• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
Page size:
PageSizeComboBox
select
 787 items in 4 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 22.0780138-A5.5.0Rel-5removal of handling of e-parameters provided by the SCP Details S1-020629 agreed Details SP-020044 approvedSA-#15S15.6.0CAMEL3
See details 22.0780137-A4.4.0Rel-4removal of handling of e-parameters provided by the SCP Details S1-020628 agreed Details SP-020044 approvedSA-#15S14.5.0CAMEL3
See details 22.0780136-F3.8.0R1999removal of handling of e-parameters provided by the SCP Details S1-020627 agreed Details SP-020044 approvedSA-#15S13.9.0CAMEL3
See details 22.0780124-F4.3.0Rel-4Removal of Volume charging for GPRS Session Details 991 agreed  Details SP-010674 approvedSA-#14S14.4.0CAMEL3
See details 22.0780106-A5.2.0Rel-522.078-106 on Clarification of CUG requirements (CAMEL3, REL-5, Category A, version 5.2.0) Details S1-010310 agreed Details SP-010250 approvedSA-#12S15.3.0CAMEL3 2G
See details 22.0780105-A4.2.0Rel-422.078-105 on Clarification of CUG requirements (CAMEL3, REL-4, Category A, version 4.1.0) Details S1-010309 agreed Details SP-010250 approvedSA-#12S14.3.0CAMEL3 2G
See details 22.0780104-F3.7.0R199922.078-104 on Clarification of CUG requirements (CAMEL3, R99, Category F, version 3.7.0) Details S1-010543 agreed Details SP-010250 approvedSA-#12S13.8.0CAMEL3 2G
See details 22.07801011F3.7.0R1999Clarification of PDP context QoS change notification to the CSE (CAMEL3) Details S1-010460 agreed Details SP-010249 approvedSA-#12S13.8.0CAMEL3 2G
See details 22.0780097-A5.1.0Rel-5Correction of interaction between CAMEL and BOIC Details S1-010115 agreed Details SP-010048 approvedSA-#11S15.2.0CAMEL3 2G
See details 22.0780096-A4.1.0Rel-4Correction of interaction between CAMEL and BOIC Details S1-010114 agreed Details SP-010048 approvedSA-#11S14.2.0CAMEL3 2G
See details 22.0780095-F3.6.0R1999Correction of interaction between CAMEL and BOIC Details S1-010113 agreed Details SP-010048 approvedSA-#11S13.7.0CAMEL3 2G
See details 22.07800941A5.1.0Rel-5Interaction between CAMEL control of MO-/MT-SMS and Call Barring & ODB Details S1-010118 agreed Details SP-010047 approvedSA-#11S15.2.0CAMEL3 2G
See details 22.07800932A4.1.0Rel-4Interaction between CAMEL control of MO-SMS and Call Barring & ODB Details S1-010117 agreed Details SP-010047 approvedSA-#11S14.2.0CAMEL3 2G
See details 22.07800922F3.6.0R1999Interaction between CAMEL control of MO-SMS and Call Barring & ODB Details S1-010116 agreed Details SP-010047 approvedSA-#11S13.7.0CAMEL3 2G
See details 22.07800863A4.1.0Rel-4Corrections of congestion control procedure Details S1-010189 agreed Details SP-010050 approvedSA-#11S14.2.0CAMEL3 2G
See details 22.07800853F3.6.0R1999Corrections of congestion control procedure Details S1-010188 agreed Details SP-010050 approvedSA-#11S13.7.0CAMEL3 2G
See details 22.07800801A5.1.0Rel-5Alignment with stage 2 & 3, and some editorial corrections Details S1-010106 agreed Details SP-010045 approvedSA-#11S15.2.0CAMEL3 2G
See details 22.07800793F4.1.0Rel-4Alignment with stage 2 & 3, and some editorial corrections Details S1-010105 agreed Details SP-010045 approvedSA-#11S14.2.0CAMEL3 2G
See details 22.07800772A4.1.0Rel-4Support of previous phases of CAMEL Details S1-010108 agreed Details SP-010046 approvedSA-#11S14.2.0CAMEL3 2G
See details 22.07800761F3.6.0R1999Support of previous phases of CAMEL Details S1-010107 agreed Details SP-010046 approvedSA-#11S13.7.0CAMEL3 2G
See details 22.07800752F3.6.0R1999Remedy for incorrect implementation of 22.078-062r5 Details S1-010104 agreed Details SP-010045 approvedSA-#11S13.7.0CAMEL3 2G
See details 22.07800721F3.5.0R1999Removal of Volume charging for GPRS Session Details S1-000750 agreed Details SP-000698 approvedSA-#10S13.6.0CAMEL3
