22.101 | TS | Service aspects; Service principles | Under change control |
S1
|
|
23.002 | TS | Network architecture | Under change control |
S2
|
|
23.003 | TS | Numbering, addressing and identification | Under change control |
C4
|
|
23.060 | TS | General Packet Radio Service (GPRS); Service description; Stage 2 | Under change control |
S2
|
|
23.167 | TS | IP Multimedia Subsystem (IMS) emergency sessions | Under change control |
S2
|
|
23.203 | TS | Policy and charging control architecture | Under change control |
S2
|
|
23.216 | TS | Single Radio Voice Call Continuity (SRVCC); Stage 2 | Under change control |
S2
|
|
23.221 | TS | Architectural requirements | Under change control |
S2
|
|
23.228 | TS | IP Multimedia Subsystem (IMS); Stage 2 | Under change control |
S2
|
|
23.237 | TS | IP Multimedia Subsystem (IMS) Service Continuity; Stage 2 | Under change control |
S2
|
|
23.271 | TS | Functional stage 2 description of Location Services (LCS) | Under change control |
S2
|
|
23.401 | TS | General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access | Under change control |
S2
|
|
23.402 | TS | Architecture enhancements for non-3GPP accesses | Under change control |
S2
|
|
23.869 | TR | Support for Internet Protocol (IP) based IP Multimedia Subsystem (IMS) Emergency calls over General Packet Radio Service (GPRS) and Evolved Packet Service (EPS) | Under change control |
S2
|
|
24.008 | TS | Mobile radio interface Layer 3 specification; Core network protocols; Stage 3 | Under change control |
C1
|
|
24.229 | TS | IP multimedia call control protocol based on Session Initiation Protocol (SIP) and Session Description Protocol (SDP); Stage 3 | Under change control |
C1
|
|
24.237 | TS | IP Multimedia (IM) Core Network (CN) subsystem IP Multimedia Subsystem (IMS) service continuity; Stage 3 | Under change control |
C1
|
|
24.301 | TS | Non-Access-Stratum (NAS) protocol for Evolved Packet System (EPS); Stage 3 | Under change control |
C1
|
|
29.163 | TS | Interworking between the IP Multimedia (IM) Core Network (CN) subsystem and Circuit Switched (CS) networks | Under change control |
C3
|
|
29.212 | TS | Policy and Charging Control (PCC); Reference points | Under change control |
C3
|
|
29.213 | TS | Policy and charging control signalling flows and Quality of Service (QoS) parameter mapping | Under change control |
C3
|
|
29.214 | TS | Policy and charging control over Rx reference point | Under change control |
C3
|
|
29.215 | TS | Policy and Charging Control (PCC) over S9 reference point; Stage 3 | Under change control |
C3
|
|
29.272 | TS | Evolved Packet System (EPS); Mobility Management Entity (MME) and Serving GPRS Support Node (SGSN) related interfaces based on Diameter protocol | Under change control |
C4
|
|
29.273 | TS | Evolved Packet System (EPS); 3GPP EPS AAA interfaces | Under change control |
C4
|
|
29.274 | TS | 3GPP Evolved Packet System (EPS); Evolved General Packet Radio Service (GPRS) Tunnelling Protocol for Control plane (GTPv2-C); Stage 3 | Under change control |
C4
|
|
29.275 | TS | Proxy Mobile IPv6 (PMIPv6) based Mobility and Tunnelling protocols; Stage 3 | Under change control |
C4
|
|
29.276 | TS | 3GPP Evolved Packet System (EPS); Optimized handover procedures and protocols between E-UTRAN access and cdma2000 HRPD Access; Stage 3 | Under change control |
C4
|
|
29.280 | TS | Evolved Packet System (EPS); 3GPP Sv interface (MME to MSC, and SGSN to MSC) for SRVCC | Under change control |
C4
|
|
29.332 | TS | Media Gateway Control Function (MGCF) - IM Media Gateway; Mn interface | Under change control |
C4
|
|
29.333 | TS | Multimedia Resource Function Controller (MRFC) - Multimedia Resource Function Processor (MRFP) Mp interface; Stage 3 | Under change control |
C4
|
|
33.401 | TS | 3GPP System Architecture Evolution (SAE); Security architecture | Under change control |
S3
|
|
33.402 | TS | 3GPP System Architecture Evolution (SAE); Security aspects of non-3GPP accesses | Under change control |
S3
|
|
33.821 | TR | Rationale and track of security decisions in Long Term Evolution (LTE) RAN / 3GPP System Architecture Evolution (SAE) | Under change control |
S3
|
|
34.229-1 | TS | Internet Protocol (IP) multimedia call control protocol based on Session Initiation Protocol (SIP) and Session Description Protocol (SDP); User Equipment (UE) conformance specification; Part 1: Protocol conformance specification | Under change control |
R5
|
|
34.229-2 | TS | Internet Protocol (IP) multimedia call control protocol based on Session Initiation Protocol (SIP) and Session Description Protocol (SDP); User Equipment (UE) conformance specification; Part 2: Implementation Conformance Statement (ICS) specification | Under change control |
R5
|
|
36.508 | TS | Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core (EPC); Common test environments for User Equipment (UE) conformance testing | Under change control |
R5
|
|
36.523-1 | TS | Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core (EPC); User Equipment (UE) conformance specification; Part 1: Protocol conformance specification | Under change control |
R5
|
|
36.523-2 | TS | Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core (EPC); User Equipment (UE) conformance specification; Part 2: Implementation Conformance Statement (ICS) proforma specification | Under change control |
R5
|
|