• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 18 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 25.30000461B13.2.0Rel-14Introduction of simultaneous setup and release of RABs and RBs Details R2-165739 agreedRAN2#95Ericsson Details RP-161748 approvedRAN#73RAN214.0.0UTRA_RRCopt-Core
See details 25.3000046-B13.2.0Rel-14Introduction of simultaneous RAB/RB setup and release Details R2-165225 revisedRAN2#95Ericsson    UTRA_RRCopt-Core
See details 25.30000451B13.2.0Rel-14Introduction of RRC events for UPH reporting Details R2-165736 agreedRAN2#95Ericsson Details RP-161748 approvedRAN#73RAN214.0.0UTRA_RRCopt-Core
See details 25.3000045-B13.2.0Rel-14Introduction of RRC events for UPH reporting Details R2-165222 revisedRAN2#95Ericsson    UTRA_RRCopt-Core
See details 25.3000042-B13.1.0Rel-14Introduction of UPH measurements Details R2-163947 postponedRAN2#94Ericsson    UTRA_RRCopt-Core
See details 25.3000041-B13.1.0Rel-14Introduction of simultaneous setup and release Details R2-163946 postponedRAN2#94Ericsson    UTRA_RRCopt-Core
See details 25.30605091B13.1.0Rel-14Introduction of simultaneous setup and release of RABs and RBs Details R2-165740 agreedRAN2#95Ericsson Details RP-161748 approvedRAN#73RAN214.0.0UTRA_RRCopt-Core
See details 25.3060509-B13.1.0Rel-14Introduction of simultaneous RAB/RB setup and release Details R2-165226 revisedRAN2#95Ericsson    UTRA_RRCopt-Core
See details 25.30605081B13.1.0Rel-14Introduction of RRC events for UPH reporting Details R2-165737 agreedRAN2#95Ericsson Details RP-161748 approvedRAN#73RAN214.0.0UTRA_RRCopt-Core
See details 25.3060508-B13.1.0Rel-14Introduction of RRC events for UPH reporting Details R2-165223 revisedRAN2#95Ericsson    UTRA_RRCopt-Core
See details 25.33158813B13.3.0Rel-14Introduction of simultaneous setup and release of RABs and RBs Details R2-165746 agreedRAN2#95Ericsson Details RP-161748 approvedRAN#73RAN214.0.0UTRA_RRCopt-Core
See details 25.33158812B13.3.0Rel-14Introduction of simultaneous RAB/RB setup and release Details R2-165743 revisedRAN2#95Ericsson    UTRA_RRCopt-Core
See details 25.33158811B13.3.0Rel-14Introduction of simultaneous RAB/RB setup and release Details R2-165741 revisedRAN2#95Ericsson    UTRA_RRCopt-Core
See details 25.3315881-B13.3.0Rel-14Introduction of simultaneous RAB/RB setup and release Details R2-165227 revisedRAN2#95Ericsson    UTRA_RRCopt-Core
See details 25.33158801B13.3.0Rel-14Introduction of RRC events for UPH reporting Details R2-165738 agreedRAN2#95Ericsson Details RP-161748 approvedRAN#73RAN214.0.0UTRA_RRCopt-Core
See details 25.3315880-B13.3.0Rel-14Introduction of RRC events for UPH reporting Details R2-165224 revisedRAN2#95Ericsson    UTRA_RRCopt-Core
See details 25.3315864-B13.2.0Rel-14Introduction of UPH measurements Details R2-163541 postponedRAN2#94Ericsson    UTRA_RRCopt-Core
See details 25.3315863-B13.2.0Rel-14Introduction of simultaneous setup and release Details R2-163539 postponedRAN2#94Ericsson    UTRA_RRCopt-Core