See details 22.0780072-F3.4.1R1999Removal of Volume charging for GPRS Session Details S1-000750 agreed Details SP-000538 withdrawnSA-#10S1 CAMEL3
See details 22.0780067-A5.0.0Rel-5Introduction of GGSN Address Details S1-000857 agreed Details SP-000537 approvedSA-#10S15.1.0CAMEL3
See details 22.0780066-A4.0.0Rel-4Introduction of GGSN Address Details S1-000856 agreed Details SP-000537 approvedSA-#10S14.1.0CAMEL3
See details 22.0780065-F3.5.0R1999Introduction of GGSN Address Details S1-000855 agreed Details SP-000537 approvedSA-#10S13.6.0CAMEL3
See details 22.07800625F3.5.0R1999Alignment with stage 2 & 3, and editorial clarification Details S1-000751 agreed Details SP-000698 approvedSA-#10S13.6.0CAMEL3 2G
See details 22.07800624F3.5.0R1999Alignment with stage 2 & 3, and editorial clarification Details S1-000751 agreed Details SP-000688 revisedSA-#10S1 CAMEL3 2G
See details 22.07800623F3.4.1R1999Alignment with stage 2 & 3, and editorial clarification Details S1-000751 agreed Details SP-000538 withdrawnSA-#10S1 CAMEL3
See details 22.0780029-F R1999Clarification the behaviour when network provided dialled services are used Details S1-99772 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780028-B R1999Addition of CCBS to the SS Invocation Notification Details S1-99777 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780027-C R1999Support For MSP Phase 2 Details S1-99776 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780026-B R1999CAMEL3 Call Forwarding and new TDP interworking Details S1-99775 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780025-D R1999Charging clarifications for MO-SMS Details S1-99774 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780024-F R1999CAMEL3 corrections and clarifications to dialled services (subscribed & serving network) Details S1-99773 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780023-C R1999Description of CAMEL Subscription Information Details S1-99771 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780022-C R1999CAMEL3 corrections to new Trigger Detection Points (TDP) Details S1-99770 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780021-C R1999Defining Successful SM submission and Unsuccessful SM submission as EDP-N and EDP-R. Details S1-99689 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780020-C R1999Removing the 40-octet restriction of free format data Details S1-99686 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780019-C R1999Removing the restriction on the total number of trigger criteria. Details S1-99684 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780018-C R1999Short Message Submission Handling Details S1-99681 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780017-F R1999Corrections to CAMEL interworking with GPRS Details S1-99677 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780016-F R1999Correction Annex A.2; Information sent by the CSE Details S1-99675 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780015-F R1999Interworking with SAT and MExE ! Details S1-99673 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780014-C R1999Defining successful SM submission to SMSC as EDP (CAMEL3) Details S1-99598 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780013-F R1999CAMEL3 clean-up of IPLMN and VPLMN references Details S1-99597 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780012-C R1999CAMEL3 DTMF Mid-Call corrections and clarifications Details S1-99596 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780011-B R1999CAMEL3 interworking with GPRS; Change of position Details S1-99594 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780010-D R1999Editorial update of references for GSM/3GPP use. Details S1-99590 