• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 8 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 21.9040008-F3.2.0R1999Reflection of the decision to stop work on the TR after December 2000, and miscellaneous editorial corrections Details T2-000678 agreedT2#11 Details TP-000194 approvedT#10T23.3.0UCR
See details 21.9040007-F3.1.0R1999Reflection of document structure changes in core specifications and correction of editorial mistakes in the main text Details T2-000543 agreedT2#10 Details TP-000143 approvedT#09T23.2.0UCR
See details 21.9040006-F3.1.0R1999Reflection of document structure changes in core specifications and correction of editorial mistakes in the annexes Details T2-000437 agreedT2#10 Details TP-000143 approvedT#09T23.2.0UCR
See details 21.9040005-F3.0.1R1999Reflection of document structure changes in core specifications and correction of editorial mistakes Details T2-000267 agreed Details TP-000073 approvedT#08T23.1.0UCR
See details 21.9040004-F3.0.1R1999Reflection of changes in core specification 24.008 to v3.3.1 Details T2-000268 agreed Details TP-000073 approvedT#08T23.1.0UCR
See details 21.9040003-F3.0.1R1999Deletion of PCPCH/AICH timing relation Details T2-000340 agreed Details TP-000073 approvedT#08T23.1.0UCR
See details 21.9040002-F3.0.1R1999Correction of terminology Details T2-000269 agreed Details TP-000073 approvedT#08T23.1.0UCR
See details 21.9040001-F3.0.1R1999Addition of reference measurement channel Details T2-000270 agreed Details TP-000073 approvedT#08T23.1.0UCR