rel-16CR on interruption requirements for NR V2XR4-2002256agreedRP-200374approved16.3.0
38.1330445116.2.0Rel-16Editorial corrections for 38.133 Perf Part R16 (Cat A)R4-2002330agreedRP-200401approved16.3.0
38.1330441-16.2.0Rel-16Editorial corrections for 38.133 Core Part R16 (Cat A)R4-2000510agreedRP-200401approved16.3.0
38.1330440-16.2.0Rel-16n26 introduction to 38.133R4-2000506agreedRP-200381approved16.3.0
38.1330439116.2.0Rel-16CR on test cases for SA FR2 inter-frequency measurement R16 (section A.7.6.2)R4-2002341agreedRP-200401approved16.3.0
38.1330437116.2.0Rel-16CR for Conditional PSCell addition/change RRM requirementR4-2002226agreedRP-200375approved16.3.0
38.1330429-16.2.0Rel-16Update of Test requirements, FR2 Inter-frequency SS-RSRP accuracy Test casesR4-2000173agreedRP-200401approved16.3.0
38.1330427-16.2.0Rel-16Update of Test Requirements, FR2 Intra-frequency SS-RSRP accuracy Test casesR4-2000171agreedRP-200401approved16.3.0
38.1330425-16.2.0Rel-16Correction to SRS periodicity and Offset for UL transit timing with DRx configR4-2000169agreedRP-200401approved16.3.0
38.1330423-16.2.0Rel-16Removal of Time offset between PCell and PSCell in SA RRM Test casesR4-2000167agreedRP-200401approved16.3.0
38.1330421-16.2.0Rel-16Correction to FR1-E-UTRA Inter-RAT cell re-selection test casesR4-2000164agreedRP-200401approved16.3.0
38.1330419-16.2.0Rel-16Correction to Active UL BWP for SA intra-frequency event triggered reporting with per-UE gapsR4-2000162agreedRP-200401approved16.3.0
38.1330417-16.2.0Rel-16Corrections to RRM Test case A.7.1.1.2R4-2000083agreedRP-200401approved16.3.0
38.1330412116.2.0Rel-16[CR] SCell activation delay 38.133 R16 (Cat A)R4-2002346agreedRP-200401approved16.3.0
38.1330405116.2.0Rel-16[CR] handover requirements 38.133 R16 (Cat A)R4-2002286agreedRP-200401approved16.3.0