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780009-F R1999Clarification on the type of number used by mobile stations. Details S1-99345 agreedSA1-SMG1-VHE Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780008-F R1999GSM 02.78 Clean-up of CAMEL phase information Details S1-99342 agreedSA1-SMG1-VHE Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780007-F R1999Correct the unsuccessful call establishment procedure for MT calls Details S1-99341 agreedSA1-SMG1-VHE Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780006-F R1999Clarification the behaviour when network provided dialled services are used. Details S1-99339 agreedSA1-SMG1-VHE Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780005-C R1999Inclusion of Service Key in Mobility Management event notifications + editorial modifications Details S1-99338 agreedSA1-SMG1-VHE Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780004-F R1999Clarify the serving network behaviour when instructions from the CSE are received. Details S1-99333 agreedSA1-SMG1-VHE Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780003-C R1999CSE related overload control Details S1-99290 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780002-C R1999CAMEL control of packet switched MO SMS Details S1-99272 agreedSA1-SMG1-VHE Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.0780001-F R1999CAMEL control of packet switched MO SMS Details S1-99268 agreed  Details SP-99443 approvedSA-#5s13.1.0CAMEL3
See details 22.1010057-F3.11.0R1999Deleting Encrypted USIM-ME interface Details S1-000797 agreed Details SP-000533 approvedSA-#10S13.12.0CAMEL3
See details 23.0080037-A4.0.0Rel-4Supported CAMEL Phases in VLR is temporary Details N4-010745 agreed  Details NP-010283 approved N44.1.0CAMEL3
See details 23.0080036-F3.5.0R1999Supported CAMEL Phases in VLR is temporary Details N4-010744 agreed  Details NP-010283 approved N43.6.0CAMEL3
See details 23.00800262F3.3.0R1999Editorial changes on 23.008 draft version 3.2.0 Details N4-000097    Details NP-000289 approved N43.4.0CAMEL3
See details 23.0080024-B3.2.0R1999Adding D-CSI to table with Negotiated CAMEL Capability Handling variables Details N2B000413    Details NP-000065 approved N23.3.0CAMEL3
See details 23.00800231F3.2.0R1999Combined on 23.008 Details N2B000412    Details NP-000065 approved N23.3.0CAMEL3
See details 23.00800201C3.2.0R1999Addition of gsmSCF address list to CSI Details N2B000411    Details NP-000065 approved N23.3.0CAMEL3
See details 23.00800122C3.2.0R1999Introduction of 'Notification to CSE flag'to ODB Details N2A000128  CN2-#10 Details NP-000065 approved N23.3.0CAMEL3
See details 23.00800101C3.1.0R1999Combined to 23.008 Details N2-99L21    Details NP-99490 approved N23.2.0CAMEL3
See details 23.0120006-F3.2.0R1999Introduction of Mobility Management event notification into 23.012 procedures Details N4-000383  CN4-#2 Details NP-000289 approved N43.3.0CAMEL3
See details 23.01600081B R1999Introduction of CAMEL phase 3 Details N2-99L18    Details NP-99490 approved N23.3.0CAMEL3
See details 23.0180118-A5.5.0Rel-5Correction to wrong implementation of approved 089r2 and 096 Details N4-030329 agreedCN4#18 Details NP-030095 approvedCN#19N45.6.0CAMEL3
See details 23.0180117-A4.6.0Rel-4Correction to wrong implementation of approved 089r2 and 096 Details N4-030328 agreedCN4#18 Details NP-030095 approvedCN#19N44.7.0CAMEL3
See details 23.01801161F3.11.0R1999Correction to wrong implementation of approved 089r2 and 096 Details N4-030327 revisedCN4#18 Details NP-030095 approvedCN#19N43.12.0CAMEL3
See details 23.0180098-A5.2.0Rel-5Correction on the Active Location Retrieval description Details N4-020135 agreed  Details NP-020023 approved N45.3.0CAMEL3
See details 23.0180097-A4.5.0Rel-4Correction on the Active Location Retrieval description Details N4-020134 agreed  Details NP-020023 approved N44.6.0CAMEL3
