• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
Data pager
Data pager
First PagePrevious Page
1
Next PageLast Page
Page size:
PageSizeComboBox
select
 9 items in 1 pages
Spec #CR #Revision #Impacted VersionTarget ReleaseTitleWG TDoc #WG statusTSG TDoc #TSG statusNew Version
38.141-20220116.4.0Rel-16CR to 38.141-2: Annex L clarification on equlisation calculation (L.6) Details R4-2012754 agreedRP-201512approved16.5.0
38.141-20218116.4.0Rel-16CR for TS 38.141-2: Introduction of test tolerance for NR HST PRACH Details R4-2012685 agreedRP-201497approved16.5.0
38.141-20216-16.4.0Rel-16Increase of step size for FR2 in-band blocking conformance test Details R4-2010847 agreedRP-201512approved16.5.0
38.141-20214116.4.0Rel-16CR to TS 38.141-2: Additional requirements for EESS protection (rel-16) Details R4-2012748 agreedRP-201512approved16.5.0
38.141-20212-16.4.0Rel-16CR for TS 38.141-2: NR FR2 test model 2 Details R4-2010493 agreedRP-201512approved16.5.0
38.141-20210-16.4.0Rel-16Clarification CR on NR-FR2-TM3.1 Details R4-2010285 agreedRP-201512approved16.5.0
38.141-20206116.4.0Rel-16CR for TS 38.141-2, Introduction of high speed support declaration for NR HST Details R4-2012683 agreedRP-201497approved16.5.0
38.141-20205-16.4.0Rel-16CR for TS 38.141-2: Add maximum test system uncertainty for NR HST PUSCH with single port and AWGN Details R4-2009787 agreedRP-201497approved16.5.0
38.141-20203-16.4.0Rel-16CR for TS 38.141-2: Introduction of NR PUSCH UL timing adjustment performance requirement for scenario Z Details R4-2009785 agreedRP-201497approved16.5.0