• Specification number WG Status
    select
    Meeting
    Target Release
    select
    TSG Status
    select
    Work Item
    Entities
Data pager
Data pager
1
Page size:
PageSizeComboBox
select
 13 items in 1 pages
 Spec #CR #Revision #CR CatImpacted VersionTarget ReleaseTitleWG TDoc #CR status at WGWG meeting refWG Source informationTSG TDoc #CR status at TSGTSG meeting refTSG Source informationNew VersionWork ItemsRemarks
See details 38.101-124121F18.6.0Rel-18(NR_PC2_CA_R17_2BDL_2BUL) Remove superscript NOTE 6 for PC2 TDD-TDD inter-band CA Details R4-2414396 agreedRAN4#112ZTE Corporation... Details RP-242183 approvedRAN#105RAN418.7.0NR_PC2_CA_R17_2...
See details 38.101-12412-F18.6.0Rel-18(NR_PC2_CA_R17_2BDL_2BUL) Remove superscript NOTE 6 for PC2 TDD-TDD inter-band CA Details R4-2411929 revisedRAN4#112ZTE Corporation...    NR_PC2_CA_R17_2...
See details 38.101-124111F17.14.0Rel-17(NR_PC2_CA_R17_2BDL_2BUL) Remove superscript NOTE 6 for PC2 TDD-TDD inter-band CA Details R4-2414395 agreedRAN4#112ZTE Corporation... Details RP-242183 approvedRAN#105RAN417.15.0NR_PC2_CA_R17_2...
See details 38.101-12411-F17.14.0Rel-17(NR_PC2_CA_R17_2BDL_2BUL) Remove superscript NOTE 6 for PC2 TDD-TDD inter-band CA Details R4-2411928 revisedRAN4#112ZTE Corporation...    NR_PC2_CA_R17_2...
See details 38.101-111501F17.6.0Rel-17CR to 38.101-1 Maintenance for HPUE CA with 2 bands downlink and x bands uplink (x =1,2) Details R4-2214596 agreedRAN4#104-eChina Telecom Details RP-222033 approvedRAN#97-eRAN417.7.0NR_PC2_CA_R17_2...
See details 38.101-11150-F17.6.0Rel-17CR to 38.101-1 Maintenance for HPUE CA with 2 bands downlink and x bands uplink (x =1,2) Details R4-2212700 revisedRAN4#104-eChina Telecom    NR_PC2_CA_R17_2...
See details 38.101-11065-B17.5.0Rel-17Big CR to 38.101-1 Introduce RF requirements for HPUE CA with 2 bands downlink and x bands uplink (x =1,2) Details R4-2208335 agreedRAN4#103-eChina Telecom Details RP-221694 approvedRAN#96RAN417.6.0NR_PC2_CA_R17_2...
See details 38.101-11005-B17.4.0Rel-17Big CR to 38.101-1 Introduce RF requirements for HPUE CA with 2 bands downlink and x bands uplink (x =1,2) Details R4-2204197 agreedRAN4#102-eChina Telecom Details RP-220343 approvedRAN#95-eRAN417.5.0NR_PC2_CA_R17_2...
See details 38.101-10955-B17.3.0Rel-17CR to 38.101-1 Introduce RF requirements for HPUE CA with 2 bands downlink and x bands uplink (x =1,2) Details R4-2118320 agreedRAN4#101-eChina Telecom Details RP-212832 approvedRAN#94-eRAN417.4.0NR_PC2_CA_R17_2...
See details 38.101-10891-B17.2.0Rel-17CR to 38.101-1 Introduce RF requirements for HPUE CA with 2 bands downlink and x bands uplink (x =1,2) Details R4-2112495 agreedRAN4#100-eChina Telecom Details RP-211901 approvedRAN#93-eRAN417.3.0NR_PC2_CA_R17_2...
See details 38.101-10805-B17.1.0Rel-17CR to 38.101-1 Introduce RF requirements for HPUE CA with 2 bands downlink and x bands uplink (x =1,2) Details R4-2110052 agreedRAN4#99-eChina Telecom Details RP-211120 approvedRAN#92-eTSG WG RAN417.2.0NR_PC2_CA_R17_2...
See details 38.521-11504-F17.3.0Rel-17Update Tx test cases for PC2 CA_n41C Details R5-220202 withdrawnRAN5#94-eCMCC    NR_PC2_CA_R17_2...
See details 38.521-11503-F17.3.0Rel-17Update Tx test cases for PC1.5 CA_n41C Details R5-220201 withdrawnRAN5#94-eCMCC    NR_PC2_CA_R17_2...