See details 23.0180096-F3.10.0R1999Correction on the Active Location Retrieval description Details N4-020133 agreed  Details NP-020023 approved N43.11.0CAMEL3
See details 23.01800912A5.1.0Rel-5Corrections in the ATI mechanism description Details N4-011414 agreedCN4-#11 Details NP-010609 approved N45.2.0CAMEL3
See details 23.01800902A4.4.0Rel-4Corrections in the ATI mechanism description Details N4-011413 agreedCN4-#11 Details NP-010609 approved N44.5.0CAMEL3
See details 23.01800892F3.9.0R1999Corrections in the ATI mechanism description Details N4-011412 agreedCN4-#11 Details NP-010609 approved N43.10.0CAMEL3
See details 23.0180081-A5.1.0Rel-5Handling of Reconnect on leg2 disconnect Details N4-011203 agreedCN4-#10 Details NP-010609 approved N45.2.0CAMEL3
See details 23.0180080-A4.4.0Rel-4Handling of Reconnect on leg2 disconnect Details N4-011202 agreedCN4-#10 Details NP-010609 approved N44.5.0CAMEL3
See details 23.0180079-F3.9.0R1999Handling of Reconnect on leg2 disconnect Details N4-011201 agreedCN4-#10 Details NP-010609 approved N43.10.0CAMEL3
See details 23.0180074-A4.2.0Rel-4Initialisation of variable to monitor activation of CSI's Details N4-010723 agreed  Details NP-010283 approved N44.3.0CAMEL3
See details 23.0180073-F3.7.0R1999Initialisation of variable to monitor activation of CSI's Details N4-010722 agreed  Details NP-010283 approved N43.8.0CAMEL3
See details 23.01800631A3.5.0R1999Correction of Obtain_Routeing_Address for the reconnect case Details N4-000770 agreedCN4-#4 Details NP-000483 approved N43.6.0CAMEL3
See details 23.01800612F3.5.0R1999Update of CAMEL References Details N4-000722 agreedCN4-#4 Details NP-000483 approved N43.6.0CAMEL3
See details 23.01800573F3.5.0R1999Handling of the Call Diversion Treatment Indicator Details N4-000577 agreedCN4-#4 Details NP-000483 approved N43.6.0CAMEL3
See details 23.0180056-F3.5.0R1999Correction to Process ICH_VLR Details N2-000533 agreed  Details NP-000483 approved N43.6.0CAMEL3
See details 23.01800514F3.4.0R1999Correction of Active Retrieval of Location Information procedure Details N4-000394  CN4-#2 Details NP-000289 approved N43.5.0CAMEL3
See details 23.0180048-F3.3.0R1999Correction of CF notification Details N2B000166    Details NP-000065 approved N23.4.0CAMEL3
See details 23.0180047-F3.3.0R1999O-CSI and D-CSI checks for ORLCF calls Details N2B000409    Details NP-000065 approved N23.4.0CAMEL3
See details 23.01800451D3.4.0R1999Correction of CAMEL Incoming Call Handling Details N4-000087    Details NP-000289 approved N43.5.0CAMEL3
See details 23.0180044-F3.3.0R1999Setting the Destination Address for MO calls Details N2B000443    Details NP-000065 approved N23.4.0CAMEL3
See details 23.01800381F3.3.0R1999Definition of Continue CAMEL Handling Details N2B000327    Details NP-000065 approved N23.4.0CAMEL3
See details 23.0180037-F3.3.0R1999Clarification of N-CSI in Core Network Details N2A000146  CN2-#10 Details NP-000065 approved N23.4.0CAMEL3
See details 23.0180034-F3.3.0R1999Correction of the result of the procedure CAMEL_ICH_MSC_INIT Details N2A000072  CN2-#10 Details NP-000065 approved N23.4.0CAMEL3
See details 23.0180033-F3.3.0R1999Initialisation of Backward Call indicator Details N2A000071  CN2-#10 Details NP-000065 approved N23.4.0CAMEL3
See details 23.01800321F3.3.0R1999Inclusion of D-CSI/N-CSI check in HLR/VLR Details N2A000149  CN2-#10 Details NP-000065 approved N23.4.0CAMEL3
See details 23.01800281C3.3.0R1999User interaction and monitoring Details N2B000294    Details NP-000065 rejected N2 CAMEL3
See details 23.01800273C3.2.0R1999Introduction of CAMEL Phase 3 Details N2-99L16    Details NP-99490 approved N23.3.0CAMEL3
