|
| 25.813 | 0001 | 3 | C | 7.0.0 | Rel-7 | MBMS Transmissions & synchronization requirements and removal of note 1 |
| | | |
RP-060629
| approved | RAN#33 | Motorola, | 7.1.0 | RANFS-Evo |
|
|
| 25.813 | 0001 | 2 | C | 7.0.0 | Rel-7 | MBMS Transmissions & synchronization requirements and removal of note 1 |
R2-062728
| agreed | RAN2#54 | |
RP-060589
| revised | RAN#33 | R2 | | RANFS-Evo |
|
|
| 25.814 | 0010 | 1 | B | 7.0.0 | Rel-7 | Summary of downlink enhancement techniques over reference LTE unicast performance |
R1-062442
| agreed | RAN1#46 | |
RP-060496
| approved | RAN#33 | R1 | 7.1.0 | RANFS-Evo |
|
|
| 25.814 | 0009 | - | B | 7.0.0 | Rel-7 | Generalized CDD scheme for E-UTRA downlink MIMO |
R1-062323
| withdrawn | RAN1#46 | |
| | | R1 | | RANFS-Evo |
|
|
| 25.814 | 0008 | 1 | B | 7.0.0 | Rel-7 | Inclusion of beamfroming Results |
R1-062413
| agreed | RAN1#46 | |
RP-060496
| approved | RAN#33 | R1 | 7.1.0 | RANFS-Evo |
|
|
| 25.814 | 0007 | - | F | 7.0.0 | Rel-7 | LTE Uplink CP duration |
R1-062123
| rejected | RAN1#46 | |
| | | R1 | | RANFS-Evo |
|
|
| 25.814 | 0006 | - | F | 7.0.0 | Rel-7 | E-MBMS channel model |
R1-062056
| withdrawn | RAN1#46 | |
| | | R1 | | RANFS-Evo |
|
|
| 25.814 | 0005 | - | B | 7.0.0 | Rel-7 | UL System Analysis with SDMA |
R1-062055
| rejected | RAN1#46 | |
| | | R1 | | RANFS-Evo |
|
|
| 25.814 | 0004 | 1 | B | 7.0.0 | Rel-7 | DL and UL VoIP capacity characterization for E-UTRA |
R1-062412
| agreed | RAN1#46 | |
RP-060496
| approved | RAN#33 | R1 | 7.1.0 | RANFS-Evo |
|
|
| 25.814 | 0003 | 1 | B | 7.0.0 | Rel-7 | DL MIMO evaluation |
R1-062424
| agreed | RAN1#46 | |
RP-060496
| approved | RAN#33 | R1 | 7.1.0 | RANFS-Evo |
|
|
| 25.814 | 0002 | - | B | 7.0.0 | Rel-7 | DL control signaling encoding |
R1-061913
| rejected | RAN1#46 | |
| | | R1 | | RANFS-Evo |
|
|
| 25.814 | 0001 | - | B | 7.0.0 | Rel-7 | Paging indicators on LTE Layer 1 |
R1-061912
| rejected | RAN1#46 | |
| | | R1 | | RANFS-Evo |
|
|
| 25.912 | 0002 | - | B | 7.0.0 | Rel-7 | Summary of downlink enhancement techniques over reference LTE unicast |
| | | |
RP-060531
| approved | RAN#33 | NTT DoCoMo | 7.1.0 | RANFS-Evo |
|
|
| 25.912 | 0001 | - | B | 7.0.0 | Rel-7 | Bearer and C-plane establishment |
R3-061395
| | RAN3#53 | |
RP-060515
| approved | RAN#33 | R3 | 7.1.0 | RANFS-Evo |
|
|
| 25.913 | 0013 | - | F | 7.2.0 | Rel-7 | Revision of LTE Work Plan |
| | | |
RP-060207
| approved | RAN#31 | Rapporteur of S... | 7.3.0 | RANFS-Evo |
|
|
| 25.913 | 0012 | - | A | 7.2.0 | Rel-7 | Broadcast in LTE |
| | | |
RP-060206
| rejected | RAN#31 | Nokia | | RANFS-Evo |
|
|
| 25.913 | 0011 | 1 | D | 7.2.0 | Rel-7 | Introduction of specfic requirements for support of Broadcast mode in MBMS in LTE |
| | | |
RP-060200
| rejected | RAN#31 | Orange, China M... | | RANFS-Evo |
|
|
| 25.913 | 0011 | - | A | 7.2.0 | Rel-7 | Introduction of specfic requirements for support of Broadcast mode in MBMS in LTE |
| | | |
RP-060132
| revised | RAN#31 | Orange, China M... | | RANFS-Evo |
|
|
| 25.913 | 0010 | 1 | B | 7.2.0 | Rel-7 | Introducing the support of 1.6MHz bandwidth |
| | | |
RP-060210
| approved | RAN#31 | CATT, RITT | 7.3.0 | RANFS-Evo |
|
|
| 25.913 | 0010 | - | C | 7.2.0 | Rel-7 | Introducing the support of 1.6MHz bandwidth |
| | | |
RP-060197
| revised | RAN#31 | CATT, RITT | | RANFS-Evo |
|
|
| 25.913 | 0010 | - | C | 7.1.0 | Rel-7 | Introducing the support of 1.6MHz bandwidth |
| | | |
RP-060080
| revised | RAN#31 | CATT, RITT | | RANFS-Evo |
|
|
| 25.913 | 0009 | - | F | 7.1.0 | Rel-7 | Revision of LTE Work Plan |
| | | |
RP-050905
| approved | RAN#30 | Rapporteur | 7.2.0 | RANFS-Evo |
|
|
| 25.913 | 0008 | - | C | 7.1.0 | Rel-7 | The support of 1.6MHz bandwidth |
| | | |
RP-050834
| rejected | RAN#30 | CATT, RITT | | RANFS-Evo |
|
|
| 25.913 | 0007 | - | F | 7.0.0 | Rel-7 | Change of LTE Work Plan |
| | | |
RP-050616
| approved | RAN#29 | Rapporteur | 7.1.0 | RANFS-Evo |
|
|
| 25.913 | 0004 | 1 | F | 7.0.0 | Rel-7 | Introduction of high-level deployment scenarios |
| | | |
RP-050638
| approved | RAN#29 | Vodafone, | 7.1.0 | RANFS-Evo |
|
|
| 25.913 | 0004 | - | F | 7.0.0 | Rel-7 | Introduction of high-level deployment scenarios |
| | | |
RP-050624
| revised | RAN#29 | Vodafone, | | RANFS-Evo |
|
|
| 25.913 | 0003 | - | F | 7.0.0 | Rel-7 | Clarification of interruption times requirements |
| | | |
RP-050623
| rejected | RAN#29 | Vodafone, | | RANFS-Evo |
|
|
| 25.913 | 0002 | - | F | 7.0.0 | Rel-7 | Modification on clause 12.1 (b) on re-use |
| | | |
RP-050622
| approved | RAN#29 | Vodafone, | 7.1.0 | RANFS-Evo |
|
|
| 25.913 | 0001 | - | F | 7.0.0 | Rel-7 | Change of intra EUTRAN and EUTRAN-GERAN/UTRAN mobility requirements |
| | | |
RP-050621
| postponed | RAN#29 | Ericsson | | RANFS-Evo |
|