• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 6 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 25.3090004-F6.0.0Rel-6Scheduling Grants as (E-DPDCH+DPDCH/DPCCH) power ratio Details R2-042731    Details RP-040487 rejectedRAN#26R2 EDCH-Stage2 2G
See details 25.30900031F6.0.0Rel-6Proposed rewording on scheduler sections compared to 001r3 Details R2-042728 agreedRAN2#45 Details RP-040486 approvedRAN#26R26.1.0EDCH-Stage2
See details 25.30900022F6.0.0Rel-6Scheduling Grants as E-DPDCH/DPCCH power ratio Details R2-042733    Details RP-040487 approvedRAN#26R26.1.0EDCH-Stage2 2G
See details 25.30900013F6.0.0Rel-6Inclusion of e.g. physical layer model, MAC architecture, detail Node B scheduler mechanism and QoS Control principles Details R2-042730 agreed  Details RP-040486 approvedRAN#26R26.1.0EDCH-Stage2
See details 25.30900012F6.0.0Rel-6inclusion of e.g. physical layer model, MAC architecture, detail Node B scheduler mechanism and QoS Control principles Details R2-042725 revised    Nortel EDCH-Stage2
See details 25.30900011F6.0.0Rel-6inclusion of e.g. physical layer model, MAC architecture, detail Node B scheduler mechanism and QoS Control principles Details R2-042719 revisedRAN2#45   Nortel, Nokia EDCH-Stage2