See details 23.01800262B3.3.0R1999Alternative solution for ALR Details N2B000326    Details NP-000065 approved N23.4.0CAMEL3
See details 23.06002621A4.2.0Rel-4Correction to CAMEL Procedure Names duringRoutingAreaUpdate Details S2-012951 agreedSA2-#20 Details SP-010706 approvedSA-#14S24.3.0CAMEL3
See details 23.0600262-A Rel-4Correction to CAMEL Procedure Names duringRoutingAreaUpdate Details S2-012751 revisedSA2-#20   S2 CAMEL3
See details 23.06002611F3.9.0R1999Correction to CAMEL Procedure Names duringRoutingAreaUpdate Details S2-012950 agreedSA2-#20 Details SP-010706 approvedSA-#14S23.10.0CAMEL3
See details 23.0600261-F R1999Correction to CAMEL Procedure Names duringRoutingAreaUpdate Details S2-012750 revisedSA2-#20   S2 CAMEL3
See details 23.0720005-F3.2.0R1999Handling of the Call Diversion Treatment Indicator Details N4-000578 agreedCN4-#4 Details NP-000483 approved N43.3.0CAMEL3
See details 23.0720004-F3.2.0R1999Transfer of Procedure Check_CD_SII2 to TS 23.078 Details N2-000273 agreedCN2-#12 Details NP-000483 approved N43.3.0CAMEL3
See details 23.07806861F6.0.0Rel-6GPRS ODB reporting to CAMEL SCP Details N2-040159 agreed  Details NP-040090 revisedCN#23N2 CAMEL3
See details 23.0780654-A4.10.0Rel-4DP Triggering without having armed the TDP Details N2-040017 agreed  Details NP-040090 approvedCN#23N24.11.0CAMEL3
See details 23.0780653-F3.18.0R1999DP Triggering without having armed the TDP Details N2-040016 agreed  Details NP-040090 approvedCN#23N23.19.0CAMEL3
See details 23.0780622-A5.4.0Rel-5Correction in handling of Start-Delta and Stop-Delta operations Details N2-030425 agreedCN2#30 Details NP-030362 approvedCN#21N25.5.0CAMEL3 2G
See details 23.0780621-F3.17.0R1999Correction in handling of Start-Delta and Stop-Delta operations. Details N2-030416 agreedCN2#30 Details NP-030362 approvedCN#21N23.18.0CAMEL3 2G
See details 23.07806002A4.9.0Rel-4Correction in handling of Start-Delta and Stop-Delta operations. Details N2-030417 agreedCN2#30 Details NP-030362 approvedCN#21N24.10.0CAMEL3 2G
See details 23.07806001F4.9.0Rel-4Correction in handling of Start-Delta and Stop-Delta operations. Details N2-030358 revisedCN2#30   N2 CAMEL3 2G
See details 23.0780600-F4.9.0Rel-4Correction in handling of Start-Delta and Stop-Delta operations. Details N2-030329 revisedCN2#30   N2 CAMEL3 2G
See details 23.0780597-F5.3.0Rel-4Removal of blocks Stop Delta from the SDL handling of DPs O/T-Busy, O/T-No Answer and Route Select Failure in Monitoring state. Details N2-030322 withdrawn    N2 CAMEL3 2G
See details 23.07805821A4.8.0Rel-4Behavior of HLR upon location updating in CAMEL Phase 3 Details N2-030276 agreedCN2#29 Details NP-030185 approvedCN#20N24.9.0CAMEL3
See details 23.0780582-A4.8.0Rel-4Behavior of HLR upon location updating in CAMEL Phase 3 Details N2-030251 revisedCN2#29   N2 CAMEL3
See details 23.07805811F3.16.0R1999Behavior of HLR upon location updating in CAMEL Phase 3 Details N2-030275 agreedCN2#29 Details NP-030185 approvedCN#20N23.17.0CAMEL3
See details 23.0780581-F3.16.0R1999Behavior of HLR upon location updating in CAMEL Phase 3 Details N2-030250 revisedCN2#29   N2 CAMEL3
See details 23.0780566-F4.9.0Rel-4Inclusion of check pty continues in procedure Handle_ACR. Details N2-030320 withdrawn    N2 CAMEL3 2G
See details 23.0780546-A5.2.0Rel-5Introduction of ResetTimer input in state WFI-DS Details N2-030123 agreedCN2#28 Details NP-030085 approvedCN#19N25.3.0CAMEL3
See details 23.0780545-A4.7.0Rel-4Introduction of ResetTimer input in state WFI-DS Details N2-030122 agreedCN2#28 Details NP-030085 approvedCN#19N24.8.0CAMEL3
See details 23.0780544-A5.2.0Rel-5Correction to SRI Information Flow Details N2-030117 agreedCN2#28 Details NP-030085 approvedCN#19N25.3.0CAMEL3
See details 23.0780543-A4.7.0Rel-4Correction to SRI Information Flow Details N2-030116 agreedCN2#28 Details NP-030085 approvedCN#19N25.3.0CAMEL3
See details 23.07805411A5.2.0Rel-5Inconsistency in Call Information Report in Re-Connect Case Details N2-030108 agreedCN2#28 Details NP-030085 approvedCN#19N25.3.0CAMEL3
See details 23.0780541-A5.2.0Rel-5Inconsistency in Call Information Report in Re-Connect Case Details N2-030093 revisedCN2#28   N2 CAMEL3
See details 23.07805401A4.7.0Rel-4Inconsistency in Call Information Report in Re-Connect Case Details N2-030107 agreedCN2#28 Details NP-030085 approvedCN#19N24.8.0CAMEL3
See details 23.0780540-A4.7.0Rel-4Inconsistency in Call Information Report in Re-Connect Case Details N2-030092 revisedCN2#28   N2 CAMEL3
See details 23.07805391F3.15.0R1999Inconsistency in Call Information Report in Re-Connect Case Details N2-030106 agreedCN2#28 Details NP-030085 approvedCN#19N23.16.0CAMEL3
See details 23.0780539-F3.15.0R1999Inconsistency in Call Information Report in Re-Connect Case Details N2-030091 revisedCN2#28   N2 CAMEL3
See details 23.07805321F3.15.0R1999Introduction of ResetTimer input in state WFI-DS Details N2-030121 agreedCN2#28 Details NP-030085 approvedCN#19N23.16.0CAMEL3
See details 23.0780532-F3.15.0R1999Introduction of ResetTimer input in state WFI-DS Details N2-030059 revisedCN2#28   N2 CAMEL3
See details 23.0780529-A5.2.0Rel-5Correction to interactions between CAMEL control of MO SMS and barring Details N2-030055  CN2#28 Details NP-030068 approvedCN#19Vodafone5.3.0CAMEL3
See details 23.0780529-A5.2.0Rel-5Correction to interactions between CAMEL control of MO SMS and barring Details N2-030055 rejectedCN2#28   N2 CAMEL3 2G
See details 23.07805281A4.7.0Rel-4Correction to interactions between CAMEL control of MO SMS and barring Details N2-030105  CN2#28 Details NP-030068 approvedCN#19Vodafone4.8.0CAMEL3
See details 23.07805281A4.7.0Rel-4Correction to interactions between CAMEL control of MO SMS and barring Details N2-030105 rejectedCN2#28   N2 CAMEL3 2G
See details 23.0780528-A4.7.0Rel-4Correction to interactions between CAMEL control of MO SMS and barring Details N2-030054 revisedCN2#28   N2 CAMEL3
See details 23.07805271F3.15.0R1999Correction to interactions between CAMEL control of MO SMS and barring Details N2-030104  CN2#28 Details NP-030068 approvedCN#19Vodafone3.16.0CAMEL3
See details 23.07805271F3.15.0R1999Correction to interactions between CAMEL control of MO SMS and barring Details N2-030104 rejectedCN2#28   N2 CAMEL3 2G
See details 23.0780527-F3.15.0R1999Correction to interactions between CAMEL control of MO SMS and barring Details N2-030053 revisedCN2#28   N2 CAMEL3
See details 23.07805211F3.15.0R1999Correction to SRI Information Flow (add T-CSI criteria) Details N2-030115 agreedCN2#28 Details NP-030085 approvedCN#19N23.16.0CAMEL3
See details 23.0780521-F5.2.0R1999Correction to SRI Information Flow (add T-CSI criteria) Details N2-030025 revisedCN2#28   N2 CAMEL3
See details 23.0780512-A5.1.0Rel-5Correction to dialled services criteria Details N2-021058 agreedCN2-#27 Details NP-020524 approved N25.2.0CAMEL3
See details 23.0780511-A4.6.1Rel-4Correction to dialled services criteria Details N2-021057 agreedCN2-#27 Details NP-020524 approved N24.7.0CAMEL3
See details 23.0780510-A4.6.1Rel-4Correction to interaction between MO-SMS and CB / ODB Details N2-021042 agreedCN2-#27 Details NP-020525 approved N24.7.0CAMEL3
See details 23.0780509-F3.14.0R1999Correction to interaction between MO-SMS and CB / ODB Details N2-021041 agreedCN2-#27 Details NP-020525 approved N23.15.0CAMEL3
See details 23.07805081F3.14.0R1999Correction to dialled services criteria Details N2-021056 agreedCN2-#27 Details NP-020524 approved N23.15.0CAMEL3
See details 23.0780508-F3.14.0R1999Correction to dialled services criteria Details N2-021040 revisedCN2-#27   N2 CAMEL3
See details 23.07805072A5.1.0Rel-5Clarification on ATM -> NSDC when status of one SS impacts another SS status. Details N2-021089 agreedCN2-#27 Details NP-020524 approved N25.2.0CAMEL3
See details 23.07805071A5.1.0Rel-5Clarification on ATM -> NSDC when status of one SS impacts another SS status. Details N2-021085 revisedCN2-#27   N2 CAMEL3
See details 23.0780507-A5.1.0Rel-5Clarification on ATM -> NSDC when status of one SS impacts another SS status. Details N2-021031 revisedCN2-#27   N2 CAMEL3
See details 23.07805062A4.6.1Rel-4Clarification on ATM -> NSDC when status of one SS impacts another SS status. Details N2-021088 agreedCN2-#27 Details NP-020524 approved N24.7.0CAMEL3
See details 23.07805061A4.6.0Rel-4Clarification on ATM -> NSDC when status of one SS impacts another SS status. Details N2-021084 revisedCN2-#27   N2 CAMEL3
See details 23.0780506-A4.6.0Rel-4Clarification on ATM -> NSDC when status of one SS impacts another SS status. Details N2-021030 revisedCN2-#27   N2 CAMEL3
See details 23.0780503-A5.1.0Rel-5Behavior if the free format data exceeds 160 octets Details N2-021020 rejectedCN2-#27   N2 CAMEL3
See details 23.0780502-A4.6.0Rel-4Behavior if the free format data exceeds 160 octets Details N2-021019 rejectedCN2-#27   N2 CAMEL3
See details 23.0780501-F3.14.0R1999Behavior if the free format data exceeds 160 octets Details N2-021018 rejectedCN2-#27   N2 CAMEL3
See details 23.07804983F3.14.0R1999Clarification on ATM -> NSDC when status of one SS impacts another SS status. Details N2-021087 agreedCN2-#27 Details NP-020524 approved N23.15.0CAMEL3
See details 23.07804982F3.14.0R1999Clarification on ATM -> NSDC when status of one SS impacts another SS status. Details N2-021083 revisedCN2-#27   N2 CAMEL3
See details 23.07804981F3.14.0R1999Clarification on ATM -> NSDC when status of one SS impacts another SS status. Details N2-021029 revisedCN2-#27   N2 CAMEL3
See details 23.0780498-F3.14.0R1999Clarification on ATM -> NSDC when status of one SS impacts another SS status. Details N2-021012 revisedCN2-#27   N2 CAMEL3
See details 23.0780493-A4.6.0Rel-4Inconsistent description Store destination address Details N2-020993 rejectedCN2-#27   N2 CAMEL3
See details 23.0780492-F3.14.0R1999Inconsistent description Store destination address Details N2-020992 rejectedCN2-#27   N2 CAMEL3
See details 23.07804891A5.1.0Rel-5Number comparison for D-CSI Details N2-021038 agreedCN2-#27 Details NP-020524 approved N25.2.0CAMEL3
See details 23.07804881A4.6.1Rel-4Number comparison for D-CSI Details N2-021037 agreedCN2-#27 Details NP-020524 approved N24.7.0CAMEL3
See details 23.0780488-A4.6.0Rel-4Number comparison for D-CSI Details N2-020984 revisedCN2-#27   N2 CAMEL3
See details 23.07804871F3.14.0R1999Number comparison for D-CSI Details N2-021036 agreedCN2-#27 Details NP-020524 approved N23.15.0CAMEL3
See details 23.0780487-F3.14.0R1999Number comparison for D-CSI Details N2-020983 revisedCN2-#27   N2 CAMEL3
See details 23.0780480-A5.1.0Rel-5Correction to QoS reporting and delta timer overflow Details N2-020940 agreedCN2-#26 Details NP-020523 approved N25.2.0CAMEL3
See details 23.0780479-A4.6.1Rel-4Correction to QoS reporting and delta timer overflow Details N2-020939 agreedCN2-#26 Details NP-020523 approved N24.7.0CAMEL3
See details 23.0780478-F3.14.0R1999Correction to QoS reporting and delta timer overflow Details N2-020931 agreedCN2-#26 Details NP-020523 approved N23.15.0CAMEL3
See details 23.0780477-A5.1.0Rel-5Correction to handling when Delta is greater than received maximum threshold Details N2-020914 withdrawnCN2-#26   N2 CAMEL3
See details 23.0780476-A4.6.0Rel-4Correction to handling when Delta is greater than received maximum threshold Details N2-020913 withdrawnCN2-#26   N2 CAMEL3
See details 23.07804692A4.6.1Rel-4Alignement between 23.078 and 29.002 about RCH Details N2-020938 agreedCN2-#26 Details NP-020523 approved N24.7.0CAMEL3
See details 23.07804691A4.6.0Rel-4Alignement between 23.078 and 29.002 about RCH Details N2-020897 revisedCN2-#26   N2 CAMEL3
See details 23.0780469-A4.6.0Rel-4Alignement between 23.078 and 29.002 about RCH Details N2-020872 revisedCN2-#26   N2 CAMEL3
See details 23.07804683F3.14.0R1999Alignement between 23.078 and 29.002 about RCH Details N2-020937 agreedCN2-#26 Details NP-020523 approved N23.15.0CAMEL3
See details 23.07804682F3.14.0R1999Alignement between 23.078 and 29.002 about RCH Details N2-020901 revisedCN2-#26   N2 CAMEL3
See details 23.07804681F3.14.0R1999Alignement between 23.078 and 29.002 about RCH Details N2-020896 revisedCN2-#26   N2 CAMEL3
See details 23.0780468-F3.14.0R1999Alignement between 23.078 and 29.002 about RCH Details N2-020871 revisedCN2-#26   N2 CAMEL3
See details 23.07804641F3.14.0R1999Correction to Dialled Services criteria Details N2-020929 postponed    N2 CAMEL3
See details 23.0780464-F3.14.0R1999Correction to Dialled Services criteria Details N2-020846 revisedCN2-#26   N2 CAMEL3
See details 23.0780463-F3.14.0R1999Correction to destinationAddress parameter in T_Answer and O_Answer Details N2-020845 withdrawnCN2-#26   N2 CAMEL3
See details 23.07804621F3.14.0R1999Correction to forwardedCall parameter in T_Answer and O_Answer Details N2-020911 withdrawnCN2-#26   N2 CAMEL3
See details 23.0780462-F3.14.0R1999Correction to forwardedCall parameter in T_Answer and O_Answer Details N2-020844 revisedCN2-#26   N2 CAMEL3
See details 23.0780461-A5.1.0Rel-5Correction to interaction between MO-SMS and CB / ODB Details N2-021002 agreedCN2-#27 Details NP-020525 approved N25.2.0CAMEL3
See details 23.0780461-A5.1.0Rel-5Correction to interaction between MO-SMS and CB / ODB Details N2-020841 postponedCN2-#26   N2 CAMEL3
See details 23.0780460-F3.14.0R1999Correction to reporting of subscribed QoS at PDPc Establishment Details N2-020837 rejectedCN2-#26   N2 CAMEL3
See details 23.0780459-F3.14.0R1999Deferral of QoS induced ACR-GPRS when waiting for ACH-GPRS Details N2-020835 withdrawnCN2-#26   N2 CAMEL3
See details 23.07804581F3.14.0R1999Correction to handling when Delta is greater than received maximum threshold Details N2-020912 withdrawnCN2-#26   N2 CAMEL3
See details 23.0780458-F3.14.0R1999Correction to handling when Delta is greater than received maximum threshold Details N2-020834 revisedCN2-#26   N2 CAMEL3
See details 23.0780450-A5.0.0Rel-5CAMEL3 inter-working with Rel-4 GPRS barring Details N2-020755 agreedCN2-#25 Details NP-020341 approved N25.1.0CAMEL3
See details 23.07804461F5.0.0Rel-5Secondary PDP context for DP change of position context Details N2-020747 agreedCN2-#25 Details NP-020342 approved N25.1.0CAMEL3
See details 23.0780446-A5.0.0Rel-5Secondary PDP context for DP change of position context Details N2-020721 revisedCN2-#25   N2 CAMEL3
See details 23.0780445-A4.5.1Rel-4Secondary PDP context for DP change of position context Details N2-020720 rejectedCN2-#25   N2 CAMEL3
See details 23.0780444-F3.13.0R1999Secondary PDP context for DP change of position context Details N2-020719 rejectedCN2-#25   N2 CAMEL3
See details 23.07804431A5.0.0Rel-5Inconsistent description on ACR: time information Details N2-020744 agreedCN2-#25 Details NP-020340 approved N25.1.0CAMEL3
See details 23.0780443-A5.0.0Rel-5Inconsistent description on ACR: time information Details N2-020718 revisedCN2-#25   N2 CAMEL3
See details 23.07804421A4.5.1Rel-4Inconsistent description on ACR: time information Details N2-020743 agreedCN2-#25 Details NP-020340 approved N24.6.0CAMEL3
See details 23.0780442-A4.5.0Rel-4Inconsistent description on ACR: time information Details N2-020717 revisedCN2-#25   N2 CAMEL3